[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-800-29":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":659},{"id":5,"name":6,"category":7,"favorite":8},800,"一建建筑工程实务","建筑工程",0,29,50,2362,[13,34,52,64,79,91,105,117,126,138,153,161,176,191,205,217,232,244,259,273,285,299,311,323,337,349,361,373,382,394,405,417,429,441,456,470,482,496,511,523,535,549,559,571,583,597,609,621,632,647],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1144816,1,"单选题","室内非埋地明敷主干线据地面高度不得小于()。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","2.5m",true,{"key":24,"text":25,"correct":26},"B","3.5m",false,{"key":28,"text":29,"correct":26},"C","4.5m",{"key":31,"text":32,"correct":26},"D","5.5m","",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":51,"analysis":33},1144817,2,"多选题","电源电压不应大于36V的部位是()。",[40,42,44,46,48],{"key":20,"text":41,"correct":22},"照明灯具离地面高度低于2.5m的现场办公区",{"key":24,"text":43,"correct":26},"木制品加工车间",{"key":28,"text":45,"correct":22},"比较潮湿的地方",{"key":31,"text":47,"correct":22},"人防工程",{"key":49,"text":50,"correct":22},"E","隧道工程","ACDE",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":20,"analysis":33},1144818,"配电系统应采用的配电方式是()。",[56,58,60,62],{"key":20,"text":57,"correct":22},"配电柜或总配电箱、分配电箱、开关箱三级配电方式",{"key":24,"text":59,"correct":26},"配电柜或总配电箱、分配电箱、开关箱四级配电方式",{"key":28,"text":61,"correct":26},"配电柜或总配电箱、分配电箱、开关箱一级配电方式",{"key":31,"text":63,"correct":26},"配电柜、总配电箱、分配电箱、开关箱二级配电方式",{"id":65,"libraryId":5,"type":36,"typeLabel":37,"stem":66,"options":67,"answer":78,"analysis":33},1144819,"关于电缆线路敷设的基本要求，下列说法正确的有()。",[68,70,72,74,76],{"key":20,"text":69,"correct":22},"电缆中必须包含全部工作芯线和作保护零线的芯线",{"key":24,"text":71,"correct":22},"电缆线路应采用埋地线或架空敷设",{"key":28,"text":73,"correct":26},"五芯电缆必须包含淡蓝、红两种颜色的绝缘芯线",{"key":31,"text":75,"correct":22},"直接埋地敷设的电缆过墙、过道、过临建设施时应套钢管保护",{"key":49,"text":77,"correct":26},"电缆线路可不设短路保护和过载保护","ABD",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":24,"analysis":33},1144820,"潮湿和易触及带电体场所的照明，电源电压不得大于()。",[83,85,87,89],{"key":20,"text":84,"correct":26},"12V",{"key":24,"text":86,"correct":22},"24V",{"key":28,"text":88,"correct":26},"36V",{"key":31,"text":90,"correct":26},"50V",{"id":92,"libraryId":5,"type":36,"typeLabel":37,"stem":93,"options":94,"answer":104,"analysis":33},1144821,"照明电源电压可以用36V的场所有()。",[95,97,98,100,102],{"key":20,"text":96,"correct":22},"高温场所",{"key":24,"text":47,"correct":22},{"key":28,"text":99,"correct":26},"金属容器内",{"key":31,"text":101,"correct":22},"比较潮湿的场所",{"key":49,"text":103,"correct":22},"净高低于2.5m的工人宿舍","ABDE",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":28,"analysis":33},1144822,"施工现场临时配电系统中，保护零线(P E)的配线颜色应为()。",[109,111,113,115],{"key":20,"text":110,"correct":26},"黄色",{"key":24,"text":112,"correct":26},"绿色",{"key":28,"text":114,"correct":22},"绿／黄双色",{"key":31,"text":116,"correct":26},"淡蓝色",{"id":118,"libraryId":5,"type":36,"typeLabel":37,"stem":119,"options":120,"answer":104,"analysis":33},1144823,"下列各种作业场所中，其照明电源电压可用36V的有()。",[121,122,123,124,125],{"key":20,"text":96,"correct":22},{"key":24,"text":47,"correct":22},{"key":28,"text":99,"correct":26},{"key":31,"text":101,"correct":22},{"key":49,"text":103,"correct":22},{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":20,"analysis":33},1144824,"下列说法中，符合施工现场操作电工管理规定的是()。",[130,132,134,136],{"key":20,"text":131,"correct":22},"施工现场操作电工必须经过国家现行标准考核合格后，持证上岗工作",{"key":24,"text":133,"correct":26},"施工现场非电工可以进行临时用电的操作",{"key":28,"text":135,"correct":26},"施工现场操作电工须配备绝缘鞋，才可进行操作",{"key":31,"text":137,"correct":26},"临时用电工程必须经编制和批准部门共同验收，合格后方可投入使用",{"id":139,"libraryId":5,"type":36,"typeLabel":37,"stem":140,"options":141,"answer":152,"analysis":33},1144825,"施工现场临时用电工程，电源中性点直接接地的220V\u002F380V三相四线制低压电力系统，下列各项中符合相关规定的有()。",[142,144,146,148,150],{"key":20,"text":143,"correct":22},"采用TN-S接零保护系统",{"key":24,"text":145,"correct":26},"采用二级配电系统",{"key":28,"text":147,"correct":22},"采用三级配电系统",{"key":31,"text":149,"correct":22},"采用二级漏电保护系统",{"key":49,"text":151,"correct":26},"采用三级漏电保护系统","ACD",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":20,"analysis":33},1144826,"下列各项中，符合施工现场操作电工管理规定的是()。",[157,158,159,160],{"key":20,"text":131,"correct":22},{"key":24,"text":133,"correct":26},{"key":28,"text":135,"correct":26},{"key":31,"text":137,"correct":26},{"id":162,"libraryId":5,"type":36,"typeLabel":37,"stem":163,"options":164,"answer":175,"analysis":33},1144827,"配电柜应装设的配备器具有()。",[165,167,169,171,173],{"key":20,"text":166,"correct":22},"电源隔离开关",{"key":24,"text":168,"correct":26},"静电保护器",{"key":28,"text":170,"correct":22},"电源漏电保护器",{"key":31,"text":172,"correct":26},"电源保护器",{"key":49,"text":174,"correct":22},"电源过载保护器","ACE",{"id":177,"libraryId":5,"type":36,"typeLabel":37,"stem":178,"options":179,"answer":190,"analysis":33},1144828,"各类用电人员上岗工作要求()。",[180,182,184,186,188],{"key":20,"text":181,"correct":22},"安全教育培训",{"key":24,"text":183,"correct":26},"自学临时用电标准掌握基本操作方法",{"key":28,"text":185,"correct":26},"有实际现场经验未经培训",{"key":31,"text":187,"correct":22},"掌握安全用电基本知识和所用设备性能",{"key":49,"text":189,"correct":22},"安全技术交底","ADE",{"id":192,"libraryId":5,"type":36,"typeLabel":37,"stem":193,"options":194,"answer":78,"analysis":33},1144829,"施工现场临时用电工程必须经过验收方可使用，需由()等部门共同验收。",[195,197,199,201,203],{"key":20,"text":196,"correct":22},"编制部门",{"key":24,"text":198,"correct":22},"审核部门",{"key":28,"text":200,"correct":26},"合约部门",{"key":31,"text":202,"correct":22},"批准部门",{"key":49,"text":204,"correct":26},"分包单位",{"id":206,"libraryId":5,"type":15,"typeLabel":16,"stem":207,"options":208,"answer":24,"analysis":33},1144830,"当采用专用变压器、TN-S接零保护供电系统的施工现场，电气设备的金属外壳必须与()连接。",[209,211,213,215],{"key":20,"text":210,"correct":26},"保护地线",{"key":24,"text":212,"correct":22},"保护零线",{"key":28,"text":214,"correct":26},"工作零线",{"key":31,"text":216,"correct":26},"工作地线",{"id":218,"libraryId":5,"type":36,"typeLabel":37,"stem":219,"options":220,"answer":231,"analysis":33},1144831,"临时用电组织设计及变更时须涉及到的人包括()。",[221,223,225,227,229],{"key":20,"text":222,"correct":26},"施工现场项目经理",{"key":24,"text":224,"correct":22},"具有法人资格企业的技术负责人",{"key":28,"text":226,"correct":26},"建设单位技术负责人",{"key":31,"text":228,"correct":22},"电气工程技术人员",{"key":49,"text":230,"correct":22},"现场监理","BDE",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":20,"analysis":33},1144833,"排水沟沿道路布置时，纵坡至少不得小于（）。",[236,238,240,242],{"key":20,"text":237,"correct":22},"0.2%",{"key":24,"text":239,"correct":26},"0.4%",{"key":28,"text":241,"correct":26},"0.6%",{"key":31,"text":243,"correct":26},"0.8%",{"id":245,"libraryId":5,"type":36,"typeLabel":37,"stem":246,"options":247,"answer":258,"analysis":33},1144834,"施工现场临时用水量计算包括()。",[248,250,252,254,256],{"key":20,"text":249,"correct":22},"现场施工用水量",{"key":24,"text":251,"correct":22},"施工机械用水量",{"key":28,"text":253,"correct":22},"施工现场生活用水量",{"key":31,"text":255,"correct":26},"基坑降水计算量",{"key":49,"text":257,"correct":22},"消防用水量","ABCE",{"id":260,"libraryId":5,"type":36,"typeLabel":37,"stem":261,"options":262,"answer":190,"analysis":33},1144835,"施工现场配水管网布置应符合下列原则是()。",[263,265,267,269,271],{"key":20,"text":264,"correct":22},"在保证不间断供水的情况下，管道铺设越短越好",{"key":24,"text":266,"correct":26},"施工期间各段管网应固定",{"key":28,"text":268,"correct":26},"主要供水管线采用枝状，孤立点可设环状",{"key":31,"text":270,"correct":22},"尽量利用已有的或提前修建的永久管道",{"key":49,"text":272,"correct":22},"管径要经过计算确定",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":28,"analysis":33},1144836,"管线穿过道路以防重压须埋入地下深度至少()。",[277,279,281,283],{"key":20,"text":278,"correct":26},"0.2m",{"key":24,"text":280,"correct":26},"0.4m",{"key":28,"text":282,"correct":22},"0.6m",{"key":31,"text":284,"correct":26},"0.8m",{"id":286,"libraryId":5,"type":36,"typeLabel":37,"stem":287,"options":288,"answer":175,"analysis":33},1144837,"关于施工现场消火栓间距和距房屋、路边的距离的说法，正确的有()。",[289,291,293,295,297],{"key":20,"text":290,"correct":22},"消火栓间距不应大于120m",{"key":24,"text":292,"correct":26},"消火栓距路边不宜大于3m",{"key":28,"text":294,"correct":22},"消火栓距路边不宜大于2m",{"key":31,"text":296,"correct":26},"消火栓距拟建房屋不应小于10m",{"key":49,"text":298,"correct":22},"消火栓距拟建房屋不应小于5m且不宜大于25m",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":20,"analysis":33},1144838,"施工现场室外消火栓间距不大于()。",[303,305,307,309],{"key":20,"text":304,"correct":22},"120m",{"key":24,"text":306,"correct":26},"140m",{"key":28,"text":308,"correct":26},"160m",{"key":31,"text":310,"correct":26},"180m",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":20,"analysis":33},1144839,"某工程现场临时用水总量Q=14.8L\u002Fs，管网中水流速度v=1.88m\u002Fs，该工程现场施工用水的供水管径宜选用()mm水管。",[315,317,319,321],{"key":20,"text":316,"correct":22},"100",{"key":24,"text":318,"correct":26},"150",{"key":28,"text":320,"correct":26},"200",{"key":31,"text":322,"correct":26},"250",{"id":324,"libraryId":5,"type":36,"typeLabel":37,"stem":325,"options":326,"answer":78,"analysis":33},1144840,"属于建筑工程施工主要职业危害种类的有()。",[327,329,331,333,335],{"key":20,"text":328,"correct":22},"粉尘危害",{"key":24,"text":330,"correct":22},"高温危害",{"key":28,"text":332,"correct":26},"安全防护缺陷危害",{"key":31,"text":334,"correct":22},"密闭空间危害",{"key":49,"text":336,"correct":26},"建筑设施卫生缺陷危害",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":24,"analysis":33},1144841,"在城市市区范围内从事建筑工程施工，项目必须向政府环境保护管理部门申报登记的时间是在工程开工()d内。",[341,343,345,347],{"key":20,"text":342,"correct":26},"7",{"key":24,"text":344,"correct":22},"15",{"key":28,"text":346,"correct":26},"30",{"key":31,"text":348,"correct":26},"90",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":24,"analysis":33},1144842,"下列职业病类型中，不属于电渣压力焊引发的是()。",[353,355,357,359],{"key":20,"text":354,"correct":26},"氮氧化合物中毒",{"key":24,"text":356,"correct":22},"矽尘肺",{"key":28,"text":358,"correct":26},"电光性皮炎",{"key":31,"text":360,"correct":26},"一氧化碳中毒",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":28,"analysis":33},1144843,"下列有关节地与施工用地保护的技术要点描述正确的是()。",[365,367,369,371],{"key":20,"text":366,"correct":26},"临时设施占地面积有效利用率大于95%",{"key":24,"text":368,"correct":26},"施工现场内避免形成环形通路，减少道路占用土地",{"key":28,"text":370,"correct":22},"红线外临时占地应尽量使用荒地.废地，少占用农田和耕地",{"key":31,"text":372,"correct":26},"临时设施的占地面积应按用地指标所需的最多面积设计",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":24,"analysis":33},1144844,"下列不属于电渣压力焊易发的职业病类型的是()。",[377,378,380,381],{"key":20,"text":354,"correct":26},{"key":24,"text":379,"correct":22},"电焊尘肺",{"key":28,"text":358,"correct":26},{"key":31,"text":360,"correct":26},{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":28,"analysis":33},1144845,"位于闹市区工程现场设置的封闭围挡高度应至少()m。",[386,388,390,392],{"key":20,"text":387,"correct":26},"1.8",{"key":24,"text":389,"correct":26},"2.0",{"key":28,"text":391,"correct":22},"2.5",{"key":31,"text":393,"correct":26},"3.0",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":31,"analysis":33},1144846,"施工作业人员如发生法定传染病、食物中毒或急性职业中毒时，必须要在()h内向所在地建设行政主管部门和卫生防疫等部门进行报告。",[398,400,402,404],{"key":20,"text":399,"correct":26},"0.5",{"key":24,"text":401,"correct":26},"1.0",{"key":28,"text":403,"correct":26},"1.5",{"key":31,"text":389,"correct":22},{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":20,"analysis":33},1144847,"施工单位申领《污水排水许可证》的部门是()。",[409,411,413,415],{"key":20,"text":410,"correct":22},"市政管理部门",{"key":24,"text":412,"correct":26},"环境卫生管理部门",{"key":28,"text":414,"correct":26},"环境保护管理部门",{"key":31,"text":416,"correct":26},"建没行政主管部",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":28,"analysis":33},1144848,"可不在现场入口处醒目位置公示的内容是()。",[421,423,425,427],{"key":20,"text":422,"correct":26},"工程概况",{"key":24,"text":424,"correct":26},"安全规定",{"key":28,"text":426,"correct":22},"质量管理措施",{"key":31,"text":428,"correct":26},"文明施工规定",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":20,"analysis":33},1144849,"建筑工程施工现场环境保护要求中，施工现场产生的固体废弃物应在所在地县级以上地方人民政府()部门申报登记，分类存放。",[433,435,437,439],{"key":20,"text":434,"correct":22},"环卫",{"key":24,"text":436,"correct":26},"城管",{"key":28,"text":438,"correct":26},"卫生管理",{"key":31,"text":440,"correct":26},"市政管理",{"id":442,"libraryId":5,"type":36,"typeLabel":37,"stem":443,"options":444,"answer":455,"analysis":33},1144850,"关于现场宿舍管理的说法，正确的有()。",[445,447,449,451,453],{"key":20,"text":446,"correct":26},"现场宿舍必须设置推拉式窗户",{"key":24,"text":448,"correct":22},"宿舍内的床铺不得超过2层",{"key":28,"text":450,"correct":22},"宿舍室内净高不得小于2.5m",{"key":31,"text":452,"correct":26},"宿舍内通道宽度不得小于0.8m",{"key":49,"text":454,"correct":26},"每间宿舍居住人员不得超过18人","BC",{"id":457,"libraryId":5,"type":36,"typeLabel":37,"stem":458,"options":459,"answer":231,"analysis":33},1144851,"关于现场食堂卫生与防疫管理的说法，正确的有()。",[460,462,464,466,468],{"key":20,"text":461,"correct":26},"现场食堂应设置独立的制作间、储藏间，门扇下方应设不低于0.1m的防鼠挡板，配备必要的排风设施和冷藏设施",{"key":24,"text":463,"correct":22},"燃气罐应单独设置存放间，存放间应通风良好并严禁存放其他物品",{"key":28,"text":465,"correct":26},"现场食堂的制作间灶台及其周边应铺贴瓷砖，所贴瓷砖高度不宜小于1.2m，地面应做硬化和防滑处理",{"key":31,"text":467,"correct":22},"现场食堂储藏室的粮食存放台距墙和地面应大于0.2m，食品应有遮盖，遮盖物品应有正反面标识",{"key":49,"text":469,"correct":22},"现场食堂必须办理卫生许可证，炊事人员必须持身体健康证上岗，上岗应穿戴洁净的工作服，不得穿工作服出食堂",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":28,"analysis":33},1144852,"关于施工现场工人宿舍的说法，正确的是()。",[474,476,478,480],{"key":20,"text":475,"correct":26},"室内净高不得小于2.2m，通道宽度不得小于0.9m，每间宿舍居住人员不得超过12人",{"key":24,"text":477,"correct":26},"室内净高不得小于2.2m，通道宽度不得小于1.0m，每间宿舍居住人员不得超过16人",{"key":28,"text":479,"correct":22},"室内净高不得小于2.5m，通道宽度不得小于0.9m，每间宿舍居住人员不得超过16人",{"key":31,"text":481,"correct":26},"室内净高不得小于2.5m，通道宽度不得小于1.0m，每间宿舍居住人员不得超过12人",{"id":483,"libraryId":5,"type":36,"typeLabel":37,"stem":484,"options":485,"answer":258,"analysis":33},1144853,"属于劳动者享有的职业卫生保护权利的有()。",[486,488,490,492,494],{"key":20,"text":487,"correct":22},"有获得职业卫生教育、培训的权利",{"key":24,"text":489,"correct":22},"有获得职业健康检查、职业病诊疗、康复等职业病防治服务的权利",{"key":28,"text":491,"correct":22},"有要求用人单位提供符合防治职业病要求的职业病防护设施和个人使用的职业病防护用具、用品，改善工作条件的权利",{"key":31,"text":493,"correct":26},"对违反职业病防治法律、法规以及危及生命健康的行为有提出批评、检举、控告、处罚的权利",{"key":49,"text":495,"correct":22},"有拒绝违章指挥和强令进行没有职业病防护措施作业的权利",{"id":497,"libraryId":5,"type":36,"typeLabel":37,"stem":498,"options":499,"answer":510,"analysis":33},1144854,"关于绿色施工评价标准的说法，正确的有()。",[500,502,504,506,508],{"key":20,"text":501,"correct":26},"绿色建筑的评价以建筑群为对象，通常情况下，不对单栋建筑实施评价",{"key":24,"text":503,"correct":22},"对新建、扩建与改建的住宅或公共建筑的评价，应在其投入使用一年后进行",{"key":28,"text":505,"correct":26},"绿色施工评价应从设计阶段开始，直至施工阶段结束，需按《绿色施工评价标准》要求提交设计、施工相关文档",{"key":31,"text":507,"correct":22},"按满足一般项数和优选项数的程度，绿色建筑共划分为三个等级",{"key":49,"text":509,"correct":26},"绿色建筑评价指标体系由节地与室外环境、节能与能源利用、节水与水资源利用、节材与材料资源利用、室内环境质量和运营管理六类指标组成","BD",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":28,"analysis":33},1144855,"关于绿色施工“四节一环保”中的“四节”不包括()。",[515,517,519,521],{"key":20,"text":516,"correct":26},"节地",{"key":24,"text":518,"correct":26},"节材",{"key":28,"text":520,"correct":22},"节电",{"key":31,"text":522,"correct":26},"节水",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":28,"analysis":33},1144856,"关于建筑施工现场环境保护与安全文明施工的说法，正确的是（）。",[527,529,531,533],{"key":20,"text":528,"correct":26},"施工现场内严禁焚烧各类废弃物，但是经过简单处理可将有毒有害废弃物作土方回填",{"key":24,"text":530,"correct":26},"现场主出入口可以不设置保安值班室",{"key":28,"text":532,"correct":22},"现场宿舍必须设置可开启式窗户，宿舍内的床铺不得超过2层，严禁使用通铺",{"key":31,"text":534,"correct":26},"在建工程经审批后可以住人",{"id":536,"libraryId":5,"type":36,"typeLabel":37,"stem":537,"options":538,"answer":258,"analysis":33},1144857,"根据《绿色建筑评价标准》(GB\u002FT50378)，关于节能与能源利用的技术要点，下列表述中，正确的是()。",[539,541,543,545,547],{"key":20,"text":540,"correct":22},"制定合理施工能耗指标，提高施工能源利用率",{"key":24,"text":542,"correct":22},"优先使用国家、行业推荐的节能、高效、环保的施工设备和机具",{"key":28,"text":544,"correct":22},"临时设施宜采用节能材料，墙体、屋面使用隔热性能好的材料，减少夏天空调、冬天取暖设备的使用时间及耗能量",{"key":31,"text":546,"correct":26},"临时用电优先选用节能电线和节能灯具，照明设计以满足最低照度为原则，照度不应超过最低照度的10%",{"key":49,"text":548,"correct":22},"施工现场分别设定生产、生活、办公和施工设备的用电控制指标，定期进行计量、核算、对比分析，并有预防与纠正措施",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":31,"analysis":33},1144858,"关于现场宿舍空间的说法，正确的是()。",[553,555,556,558],{"key":20,"text":554,"correct":26},"室内净高不得小于2.2m，通道宽度不得小于1.0m，每间宿舍居住人员不得超过10人",{"key":24,"text":475,"correct":26},{"key":28,"text":557,"correct":26},"室内净高不得小于2.4m，通道宽度不得小于1.0m，每间宿舍居住人员不得超过12人",{"key":31,"text":479,"correct":22},{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":24,"analysis":33},1144859,"施工现场进行一级动火作业前，应由()审核批准。",[563,565,567,569],{"key":20,"text":564,"correct":26},"安全监理工程师",{"key":24,"text":566,"correct":22},"企业安全管理部门",{"key":28,"text":568,"correct":26},"项目负责人",{"key":31,"text":570,"correct":26},"项目安全管理部门",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":20,"analysis":33},1144860,"下列各选项中，属施工现场防火制度范畴的是()。",[575,577,579,581],{"key":20,"text":576,"correct":22},"建立动用明火审批制度",{"key":24,"text":578,"correct":26},"建立义务消防队，人数不少于施工总人数12%",{"key":28,"text":580,"correct":26},"搭设现场临时吸烟室",{"key":31,"text":582,"correct":26},"建立义务消防车队，车辆不少于1辆",{"id":584,"libraryId":5,"type":36,"typeLabel":37,"stem":585,"options":586,"answer":596,"analysis":33},1144861,"施工现场防火制度的要求正确的有()。",[587,589,591,592,594],{"key":20,"text":588,"correct":22},"施工现场都要建立健全防火安全制度",{"key":24,"text":590,"correct":22},"建立义务消防队，人数不少于施工总人数的10%",{"key":28,"text":576,"correct":22},{"key":31,"text":593,"correct":26},"易燃、易爆物品单独存放不需建立防火制度",{"key":49,"text":595,"correct":26},"建立义务消防队，人数不少于施工总人数的8%","ABC",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":20,"analysis":33},1144862,"施工现场义务消防队员人数占施工总人数的百分比至少不少于()。",[601,603,605,607],{"key":20,"text":602,"correct":22},"10%",{"key":24,"text":604,"correct":26},"15%",{"key":28,"text":606,"correct":26},"20%",{"key":31,"text":608,"correct":26},"25%",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":31,"analysis":33},1144863,"关于施工现场动火审批的说法，正确的是()。",[613,615,617,619],{"key":20,"text":614,"correct":26},"一级动火作业应编制防火安全技术措施报批",{"key":24,"text":616,"correct":26},"二级动火作业由项目安全管理部门审查批准",{"key":28,"text":618,"correct":26},"三级动火作业由项目责任工程师填写动火申请表",{"key":31,"text":620,"correct":22},"动火证当日有效",{"id":622,"libraryId":5,"type":36,"typeLabel":37,"stem":623,"options":624,"answer":596,"analysis":33},1144864,"关于施工现场防火制度说法正确的有()。",[625,627,628,629,631],{"key":20,"text":626,"correct":22},"施工现场都要建立健全防火检查制度",{"key":24,"text":590,"correct":22},{"key":28,"text":576,"correct":22},{"key":31,"text":630,"correct":26},"易燃、易爆物品单独存放库不需建立防火制度",{"key":49,"text":595,"correct":26},{"id":633,"libraryId":5,"type":36,"typeLabel":37,"stem":634,"options":635,"answer":646,"analysis":33},1144865,"下列施工现场易燃仓库的防火要求说法正确的有()。",[636,638,640,642,644],{"key":20,"text":637,"correct":26},"易着火的仓库应设在水源充足、消防车能驶到位的地方，并应设在上风方",{"key":24,"text":639,"correct":22},"仓库或堆料场严禁使用碘钨灯，以防电气设备起火",{"key":28,"text":641,"correct":22},"安装的开关箱、接线盒，距离堆垛外缘不小于1.5m，不准乱拉临时电气线路",{"key":31,"text":643,"correct":22},"对贮存的易燃货物应经常进行防火安全检查，应保持良好通风",{"key":49,"text":645,"correct":22},"仓库或堆料场所使用的照明灯与易燃堆垛间至少应保持1m的距离","BCDE",{"id":648,"libraryId":5,"type":15,"typeLabel":16,"stem":649,"options":650,"answer":31,"analysis":33},1144866,"施工现场装饰施工阶段的消防管理要求是()。",[651,653,655,657],{"key":20,"text":652,"correct":26},"装饰装修施工现场在配备灭火器时可以吸烟",{"key":24,"text":654,"correct":26},"装饰装修施工现场内可以存放氧气瓶、乙炔瓶，可以使用液化石油气",{"key":28,"text":656,"correct":26},"装饰装修施工现场氧气瓶、乙炔瓶工作间距不小于4m，两瓶与明火作业距离不小于6m",{"key":31,"text":658,"correct":22},"施工现场使用的安全网、保温材料必须符合消防安全规定，不得使用易燃、可燃材料。不符合规定的材料，不得进入现场使用",[660,663,666,669,672,675],{"id":15,"name":661,"category":7,"favorite":662},"领导干部任职前廉政法规知识测试题",92,{"id":664,"name":665,"category":7,"favorite":15},595,"建筑结构与设备",{"id":667,"name":668,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":670,"name":671,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":673,"name":674,"category":7,"favorite":8},534,"BIM工程师",{"id":676,"name":674,"category":7,"favorite":8},535]