[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-800-28":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":655},{"id":5,"name":6,"category":7,"favorite":8},800,"一建建筑工程实务","建筑工程",0,28,50,2362,[13,34,46,58,70,82,100,115,127,139,154,166,178,190,202,214,229,243,254,264,276,291,306,318,330,342,354,366,381,393,407,422,434,446,461,473,485,493,505,517,529,541,555,569,581,593,605,616,628,643],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1144765,1,"单选题","氟碳漆施工中，粗找平腻子工序的批刮遍数是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","1",false,{"key":24,"text":25,"correct":22},"B","2",{"key":27,"text":28,"correct":29},"C","3",true,{"key":31,"text":32,"correct":22},"D","4","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1144766,"关于氟碳漆施工流程的说法，正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"基层处理→分格缝切割→粗找平腻子施工→分格缝填充→细找平腻子施工→铺挂玻纤网→满批抛光腻子→喷涂底涂→喷涂中涂→喷涂面涂→罩光油→分格缝描涂",{"key":24,"text":41,"correct":22},"基层处理→分格缝切割→粗找平腻子施工→分格缝填充→铺挂玻纤网→细找平腻子施工→满批抛光腻子→喷涂底涂→喷涂中涂→喷涂面涂→罩光油→分格缝描涂",{"key":27,"text":43,"correct":22},"基层处理→分格缝切割→粗找平腻子施工→铺挂玻纤网→分格缝填充→细找平腻子施工→满批抛光腻子→喷涂底涂→喷涂中涂→喷涂面涂→罩光油→分格缝描涂",{"key":31,"text":45,"correct":29},"基层处理→铺挂玻纤网→分格缝切割→粗找平腻子施工→分格缝填充→细找平腻子施工→满批抛光腻子→喷涂底涂→喷涂中涂→喷涂面涂→罩光油→分格缝描涂",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1144767,"裱糊刮腻子前应用（ ）涂刷抹灰基层。",[50,52,54,56],{"key":20,"text":51,"correct":22},"素水泥浆",{"key":24,"text":53,"correct":22},"防水涂料",{"key":27,"text":55,"correct":29},"抗碱封闭底漆",{"key":31,"text":57,"correct":22},"防火涂料",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1144768,"关于裱糊工程工艺流程的说法，正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"基层处理→放线→刷封闭底胶→裁纸→刷胶→裱贴",{"key":24,"text":65,"correct":22},"基层处理→刷封闭底胶→裁纸→放线→刷胶→裱贴",{"key":27,"text":67,"correct":22},"基层处理→放线→刷封闭底胶→刷胶→裁纸→裱贴",{"key":31,"text":69,"correct":29},"基层处理→刷基膜→放线→裁纸→刷胶→裱贴",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1144769,"建筑幕墙是（ ）的建筑外围护结构。",[74,76,78,80],{"key":20,"text":75,"correct":22},"可承担主体结构所承受荷载与作用",{"key":24,"text":77,"correct":22},"可承担主体结构所承受部分荷载与作用",{"key":27,"text":79,"correct":29},"不承担主体结构所承受荷载与作用",{"key":31,"text":81,"correct":22},"只承受幕墙自重荷载",{"id":83,"libraryId":5,"type":84,"typeLabel":85,"stem":86,"options":87,"answer":99,"analysis":33},1144770,2,"多选题","关于建筑幕墙工程的“三性试验”，具体是指（ ）。",[88,90,92,94,96],{"key":20,"text":89,"correct":22},"抗震性能",{"key":24,"text":91,"correct":29},"气密性能",{"key":27,"text":93,"correct":22},"隔声性能",{"key":31,"text":95,"correct":29},"水密性能",{"key":97,"text":98,"correct":29},"E","风压变形性能","BDE",{"id":101,"libraryId":5,"type":84,"typeLabel":85,"stem":102,"options":103,"answer":114,"analysis":33},1144771,"属于构件式玻璃幕墙的有（ ）幕墙。",[104,106,108,110,112],{"key":20,"text":105,"correct":22},"全玻",{"key":24,"text":107,"correct":29},"明框玻璃",{"key":27,"text":109,"correct":29},"半隐框玻璃",{"key":31,"text":111,"correct":29},"隐框玻璃",{"key":97,"text":113,"correct":22},"点支承玻璃","BCD",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":27,"analysis":33},1144772,"防止建筑幕墙构件腐蚀所采取的隔离措施是在（ ）之间衬隔离垫片。",[119,121,123,125],{"key":20,"text":120,"correct":22},"铝合金型材与不锈钢紧固件",{"key":24,"text":122,"correct":22},"铝合金上、下立柱",{"key":27,"text":124,"correct":29},"铝合金型材与镀锌钢连接件",{"key":31,"text":126,"correct":22},"防雷均压环与连接钢材",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":31,"analysis":33},1144773,"关于构件式玻璃幕墙横梁安装的说法，正确的是（ ）。",[131,133,135,137],{"key":20,"text":132,"correct":22},"铝合金型材跨度不大于1.2m时，其截面主要受力部位的厚度不应小于1.5mm",{"key":24,"text":134,"correct":22},"铝合金型材跨度大于1.2m时，其截面主要受力部位的厚度不应小于1.5mm",{"key":27,"text":136,"correct":22},"钢型材其截面主要受力部位的厚度不应小于2.0mm",{"key":31,"text":138,"correct":29},"横梁与立柱连接处，设置柔性垫片或预留1～2mm的间隙",{"id":140,"libraryId":5,"type":84,"typeLabel":85,"stem":141,"options":142,"answer":153,"analysis":33},1144774,"必须采用硅酮结构密封胶粘接的建筑幕墙受力接缝有（ ）。",[143,145,147,149,151],{"key":20,"text":144,"correct":29},"隐框玻璃幕墙玻璃与铝框的连接",{"key":24,"text":146,"correct":22},"明框玻璃幕墙玻璃与铝框的连接",{"key":27,"text":148,"correct":29},"全玻幕墙的玻璃面板与玻璃肋的连接",{"key":31,"text":150,"correct":22},"点支承玻璃幕墙玻璃面板之间的连接",{"key":97,"text":152,"correct":22},"倒挂玻璃顶玻璃与框架之间的连接","AC",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},1144775,"关于构件式玻璃幕墙开启窗的说法，正确的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"开启角度不宜大于40°，开启距离不宜大于300mm",{"key":24,"text":161,"correct":22},"开启角度不宜大于40°，开启距离不宜大于400mm",{"key":27,"text":163,"correct":29},"开启角度不宜大于30°，开启距离不宜大于300mm",{"key":31,"text":165,"correct":22},"开启角度不宜大于30°，开启距离不宜大于400mm",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1144776,"关于半隐框、隐框玻璃幕墙面板采用硅酮耐候密封胶嵌缝的说法，正确的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"密封胶在接缝内应与槽壁、槽底实行三面粘接",{"key":24,"text":173,"correct":29},"密封胶的施工厚度应大于3.5mm，一般应控制在3.5～4.5mm",{"key":27,"text":175,"correct":22},"密封胶的施工宽度不宜小于施工厚度",{"key":31,"text":177,"correct":22},"结构密封胶可代替耐候密封胶使用，耐候密封胶不允许代替结构密封胶使用",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1144777,"关于玻璃面板安装的说法，错误的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"玻璃面板出厂前，应按规格进行编号",{"key":24,"text":185,"correct":29},"固定点的间距不宜大于500mm",{"key":27,"text":187,"correct":22},"隐框玻璃幕墙采用挂钩式固定玻璃板块时，挂钩接触面宜设置柔性垫片",{"key":31,"text":189,"correct":22},"幕墙开启窗的开启角度不宜大于30°",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},1144778,"下列不符合构件式玻璃幕墙中硅酮建筑密封胶施工要求的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"硅酮建筑密封胶的施工厚度应大于3.5mm",{"key":24,"text":197,"correct":22},"硅酮建筑密封胶的施工宽度不宜小于施工厚度的2倍",{"key":27,"text":199,"correct":22},"较深的密封槽口底部应采用聚乙烯发泡材料填塞",{"key":31,"text":201,"correct":29},"硅酮建筑密封胶在接缝内应三面粘接",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},1144779,"关于全玻幕墙安装符合技术要求的说法，正确的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"不允许在现场打注硅酮结构密封胶",{"key":24,"text":209,"correct":22},"采用镀膜玻璃时，应使用酸性硅酮结构密封胶嵌缝",{"key":27,"text":211,"correct":22},"玻璃面板与装修面或结构面之间的空隙不应留有缝隙",{"key":31,"text":213,"correct":29},"吊挂玻璃下端与下槽底应留有缝隙",{"id":215,"libraryId":5,"type":84,"typeLabel":85,"stem":216,"options":217,"answer":228,"analysis":33},1144780,"对于金属与石材幕墙工程，选用密封胶的原则正确的有（ ）。",[218,220,222,224,226],{"key":20,"text":219,"correct":29},"同一工程应采用同一品牌单组分或双组分的硅酮结构密封胶",{"key":24,"text":221,"correct":22},"同一工程不得同时采用超过2个品牌的硅酮结构密封胶",{"key":27,"text":223,"correct":29},"同一工程应采用同一品牌的硅酮结构密封胶和硅酮耐候密封胶配套使用",{"key":31,"text":225,"correct":29},"应对石材幕墙用的密封胶的污染性指标进行复验，金属幕墙用的密封胶的污染性指标可不复验",{"key":97,"text":227,"correct":22},"石材幕墙面板与金属挂件间应采用硅酮结构密封胶粘接","ACD",{"id":230,"libraryId":5,"type":84,"typeLabel":85,"stem":231,"options":232,"answer":99,"analysis":33},1144781,"可作为点支承玻璃幕墙面板的玻璃有（ ）。",[233,235,237,239,241],{"key":20,"text":234,"correct":22},"半钢化中空玻璃",{"key":24,"text":236,"correct":29},"单片钢化玻璃",{"key":27,"text":238,"correct":22},"普通平板夹层玻璃",{"key":31,"text":240,"correct":29},"钢化夹层玻璃",{"key":97,"text":242,"correct":29},"超白钢化玻璃",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":31,"analysis":33},1144782,"采用玻璃肋支承的点支承玻璃幕墙，其玻璃肋应是（ ）。",[247,249,251,253],{"key":20,"text":248,"correct":22},"钢化玻璃",{"key":24,"text":250,"correct":22},"夹层玻璃",{"key":27,"text":252,"correct":22},"净片玻璃",{"key":31,"text":240,"correct":29},{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":24,"analysis":33},1144783,"点支承玻璃幕墙，当采用玻璃肋作支承结构时，其玻璃肋应选用（ ）。",[258,260,261,263],{"key":20,"text":259,"correct":22},"夹层平板玻璃",{"key":24,"text":240,"correct":29},{"key":27,"text":262,"correct":22},"半钢化夹层玻璃",{"key":31,"text":248,"correct":22},{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":24,"analysis":33},1144784,"石材幕墙工程的石材面板与金属挂件之间应采用（ ）粘结固定。",[268,270,272,274],{"key":20,"text":269,"correct":22},"云石胶",{"key":24,"text":271,"correct":29},"干挂石材环氧胶粘剂",{"key":27,"text":273,"correct":22},"聚硫胶",{"key":31,"text":275,"correct":22},"硅酮结构胶",{"id":277,"libraryId":5,"type":84,"typeLabel":85,"stem":278,"options":279,"answer":290,"analysis":33},1144785,"石材幕墙的面板与骨架的连接有（ ）方式。",[280,282,284,286,288],{"key":20,"text":281,"correct":22},"钢销式",{"key":24,"text":283,"correct":29},"通槽式",{"key":27,"text":285,"correct":29},"短槽式",{"key":31,"text":287,"correct":22},"支撑式",{"key":97,"text":289,"correct":29},"背栓式","BCE",{"id":292,"libraryId":5,"type":84,"typeLabel":85,"stem":293,"options":294,"answer":305,"analysis":33},1144786,"关于建筑幕墙防火技术要点的说法，正确的有（ ）。",[295,297,299,301,303],{"key":20,"text":296,"correct":29},"幕墙与各层楼板、隔墙外沿间的缝隙，填充材料可采用岩棉或矿棉",{"key":24,"text":298,"correct":22},"防火层应采用厚度不小于1.0mm的镀锌钢板承托",{"key":27,"text":300,"correct":29},"承托板与主体结构、幕墙结构及承托板之间的缝隙应采用防火密封胶密封",{"key":31,"text":302,"correct":29},"防火层不应与玻璃直接接触，防火材料朝玻璃面处宜采用装饰材料覆盖",{"key":97,"text":304,"correct":29},"同一幕墙玻璃单元不应跨越两个防火分区","ACDE",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":20,"analysis":33},1144787,"幕墙与各层楼板、隔墙外沿间的缝隙，应采用不燃材料封堵，填充材料可采用岩棉或矿棉，其厚度不应小于（ ）mm。",[310,312,314,316],{"key":20,"text":311,"correct":29},"100",{"key":24,"text":313,"correct":22},"90",{"key":27,"text":315,"correct":22},"50",{"key":31,"text":317,"correct":22},"70",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":27,"analysis":33},1144788,"根据《建筑设计防火规范》的规定，关于建筑幕墙防火设计的表述中，错误的是（ ）。",[322,324,326,328],{"key":20,"text":323,"correct":22},"幕墙与各层楼板之间应采用不燃材料封堵",{"key":24,"text":325,"correct":22},"隔板外沿间的缝隙填充材料可采用岩棉或矿棉，其厚度不应小于100mm",{"key":27,"text":327,"correct":29},"无窗间墙和窗槛墙的幕墙，应在每层楼板外沿设置耐火极限不低于0.50h",{"key":31,"text":329,"correct":22},"同一幕墙玻璃单不应跨越二个防火分区",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":27,"analysis":33},1144789,"关于保温工程质量的说法，正确的是（ ）。",[334,336,338,340],{"key":20,"text":335,"correct":22},"屋面泡沫混凝土分层浇筑、终凝后应进行至少14d的保湿养护",{"key":24,"text":337,"correct":22},"屋面保温材料必须在环境温度零度以上施工",{"key":27,"text":339,"correct":29},"在5级以上大风天气和雨天外墙保温工程不得施工",{"key":31,"text":341,"correct":22},"底层距室外地面3m高的范围内须铺设加强网",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":27,"analysis":33},1144790,"幕墙的（ ）是为了避免非透明幕墙部位内部结露导致保温材料发生性状改变而采取的构造措施。",[346,348,350,352],{"key":20,"text":347,"correct":22},"隔热层",{"key":24,"text":349,"correct":22},"防火层",{"key":27,"text":351,"correct":29},"隔汽层",{"key":31,"text":353,"correct":22},"防水层",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":27,"analysis":33},1144791,"幕墙与周边墙体间应采用（ ）填充饱满，并采用耐候密封胶密封。",[358,360,362,364],{"key":20,"text":359,"correct":22},"水泥",{"key":24,"text":361,"correct":22},"岩棉",{"key":27,"text":363,"correct":29},"弹性闭孔材料",{"key":31,"text":365,"correct":22},"保温砂浆",{"id":367,"libraryId":5,"type":84,"typeLabel":85,"stem":368,"options":369,"answer":380,"analysis":33},1144792,"建筑外墙保温防火隔离带施工符合技术规程要求的有（ ）。",[370,372,374,376,378],{"key":20,"text":371,"correct":29},"施工前应编制施工技术方案",{"key":24,"text":373,"correct":22},"采用保温材料的燃烧性能不低于B1级",{"key":27,"text":375,"correct":29},"隔离带宽度不小于300mm",{"key":31,"text":377,"correct":22},"防火棉的密度不大于100kg\u002Fm3",{"key":97,"text":379,"correct":29},"隔离带外观无裂缝、粉化、空鼓、剥落现象","ACE",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":24,"analysis":33},1144793,"轻质隔墙应进行复验的项目是（ ）。",[385,387,389,391],{"key":20,"text":386,"correct":22},"木材的含水率",{"key":24,"text":388,"correct":29},"人造木板的甲醛含量",{"key":27,"text":390,"correct":22},"玻璃的强度",{"key":31,"text":392,"correct":22},"胶粘剂的有害物质含量",{"id":394,"libraryId":5,"type":84,"typeLabel":85,"stem":395,"options":396,"answer":305,"analysis":33},1144794,"施工总平面图设计要点中，关于布置临时房屋的表述，正确的是()。",[397,399,401,403,405],{"key":20,"text":398,"correct":29},"尽可能利用已建的永久性房屋为施工服务",{"key":24,"text":400,"correct":22},"办公用房不宜设在工地入口处",{"key":27,"text":402,"correct":29},"作业人员宿舍一般宜设在现场附近，方便工人上下班",{"key":31,"text":404,"correct":29},"食堂宜布置在生活区，也可视条件设在施工区与生活区之间",{"key":97,"text":406,"correct":29},"现场条件不允许时，可以采用送餐制",{"id":408,"libraryId":5,"type":84,"typeLabel":85,"stem":409,"options":410,"answer":421,"analysis":33},1144796,"施工总平面图设计原则包括()。",[411,413,415,417,419],{"key":20,"text":412,"correct":29},"平面布置科学合理，施工场地占用面积少",{"key":24,"text":414,"correct":29},"合理组织运输，减少二次搬运",{"key":27,"text":416,"correct":22},"遵守当地主管部门和监理单位关于施工现场安全文明施工的相关规定",{"key":31,"text":418,"correct":29},"临时设施应方便生产和生活",{"key":97,"text":420,"correct":29},"应符合节能、环保、安全和消防等要求","ABDE",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":27,"analysis":33},1144797,"属于施工总平面图的设计原则的是()。",[426,428,430,432],{"key":20,"text":427,"correct":22},"计量能源标准",{"key":24,"text":429,"correct":22},"工程材料数量合格",{"key":27,"text":431,"correct":29},"符合节能、环保、安全和消防等要求",{"key":31,"text":433,"correct":22},"工程合同内容合格",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":31,"analysis":33},1144798,"属于施工总平面图的设计要点的是()。",[438,440,442,444],{"key":20,"text":439,"correct":22},"设置项目人员办公室",{"key":24,"text":441,"correct":22},"设置工程占地围墙",{"key":27,"text":443,"correct":22},"设置工程质量检测室",{"key":31,"text":445,"correct":29},"设置大门，引入场外道路",{"id":447,"libraryId":5,"type":84,"typeLabel":85,"stem":448,"options":449,"answer":460,"analysis":33},1144799,"施工总平面图的设计内容包括()。",[450,452,454,456,458],{"key":20,"text":451,"correct":29},"建筑物、构筑物位置、平面轮廓",{"key":24,"text":453,"correct":29},"供水、给水、排水等管线和设施",{"key":27,"text":455,"correct":29},"钢筋、木材加工场地",{"key":31,"text":457,"correct":22},"幕墙玻璃质量检测室",{"key":97,"text":459,"correct":22},"装饰装修半成品组装场地","ABC",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":27,"analysis":33},1144800,"单位工程施工平面图设计步骤的顺序正确的是()。",[465,467,469,471],{"key":20,"text":466,"correct":22},"确定仓库、堆场、加工场地的位置→确定起重机的位置→布置运输道路→布置水电管线→布置临时房屋→计算技术经济指标",{"key":24,"text":468,"correct":22},"确定仓库、堆场、加工场地的位置→确定起重机的位置→布置运输道路→布置临时房屋→布置水电管线→计算技术经济指标",{"key":27,"text":470,"correct":29},"确定起重机的位置→确定仓库、堆场、加工场地的位置→布置运输道路→布置临时房屋→布置水电管线→计算技术经济指标",{"key":31,"text":472,"correct":22},"确定起重机的位置→确定仓库、堆场、加工场地的位置→布置运输道路→布置水电管线→布置临时房屋→计算技术经济指标",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":31,"analysis":33},1144801,"市区主要路段的施工现场围挡高度不应低于()m。",[477,479,481,483],{"key":20,"text":478,"correct":22},"1.5",{"key":24,"text":480,"correct":22},"1.8",{"key":27,"text":482,"correct":22},"2.2",{"key":31,"text":484,"correct":29},"2.5",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":31,"analysis":33},1144802,"施工总平面图的设计首先考虑的是()。",[489,490,491,492],{"key":20,"text":439,"correct":22},{"key":24,"text":441,"correct":22},{"key":27,"text":443,"correct":22},{"key":31,"text":445,"correct":29},{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":31,"analysis":33},1144803,"配电箱的固定方式()。",[497,499,501,503],{"key":20,"text":498,"correct":22},"配电箱应装设端正，固定，不得移动",{"key":24,"text":500,"correct":22},"固定式配电箱的底部与地面的垂直距离应为1.4～1.6m",{"key":27,"text":502,"correct":22},"配电箱的中心点与地面的垂直距离宜为2m",{"key":31,"text":504,"correct":29},"移动式配电箱应装设在坚固、稳定的支架上",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":31,"analysis":33},1144804,"金属箱门与金属箱体做接地连接须采用()的方式。",[509,511,513,515],{"key":20,"text":510,"correct":22},"绝缘导线",{"key":24,"text":512,"correct":22},"五芯电缆线",{"key":27,"text":514,"correct":22},"保护零线",{"key":31,"text":516,"correct":29},"编织软铜线",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":24,"analysis":33},1144805,"有关配电箱布置与开关箱的设置，下列说法错误的是()。",[521,523,525,527],{"key":20,"text":522,"correct":22},"配电系统应采用配电柜或总配电箱.分配电箱.开关箱三级配电方式",{"key":24,"text":524,"correct":29},"可以用同一个开关箱直接控制3台及以上用电设备",{"key":27,"text":526,"correct":22},"固定式配电箱.开关箱的中心点与地面的垂直距离应为1.4～1.6m",{"key":31,"text":528,"correct":22},"分配电箱与开关箱的距离不得超过30m",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":31,"analysis":33},1144806,"下列做法中，符合室内配线保护要求的是()。",[533,535,537,539],{"key":20,"text":534,"correct":22},"室内配线采用短路保护",{"key":24,"text":536,"correct":22},"室内配线采用过载保护",{"key":27,"text":538,"correct":22},"室内配线采用钢管保护",{"key":31,"text":540,"correct":29},"室内配线必须有短路保护和过载保护",{"id":542,"libraryId":5,"type":84,"typeLabel":85,"stem":543,"options":544,"answer":460,"analysis":33},1144807,"以下各项线路布置时，须要短路保护和过载保护的是()。",[545,547,549,551,553],{"key":20,"text":546,"correct":29},"架空线路敷设",{"key":24,"text":548,"correct":29},"电缆线路敷设",{"key":27,"text":550,"correct":29},"室内配线敷设",{"key":31,"text":552,"correct":22},"室外线路敷设",{"key":97,"text":554,"correct":22},"照明线路敷设",{"id":556,"libraryId":5,"type":84,"typeLabel":85,"stem":557,"options":558,"answer":228,"analysis":33},1144808,"关于架空线路敷设基本要求的说法，正确的有()。",[559,561,563,565,567],{"key":20,"text":560,"correct":29},"施工现场架空线必须采用绝缘导线",{"key":24,"text":562,"correct":22},"导线长期连续负荷电流应大于导线计算负荷电流",{"key":27,"text":564,"correct":29},"架空线路必须有短路保护",{"key":31,"text":566,"correct":29},"架空线路必须有过载保护",{"key":97,"text":568,"correct":22},"三相四线制线路的N线和PE线截面不小于相线截面的30%，单相线路的零线截而与相线截面相同",{"id":570,"libraryId":5,"type":84,"typeLabel":85,"stem":571,"options":572,"answer":99,"analysis":33},1144809,"架空线路敷设的基本要求有()。",[573,575,576,578,579],{"key":20,"text":574,"correct":22},"架空线路必须有防水装置",{"key":24,"text":566,"correct":29},{"key":27,"text":577,"correct":22},"架空线路必须有接地保护",{"key":31,"text":564,"correct":29},{"key":97,"text":580,"correct":29},"施工现场架空线路必须采用绝缘导线",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":27,"analysis":33},1144810,"根据《施工现场临时用电安全技术规范》(JGJ46)，隧道、人防工程、高温、有导电灰尘、比较潮湿或灯具离地面高度低于2.5m等场所的照明，电源电压不应大于()V。",[585,587,589,591],{"key":20,"text":586,"correct":22},"24",{"key":24,"text":588,"correct":22},"12",{"key":27,"text":590,"correct":29},"36",{"key":31,"text":592,"correct":22},"48",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":20,"analysis":33},1144811,"采用熔断器做短路保护时，其熔体额定电流应小于等于明敷绝缘导线长期连续负荷允许载流量的()。",[597,599,601,603],{"key":20,"text":598,"correct":29},"1.5倍",{"key":24,"text":600,"correct":22},"2.0倍",{"key":27,"text":602,"correct":22},"2.5倍",{"key":31,"text":604,"correct":22},"3.0倍",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":24,"analysis":33},1144812,"架空线路敷设的基本要求()。",[609,611,612,614],{"key":20,"text":610,"correct":22},"施工现场架空线必须采用绝缘铜线",{"key":24,"text":560,"correct":29},{"key":27,"text":613,"correct":22},"施工现场架空线必须采用绝缘铝线",{"key":31,"text":615,"correct":22},"施工现场架空线必须采用绝缘铜绞线",{"id":617,"libraryId":5,"type":15,"typeLabel":16,"stem":618,"options":619,"answer":20,"analysis":33},1144813,"特别潮湿场所、导电良好的地面、锅炉或金属容器内的照明，电源电压不得大于()。",[620,622,624,626],{"key":20,"text":621,"correct":29},"12V",{"key":24,"text":623,"correct":22},"16V",{"key":27,"text":625,"correct":22},"20V",{"key":31,"text":627,"correct":22},"24V",{"id":629,"libraryId":5,"type":84,"typeLabel":85,"stem":630,"options":631,"answer":642,"analysis":33},1144814,"施工现场在电缆线路通过时应用套钢管进行保护的部位()。",[632,634,636,638,640],{"key":20,"text":633,"correct":29},"电缆过墙部位",{"key":24,"text":635,"correct":29},"电缆过道部位",{"key":27,"text":637,"correct":22},"通过消防箱时",{"key":31,"text":639,"correct":22},"通过现场配电箱时",{"key":97,"text":641,"correct":29},"电缆过临建设施时","ABE",{"id":644,"libraryId":5,"type":15,"typeLabel":16,"stem":645,"options":646,"answer":27,"analysis":33},1144815,"分配电箱与开关箱的距离，下列各项中符合相关规定的是（）。",[647,649,651,653],{"key":20,"text":648,"correct":22},"分配电箱与开关箱距离不得超过35m",{"key":24,"text":650,"correct":22},"分配电箱与开关箱距离不得超过40m",{"key":27,"text":652,"correct":29},"分配电箱应设在用电设备或负荷相对集中的区域",{"key":31,"text":654,"correct":22},"开关箱与其控制的固定式用电设备的水平距离不宜超过4m",[656,659,662,665,668,671],{"id":15,"name":657,"category":7,"favorite":658},"领导干部任职前廉政法规知识测试题",92,{"id":660,"name":661,"category":7,"favorite":15},595,"建筑结构与设备",{"id":663,"name":664,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":666,"name":667,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":669,"name":670,"category":7,"favorite":8},534,"BIM工程师",{"id":672,"name":670,"category":7,"favorite":8},535]