[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-800-30":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":670},{"id":5,"name":6,"category":7,"favorite":8},800,"一建建筑工程实务","建筑工程",0,30,50,2362,[13,38,53,67,79,94,109,124,139,151,163,175,190,205,217,229,241,256,270,282,294,303,318,333,345,359,369,383,395,407,419,430,444,456,468,482,494,509,521,536,548,560,574,588,600,610,620,632,644,658],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1144867,2,"多选题","施工现场灭火器的设置要求正确的有()。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","灭火器应设置在明显的地点，如房间出入口、通道、门厅及楼梯等部位",true,{"key":24,"text":25,"correct":22},"B","灭火器的铭牌必须朝外，以方便人们直接看到灭火器的主要性能指标",{"key":27,"text":28,"correct":29},"C","手提式灭火器设置在挂钩、托架上或灭火器箱内，其顶部离地面高度不应小于1.4m。底部离地面高度不不宜小于0.16m的要求",false,{"key":31,"text":32,"correct":29},"D","设置的挂钩、托架或灭火器箱内的手提式灭火器要竖直向下设置",{"key":34,"text":35,"correct":22},"E","对于施工现场环境较好的场所，手提式灭火器可直接放在地上","ABE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1144868,"施工现场消防器材配备正确的有()。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"临时搭设的建筑物区域内100㎡配备2只10L灭火器",{"key":24,"text":45,"correct":29},"施工现场办公区可以不建立防火检查制度",{"key":27,"text":47,"correct":22},"临时木工间、油漆间等，每25㎡配备一只灭火器",{"key":31,"text":49,"correct":22},"大型临时设施总面积超过1200㎡，应配有消防用的积水桶、黄沙池",{"key":34,"text":51,"correct":29},"临时木工间、油漆间等，每30㎡配备一只灭火器","ACD",{"id":54,"libraryId":5,"type":55,"typeLabel":56,"stem":57,"options":58,"answer":20,"analysis":37},1144869,1,"单选题","施工现场临时木料间、油漆间、木工机具间等，每25㎡配备灭火器至少为()只。",[59,61,63,65],{"key":20,"text":60,"correct":22},"一",{"key":24,"text":62,"correct":29},"二",{"key":27,"text":64,"correct":29},"四",{"key":31,"text":66,"correct":29},"六",{"id":68,"libraryId":5,"type":55,"typeLabel":56,"stem":69,"options":70,"answer":20,"analysis":37},1144870,"必须配备消防水桶的大型临时设施总面积至少应超过()。",[71,73,75,77],{"key":20,"text":72,"correct":22},"1200㎡",{"key":24,"text":74,"correct":29},"1300㎡",{"key":27,"text":76,"correct":29},"1400㎡",{"key":31,"text":78,"correct":29},"1500㎡",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":93,"analysis":37},1144871,"关于建筑工程施工现场灭火器设置要求的表述，正确的是()。",[83,85,87,89,91],{"key":20,"text":84,"correct":22},"灭火器应设置在明显的地点",{"key":24,"text":86,"correct":22},"灭火器的铭牌必须朝外",{"key":27,"text":88,"correct":29},"手提式灭火器设置在挂钩、托架上或灭火器箱内，其顶部离地面高度应小于1.00m，底部离地面高度不宜小于0.15m",{"key":31,"text":90,"correct":22},"设置的挂钩、托架上或灭火器箱内的手提式灭火器应正面竖直设置",{"key":34,"text":92,"correct":22},"灭火器不得设置在环境温度超出其使用温度范围的地点","ABDE",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":108,"analysis":37},1144872,"建筑工程施工现场消防管理中，关于易燃仓库的防火要求，下列说法中，正确的是()。",[98,100,102,104,106],{"key":20,"text":99,"correct":22},"易燃材料仓库应设在水源充足、消防车能驶到的地方，并应设在下风方向",{"key":24,"text":101,"correct":29},"易燃材料露天仓库四周内，应有宽度不小于5m的平坦空地作为消防通道，通道上禁止堆放障碍物",{"key":27,"text":103,"correct":22},"可燃材料库房单个房间的建筑面积不应超过30㎡",{"key":31,"text":105,"correct":22},"有明火的生产辅助区和生活用房与易燃材料之间，至少应保持30m的防火间距",{"key":34,"text":107,"correct":22},"对易引起火灾的仓库，应将库房内、外按每500㎡区域分段设立防火墙，把建筑平面划分为若干防火单元","ACDE",{"id":110,"libraryId":5,"type":15,"typeLabel":16,"stem":111,"options":112,"answer":123,"analysis":37},1144873,"施工现场电焊、气割场所的防火要求正确的有()。",[113,115,117,119,121],{"key":20,"text":114,"correct":29},"乙炔发生器和氧气瓶之间的存放距离不得少于3m",{"key":24,"text":116,"correct":29},"焊工应持证上岗，没带证时可以向工长说明便可上岗操作",{"key":27,"text":118,"correct":22},"氧气瓶、乙炔发生器等焊割设备上的安全附件应完整而有效，否则严禁使用",{"key":31,"text":120,"correct":29},"乙炔发生器和氧气瓶使用时两者的距离不得少于9m，与易燃易爆物品的距离不得少于20m",{"key":34,"text":122,"correct":22},"施工现场的焊、割作业，必须符合防火要求，严格执行“十不烧”规定","CE",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":138,"analysis":37},1144874,"下列施工现场的消防管理要求说法正确的有()。",[128,130,132,134,136],{"key":20,"text":129,"correct":22},"施工现场使用的电气设备必须符合防火要求。临时用电必须安装过载保护装置，电闸箱内不准使用易燃、可燃材料，严禁超负荷使用电气设备",{"key":24,"text":131,"correct":22},"电焊工、气焊工从事电气设备安装和电、气焊切割作业，要有操作证和动火证。动火证当日有效，动火地点变换，要重新办理动火证手续",{"key":27,"text":133,"correct":22},"施工现场从事油漆粉刷或防水等危险作业时，要有具体的防火要求和措施，必要时派专人看护",{"key":31,"text":135,"correct":29},"施工现场因工作需要、工期紧等原因，可以在建设工程现场内设置工人宿舍",{"key":34,"text":137,"correct":22},"施工现场氧气瓶、乙炔瓶工作间距不小于5m，两瓶与明火作业距离不小于10m","ABCE",{"id":140,"libraryId":5,"type":55,"typeLabel":56,"stem":141,"options":142,"answer":31,"analysis":37},1144875,"下列说法正确的是()。",[143,145,147,149],{"key":20,"text":144,"correct":29},"施工现场在配备灭火器后可以吸烟",{"key":24,"text":146,"correct":29},"施工现场内可以存放氧气瓶、乙炔瓶，可以使用液化石油气",{"key":27,"text":148,"correct":29},"施工现场氧气瓶、乙炔瓶工作间距不小于4m，两瓶与明火作业距离不小于6m",{"key":31,"text":150,"correct":22},"施工现场使用保温材料、装饰材料必须符合消防安全规定，不得使用易燃、可燃材料。不符合规定的材料，不得进入现场使用",{"id":152,"libraryId":5,"type":55,"typeLabel":56,"stem":153,"options":154,"answer":20,"analysis":37},1144876,"施工现场危险品与易燃品存放距离不得少于()m。",[155,157,159,161],{"key":20,"text":156,"correct":22},"30",{"key":24,"text":158,"correct":29},"60",{"key":27,"text":160,"correct":29},"90",{"key":31,"text":162,"correct":29},"120",{"id":164,"libraryId":5,"type":55,"typeLabel":56,"stem":165,"options":166,"answer":31,"analysis":37},1144877,"施工现场动火作业必须执行()制度。",[167,169,171,173],{"key":20,"text":168,"correct":29},"申报",{"key":24,"text":170,"correct":29},"检查",{"key":27,"text":172,"correct":29},"备案",{"key":31,"text":174,"correct":22},"审批",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":189,"analysis":37},1144878,"下列施工现场防火要求说法正确的有()。",[179,181,183,185,187],{"key":20,"text":180,"correct":29},"施工现场可在高压线下搭设临时性建筑物或堆放可燃物品",{"key":24,"text":182,"correct":22},"施工现场明确划分作业区、易燃可燃材料堆场、易燃废品集中站和生活区",{"key":27,"text":184,"correct":22},"施工现场夜间应有照明设施，保持车辆畅通，值班巡逻",{"key":31,"text":186,"correct":22},"施工组织设计中的施工平面图、施工方案均要求符合消防安全要求",{"key":34,"text":188,"correct":29},"施工现场明火作业与危险物品的距离不得少于20m","BCD",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":204,"analysis":37},1144879,"施工现场施工阶段的消防管理要求正确的有()。",[194,196,198,200,202],{"key":20,"text":195,"correct":22},"施工现场使用的电气设备必须符合防火要求。临时用电必须安装过载保护装置，电闸箱内不准使用易燃、可燃材料严禁超负荷使用电气设备",{"key":24,"text":197,"correct":22},"电焊工、气焊工从事电气设备安装和电、气焊切割作业，要有操作证和用火证。用火证当日有效，用火地点变换，要重新办理用火证手续",{"key":27,"text":199,"correct":22},"施工现场从事油漆粉刷或防水等危险作业时，要有具体的防火要求，必要时派专人看护",{"key":31,"text":201,"correct":29},"施工现场应工作需要、工期紧等原因，可以在建设工程现场内设置工人宿舍",{"key":34,"text":203,"correct":29},"施工现场氧气瓶、乙炔瓶工作间距不小于6m，两瓶与明火作业距离不小于12m","ABC",{"id":206,"libraryId":5,"type":55,"typeLabel":56,"stem":207,"options":208,"answer":20,"analysis":37},1144880,"施工现场危险物品与易燃易爆品的堆放距离不得少于()。",[209,211,213,215],{"key":20,"text":210,"correct":22},"30m",{"key":24,"text":212,"correct":29},"6m",{"key":27,"text":214,"correct":29},"9m",{"key":31,"text":216,"correct":29},"12m",{"id":218,"libraryId":5,"type":55,"typeLabel":56,"stem":219,"options":220,"answer":20,"analysis":37},1144881,"建筑工程施工现场施工阶段的消防管理要求中，氧气瓶、乙炔瓶工作间距不小于5m，两瓶与明火作业距离不小于()m。",[221,223,225,227],{"key":20,"text":222,"correct":22},"10",{"key":24,"text":224,"correct":29},"15",{"key":27,"text":226,"correct":29},"20",{"key":31,"text":228,"correct":29},"25",{"id":230,"libraryId":5,"type":55,"typeLabel":56,"stem":231,"options":232,"answer":31,"analysis":37},1144882,"关于大体积防水混凝土温度控制及养护的说法，正确的是()。",[233,235,237,239],{"key":20,"text":234,"correct":29},"中心温度与表面温度的差值不应大于20℃",{"key":24,"text":236,"correct":29},"表面温度与大气温度的差值不应大于25℃",{"key":27,"text":238,"correct":29},"温降梯度不得大于4℃\u002Fd",{"key":31,"text":240,"correct":22},"养护时间不应少于14d",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":255,"analysis":37},1144883,"施工BIM模型应包括()。",[245,247,249,251,253],{"key":20,"text":246,"correct":22},"深化设计模型",{"key":24,"text":248,"correct":29},"仿真计算模型",{"key":27,"text":250,"correct":29},"实验模型",{"key":31,"text":252,"correct":22},"施工过程模型",{"key":34,"text":254,"correct":22},"竣工验收模型","ADE",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":93,"analysis":37},1144884,"项目管理信息系统通常包括有()子系统。",[260,262,264,266,268],{"key":20,"text":261,"correct":22},"进度管理",{"key":24,"text":263,"correct":22},"质量管理",{"key":27,"text":265,"correct":29},"查询功能管理",{"key":31,"text":267,"correct":22},"材料及机械设备管理",{"key":34,"text":269,"correct":22},"文档资料管理",{"id":271,"libraryId":5,"type":55,"typeLabel":56,"stem":272,"options":273,"answer":24,"analysis":37},1144885,"评选“建筑业新技术应用示范工程”的项目,至少应推广应用《建筑业10项新技术(2010)》新技术()项。。",[274,276,278,280],{"key":20,"text":275,"correct":29},"5",{"key":24,"text":277,"correct":22},"6",{"key":27,"text":279,"correct":29},"7",{"key":31,"text":281,"correct":29},"8",{"id":283,"libraryId":5,"type":55,"typeLabel":56,"stem":284,"options":285,"answer":27,"analysis":37},1144886,"总承包商施工项目管理信息交流平台覆盖单位不应包括()。",[286,288,290,292],{"key":20,"text":287,"correct":29},"业主",{"key":24,"text":289,"correct":29},"分包商",{"key":27,"text":291,"correct":22},"政府主管部门",{"key":31,"text":293,"correct":29},"设计单位",{"id":295,"libraryId":5,"type":55,"typeLabel":56,"stem":296,"options":297,"answer":20,"analysis":37},1144887,"参评“建筑业新技术应用示范工程”的工程，应至少应用《建筑业十项新技术》推荐的建筑新技术的()项。",[298,299,300,301],{"key":20,"text":277,"correct":22},{"key":24,"text":279,"correct":29},{"key":27,"text":281,"correct":29},{"key":31,"text":302,"correct":29},"9",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":317,"analysis":37},1144888,"十项新技术中，属于装配式混凝土结构技术的有()。",[307,309,311,313,315],{"key":20,"text":308,"correct":29},"建筑用成型钢筋制品加工与配送技术",{"key":24,"text":310,"correct":22},"预制预应力混凝土构件技术",{"key":27,"text":312,"correct":22},"混凝土叠合楼板技术",{"key":31,"text":314,"correct":22},"夹心保温墙板技术",{"key":34,"text":316,"correct":22},"预制构件工厂化生产加工技术","BCDE",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":332,"analysis":37},1144889,"十项新技术中，不属于绿色施工技术的有()。",[322,324,326,328,330],{"key":20,"text":323,"correct":29},"施工现场太阳能、空气能利用技术",{"key":24,"text":325,"correct":29},"混凝土楼地面一次成型技术",{"key":27,"text":327,"correct":29},"建筑物墙体免抹灰技术",{"key":31,"text":329,"correct":22},"深基坑施工监测技术",{"key":34,"text":331,"correct":22},"基于GIS和物联网的建筑垃圾监管技术","DE",{"id":334,"libraryId":5,"type":55,"typeLabel":56,"stem":335,"options":336,"answer":31,"analysis":37},1144890,"关于建筑装饰装修工程高温施工环境温度控制的说法，正确的是()。",[337,339,341,343],{"key":20,"text":338,"correct":29},"塑料门窗储存的环境温度应低于60℃",{"key":24,"text":340,"correct":29},"抹灰环境温度不宜高于50℃",{"key":27,"text":342,"correct":29},"粘贴饰面砖环境温度不宜高于45℃",{"key":31,"text":344,"correct":22},"涂饰工程施工现场环境温度不宜高于35℃",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":36,"analysis":37},1144891,"关于高温天气施工的说法，正确的有()。",[349,351,353,355,357],{"key":20,"text":350,"correct":22},"混凝土坍落度不宜小于70mm",{"key":24,"text":352,"correct":22},"混凝土拌合物出机温度不宜大于30℃",{"key":27,"text":354,"correct":29},"普通混凝土浇筑入模温度不应高于38℃",{"key":31,"text":356,"correct":29},"涂饰工程施工现场环境温度不宜高于40℃",{"key":34,"text":358,"correct":22},"聚合物抹面胶浆拌合水温度不宜大于80℃，且不宜低于40℃",{"id":360,"libraryId":5,"type":55,"typeLabel":56,"stem":361,"options":362,"answer":27,"analysis":37},1144892,"高温天气施工，存放焊条的库房温度最大限值是()℃。",[363,364,366,368],{"key":20,"text":156,"correct":29},{"key":24,"text":365,"correct":29},"40",{"key":27,"text":367,"correct":22},"50",{"key":31,"text":158,"correct":29},{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":138,"analysis":37},1144893,"高温施工混凝土配合比调整的因素有()。",[373,375,377,379,381],{"key":20,"text":374,"correct":22},"环境温度",{"key":24,"text":376,"correct":22},"湿度",{"key":27,"text":378,"correct":22},"风力",{"key":31,"text":380,"correct":29},"混凝土初凝时间",{"key":34,"text":382,"correct":22},"采取的温控措施",{"id":384,"libraryId":5,"type":55,"typeLabel":56,"stem":385,"options":386,"answer":31,"analysis":37},1144894,"高温施工混凝土配合比设计的原则是()用量。",[387,389,391,393],{"key":20,"text":388,"correct":29},"低粗骨料",{"key":24,"text":390,"correct":29},"高拌合水",{"key":27,"text":392,"correct":29},"高细骨料",{"key":31,"text":394,"correct":22},"低水泥",{"id":396,"libraryId":5,"type":55,"typeLabel":56,"stem":397,"options":398,"answer":24,"analysis":37},1144895,"做涂饰工程的基层处理施工时，下列基层含水率不符合要求的是()。",[399,401,403,405],{"key":20,"text":400,"correct":29},"混凝土基层在涂刷溶剂型涂料时，含水率不得大于8%",{"key":24,"text":402,"correct":22},"抹灰基层在涂刷溶剂型涂料时，含水率不得大于10%",{"key":27,"text":404,"correct":29},"混凝土或抹灰基层在涂刷乳液型涂料时，含水率不得大于10%",{"key":31,"text":406,"correct":29},"木材基层的含水率不得大于12%",{"id":408,"libraryId":5,"type":55,"typeLabel":56,"stem":409,"options":410,"answer":31,"analysis":37},1144896,"关于涂饰工程基层处理，做法错误的是()。",[411,413,415,417],{"key":20,"text":412,"correct":29},"新建筑物的混凝土或抹灰基层在涂饰前应涂刷抗碱封闭底漆",{"key":24,"text":414,"correct":29},"旧墙面在涂饰前应清除疏松的旧装修层，并刷界面剂",{"key":27,"text":416,"correct":29},"厨房、卫生间墙面采用耐水腻子",{"key":31,"text":418,"correct":22},"混凝土基层含水率在8%～10%时涂刷溶剂型涂料",{"id":420,"libraryId":5,"type":55,"typeLabel":56,"stem":421,"options":422,"answer":27,"analysis":37},1144897,"雨期钢结构工程施工，焊接作业区的相对湿度最大限值是()%。",[423,425,427,428],{"key":20,"text":424,"correct":29},"70",{"key":24,"text":426,"correct":29},"85",{"key":27,"text":160,"correct":22},{"key":31,"text":429,"correct":29},"95",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":204,"analysis":37},1144898,"关于混凝土工程雨期施工的说法，正确的有()。",[434,436,438,440,442],{"key":20,"text":435,"correct":22},"对粗、细骨料含水率实时监测，及时调整混凝土配合比",{"key":24,"text":437,"correct":22},"选用具有防雨水冲刷性能的模板脱模剂",{"key":27,"text":439,"correct":22},"雨后应检查地基面的沉降，并应对模板及支架进行检查",{"key":31,"text":441,"correct":29},"大雨、暴雨天气不宜进行混凝土露天浇筑",{"key":34,"text":443,"correct":29},"梁板同时浇筑时应沿主梁方向浇筑",{"id":445,"libraryId":5,"type":55,"typeLabel":56,"stem":446,"options":447,"answer":24,"analysis":37},1144899,"雨期施工中，调整砌筑砂浆水胶比的最主要参数是()。",[448,450,452,454],{"key":20,"text":449,"correct":29},"外加剂含水量",{"key":24,"text":451,"correct":22},"砂的含水量",{"key":27,"text":453,"correct":29},"掺合物含水量",{"key":31,"text":455,"correct":29},"石子的含水量",{"id":457,"libraryId":5,"type":55,"typeLabel":56,"stem":458,"options":459,"answer":24,"analysis":37},1144900,"雨期施工中，砌筑工程每天砌筑高度最大限值是()m。",[460,462,464,466],{"key":20,"text":461,"correct":29},"0.8",{"key":24,"text":463,"correct":22},"1.2",{"key":27,"text":465,"correct":29},"1.5",{"key":31,"text":467,"correct":29},"1.6",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":93,"analysis":37},1144901,"关于砌体工程雨期施工的说法，正确的有()。",[472,474,476,478,480],{"key":20,"text":473,"correct":22},"烧结类块体的相对含水率60%～70%",{"key":24,"text":475,"correct":22},"每天砌筑高度不得超过1.2m",{"key":27,"text":477,"correct":29},"根据石子的含水量变化随时调整水灰比",{"key":31,"text":479,"correct":22},"湿拌砂浆根据气候条件采取遮阳、保温、防雨雪等措施",{"key":34,"text":481,"correct":22},"蒸压加气混凝土砌块的相对含水率40%～50%",{"id":483,"libraryId":5,"type":55,"typeLabel":56,"stem":484,"options":485,"answer":24,"analysis":37},1144902,"关于冬期建筑装饰装修工程施工的说法，正确的是()。",[486,488,490,492],{"key":20,"text":487,"correct":29},"室内抹灰，块料装饰工程施工与养护期间的温度不应低于0℃",{"key":24,"text":489,"correct":22},"油漆、刷浆、裱糊、玻璃工程，室外施工时，其最低环境温度不应低于5℃",{"key":27,"text":491,"correct":29},"室外喷、涂，刷油漆、高级涂料时，料浆使用温度宜保持5℃左右",{"key":31,"text":493,"correct":29},"塑料门窗当在不大于0℃的环境中存放时，与热源的距离不应小于0.5m",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":508,"analysis":37},1144903,"关于外墙外保温工程冬期施工的说法，正确的有()。",[498,500,502,504,506],{"key":20,"text":499,"correct":29},"施工最低温度不应低于-10℃",{"key":24,"text":501,"correct":22},"施工期间以及完工后24h内，基层及环境空气温度不应低于5℃",{"key":27,"text":503,"correct":22},"胶粘剂和聚合物抹面胶浆拌合温度皆应高于5℃",{"key":31,"text":505,"correct":29},"聚合物抹面胶浆拌合水温度不宜高于90℃，且不宜低于40℃",{"key":34,"text":507,"correct":29},"EPS板粘贴应保证有效粘贴面积大于30%","BC",{"id":510,"libraryId":5,"type":55,"typeLabel":56,"stem":511,"options":512,"answer":27,"analysis":37},1144904,"关于屋面保温工程施工的说法，正确的是()。",[513,515,517,519],{"key":20,"text":514,"correct":29},"采用沥青胶结的保温层应在气温不低于-15℃时施工",{"key":24,"text":516,"correct":29},"采用水泥的保温层应在气温不低于0℃时施工",{"key":27,"text":518,"correct":22},"干铺的保温层可在负温下施工",{"key":31,"text":520,"correct":29},"采用胶结料胶结的保温层应在气温不低于-10℃时施工",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":535,"analysis":37},1144905,"关于钢零件及钢部件的矫正和成型的说法，正确的有()。",[525,527,529,531,533],{"key":20,"text":526,"correct":22},"碳素结构钢在环境温度低于-16℃时，不应进行冷矫正",{"key":24,"text":528,"correct":29},"低合金结构钢在环境温度低于-10℃时，不应进行冷矫正",{"key":27,"text":530,"correct":22},"低合金钢工作地点温度低于-15℃时，不得剪切、冲孔",{"key":31,"text":532,"correct":29},"普通碳素结构钢工作地点温度低于-10℃时，不得剪切、冲孔",{"key":34,"text":534,"correct":22},"当工作地点温度低于-30℃时，不宜进行现场火焰切割作业。","ACE",{"id":537,"libraryId":5,"type":55,"typeLabel":56,"stem":538,"options":539,"answer":27,"analysis":37},1144906,"关于水泥砂浆防水层施工的说法，正确的是()。",[540,542,544,546],{"key":20,"text":541,"correct":29},"施工气温不应低于0℃",{"key":24,"text":543,"correct":29},"养护温度不宜低于-5℃",{"key":27,"text":545,"correct":22},"保持砂浆表面湿润",{"key":31,"text":547,"correct":29},"养护时间不得小于7d",{"id":549,"libraryId":5,"type":55,"typeLabel":56,"stem":550,"options":551,"answer":20,"analysis":37},1144907,"关于钢结构焊接加固的说法，正确的是()。",[552,554,556,558],{"key":20,"text":553,"correct":22},"由对应类别合格的焊工施焊",{"key":24,"text":555,"correct":29},"施焊镇静钢板的厚度不大于30mm时，环境空气温度不应低于-20℃",{"key":27,"text":557,"correct":29},"施焊镇静钢板的厚度超过30mm时，温度不应低于-5℃",{"key":31,"text":559,"correct":29},"当施焊沸腾钢板时，环境空气温度应高于I0℃",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":332,"analysis":37},1144908,"关于普通碳素结构钢、低合金钢工作地点温度控制的说法，正确的有()。",[564,566,568,570,572],{"key":20,"text":565,"correct":29},"普通碳素结构钢工作地点温度低于-25℃，不得剪切、冲孔",{"key":24,"text":567,"correct":29},"低合金钢工作地点温度低于-20℃时不得剪切、冲孔",{"key":27,"text":569,"correct":29},"普通碳素结构钢工作地点温度低于-18℃，不得进行冷矫正和冷弯曲",{"key":31,"text":571,"correct":22},"低合金结构钢工作地点温度低于-12℃时不得进行冷矫正和冷弯曲",{"key":34,"text":573,"correct":22},"工作地点温度低于-30℃时，不宜进行现场火焰切割作业",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":36,"analysis":37},1144909,"关于混凝土施工期间的测温项目与频次的说法，正确的有()。",[578,580,582,584,586],{"key":20,"text":579,"correct":22},"室外气温测量最高、最低气温",{"key":24,"text":581,"correct":22},"环境温度每昼夜不少于4次",{"key":27,"text":583,"correct":29},"搅拌机棚温度每一工作班不少于3次",{"key":31,"text":585,"correct":29},"外加剂溶液温度每一工作班不少于2次",{"key":34,"text":587,"correct":22},"混凝土出机、浇筑、入模温度每一工作班不少于4次",{"id":589,"libraryId":5,"type":55,"typeLabel":56,"stem":590,"options":591,"answer":20,"analysis":37},1144910,"关于混凝土拌合物出机温度、入模温度最小限值的说法，正确的是()℃。",[592,594,596,598],{"key":20,"text":593,"correct":22},"10，5",{"key":24,"text":595,"correct":29},"10,10",{"key":27,"text":597,"correct":29},"20，5",{"key":31,"text":599,"correct":29},"20,10",{"id":601,"libraryId":5,"type":55,"typeLabel":56,"stem":602,"options":603,"answer":31,"analysis":37},1144911,"某砌筑工程，冬期采用暖棚法施工，室内温度5℃，其养护时间是()d。",[604,606,608,609],{"key":20,"text":605,"correct":29},"3",{"key":24,"text":607,"correct":29},"4",{"key":27,"text":275,"correct":29},{"key":31,"text":279,"correct":22},{"id":611,"libraryId":5,"type":55,"typeLabel":56,"stem":612,"options":613,"answer":20,"analysis":37},1144912,"冬期施工砌体采用氯盐砂浆施工，每日砌筑高度不宜超过()m。",[614,615,617,618],{"key":20,"text":463,"correct":22},{"key":24,"text":616,"correct":29},"1.4",{"key":27,"text":465,"correct":29},{"key":31,"text":619,"correct":29},"1.8",{"id":621,"libraryId":5,"type":55,"typeLabel":56,"stem":622,"options":623,"answer":31,"analysis":37},1144913,"冬期拌制混凝土需采用加热原材料时，应优先采用加热()的方法。",[624,626,628,630],{"key":20,"text":625,"correct":29},"水泥",{"key":24,"text":627,"correct":29},"砂",{"key":27,"text":629,"correct":29},"石子",{"key":31,"text":631,"correct":22},"水",{"id":633,"libraryId":5,"type":55,"typeLabel":56,"stem":634,"options":635,"answer":31,"analysis":37},1144914,"冬期砂浆拌合水温、砂加热温度不宜超过()℃。",[636,638,640,642],{"key":20,"text":637,"correct":29},"90,50",{"key":24,"text":639,"correct":29},"90，40",{"key":27,"text":641,"correct":29},"80,50",{"key":31,"text":643,"correct":22},"80，40",{"id":645,"libraryId":5,"type":15,"typeLabel":16,"stem":646,"options":647,"answer":93,"analysis":37},1144915,"冬期施工混凝土配合比确定依据有()。",[648,650,652,654,656],{"key":20,"text":649,"correct":22},"环境气温",{"key":24,"text":651,"correct":22},"原材料",{"key":27,"text":653,"correct":29},"初凝时间",{"key":31,"text":655,"correct":22},"混凝土性能要求",{"key":34,"text":657,"correct":22},"养护方法",{"id":659,"libraryId":5,"type":55,"typeLabel":56,"stem":660,"options":661,"answer":24,"analysis":37},1144916,"冬期钢筋调直冷拉环境温度控制的最小限值是()℃。",[662,664,666,668],{"key":20,"text":663,"correct":29},"-30",{"key":24,"text":665,"correct":22},"-20",{"key":27,"text":667,"correct":29},"-10",{"key":31,"text":669,"correct":29},"-5",[671,674,677,680,683,686],{"id":55,"name":672,"category":7,"favorite":673},"领导干部任职前廉政法规知识测试题",92,{"id":675,"name":676,"category":7,"favorite":55},595,"建筑结构与设备",{"id":678,"name":679,"category":7,"favorite":55},715,"招标采购专业知识与法律法规",{"id":681,"name":682,"category":7,"favorite":55},848,"市政方向-通用基础",{"id":684,"name":685,"category":7,"favorite":8},534,"BIM工程师",{"id":687,"name":685,"category":7,"favorite":8},535]