[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-800-27":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":664},{"id":5,"name":6,"category":7,"favorite":8},800,"一建建筑工程实务","建筑工程",0,27,50,2362,[13,38,53,67,79,91,103,115,127,139,151,163,175,187,199,208,220,234,249,264,276,288,302,314,326,338,353,367,379,390,403,415,427,439,454,469,478,492,507,519,534,549,561,575,587,599,611,623,635,650],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1144715,2,"多选题","关于装饰抹灰工程的做法，正确的有（ ）。",[19,23,26,29,32],{"key":20,"text":21,"correct":22},"A","水泥的凝结时间和安定性复验应合格",true,{"key":24,"text":25,"correct":22},"B","抹灰总厚度大于或等于35mm时，应采取加强措施",{"key":27,"text":28,"correct":22},"C","当采用加强网时，加强网与各基体的搭接宽度不应小于100mm",{"key":30,"text":31,"correct":22},"D","滴水线应内高外低",{"key":33,"text":34,"correct":35},"E","滴水槽的宽度不应小于8mm，深度不应小于10mm",false,"ABCD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1144716,"抹灰工程应对水泥的（ ）进行复验。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"凝结时间",{"key":24,"text":45,"correct":35},"强度",{"key":27,"text":47,"correct":35},"强度等级",{"key":30,"text":49,"correct":22},"安定性",{"key":33,"text":51,"correct":35},"碱含量","AD",{"id":54,"libraryId":5,"type":55,"typeLabel":56,"stem":57,"options":58,"answer":20,"analysis":37},1144717,1,"单选题","关于抹灰工程材料的技术要求，以下表述错误的是（ ）。",[59,61,63,65],{"key":20,"text":60,"correct":22},"砂子宜选用特细砂",{"key":24,"text":62,"correct":35},"磨细石灰粉的熟化期不应少于3d",{"key":27,"text":64,"correct":35},"抹灰用的石灰膏的熟化期不应少于15d",{"key":30,"text":66,"correct":35},"抹灰用的水泥其强度等级应不小于32.5MPa",{"id":68,"libraryId":5,"type":55,"typeLabel":56,"stem":69,"options":70,"answer":20,"analysis":37},1144718,"关于中层抹灰砂浆稠度及主要作用的说法，正确的是（ ）。",[71,73,75,77],{"key":20,"text":72,"correct":22},"抹灰稠度7～8cm，主要作用是找平",{"key":24,"text":74,"correct":35},"抹灰稠度10cm，主要作用是初步找平",{"key":27,"text":76,"correct":35},"抹灰稠度10cm，主要作用是找平",{"key":30,"text":78,"correct":35},"抹灰稠度10～12cm，主要作用是初步找平",{"id":80,"libraryId":5,"type":55,"typeLabel":56,"stem":81,"options":82,"answer":27,"analysis":37},1144719,"关于抹灰工程基层处理的说法，正确的是（ ）。",[83,85,87,89],{"key":20,"text":84,"correct":35},"抹灰后砖砌体应清除表面杂物、尘土，应浇水湿润",{"key":24,"text":86,"correct":35},"混凝土表面应凿毛或在表面洒水润湿后涂刷1:3水泥砂浆（加适量胶粘剂）",{"key":27,"text":88,"correct":22},"加气混凝土应在湿润后，边刷界面剂边抹强度不小于M5的水泥混合砂浆",{"key":30,"text":90,"correct":35},"表面凹凸明显的部位应事先剔平或用1:5水泥砂浆补平",{"id":92,"libraryId":5,"type":55,"typeLabel":56,"stem":93,"options":94,"answer":30,"analysis":37},1144720,"关于抹灰工程墙面充筋的说法，正确的是（ ）。",[95,97,99,101],{"key":20,"text":96,"correct":35},"两筋间距不大于1.0m",{"key":24,"text":98,"correct":35},"当墙面高度小于3.5m时宜做横筋",{"key":27,"text":100,"correct":35},"当墙面高度大于3.5m时宜做立筋",{"key":30,"text":102,"correct":22},"墙面高度小于3.5m时宜做立筋。大于3.5m时宜做横筋",{"id":104,"libraryId":5,"type":55,"typeLabel":56,"stem":105,"options":106,"answer":20,"analysis":37},1144721,"室内抹灰工程施工的环境条件应满足施工工艺的要求，其施工环境温度不应低于（ ）℃。",[107,109,111,113],{"key":20,"text":108,"correct":22},"5",{"key":24,"text":110,"correct":35},"10",{"key":27,"text":112,"correct":35},"30",{"key":30,"text":114,"correct":35},"45",{"id":116,"libraryId":5,"type":55,"typeLabel":56,"stem":117,"options":118,"answer":20,"analysis":37},1144722,"关于分层抹灰的说法，正确的是（ ）。",[119,121,123,125],{"key":20,"text":120,"correct":22},"水泥砂浆不得抹在石灰砂浆层上",{"key":24,"text":122,"correct":35},"罩面石膏灰可抹在水泥砂浆层上",{"key":27,"text":124,"correct":35},"底层的抹灰层强度不得高于面层的抹灰层强度",{"key":30,"text":126,"correct":35},"水泥砂浆拌好后，应在终凝前用完",{"id":128,"libraryId":5,"type":55,"typeLabel":56,"stem":129,"options":130,"answer":30,"analysis":37},1144723,"一般抹灰工程的水泥砂浆不得抹在（ ）上。",[131,133,135,137],{"key":20,"text":132,"correct":35},"钢丝网",{"key":24,"text":134,"correct":35},"泰柏板",{"key":27,"text":136,"correct":35},"空心砖墙",{"key":30,"text":138,"correct":22},"石灰砂浆层",{"id":140,"libraryId":5,"type":55,"typeLabel":56,"stem":141,"options":142,"answer":20,"analysis":37},1144724,"关于抹灰工程施工工艺的说法，正确的是（ ）。",[143,145,147,149],{"key":20,"text":144,"correct":22},"采用加强网时，加强网与各基体的搭接宽度不应小于100mm",{"key":24,"text":146,"correct":35},"灰饼宜用1:5水泥砂浆抹成50mm见方形状",{"key":27,"text":148,"correct":35},"滴水线应内低外高，滴水槽的宽度和深度均不应小于10mm",{"key":30,"text":150,"correct":35},"水泥砂浆抹灰层应在湿润条件下养护，一般应在抹灰48h后进行养护",{"id":152,"libraryId":5,"type":55,"typeLabel":56,"stem":153,"options":154,"answer":24,"analysis":37},1144725,"关于抹灰工程施工环境要求的说法，正确的是（ ）。",[155,157,159,161],{"key":20,"text":156,"correct":35},"门窗框连接缝隙用1:5水泥砂浆分层嵌塞密实",{"key":24,"text":158,"correct":22},"室内抹灰的环境温度，一般不低于5℃",{"key":27,"text":160,"correct":35},"抹灰用脚手架，架子离墙500～600mm",{"key":30,"text":162,"correct":35},"混凝土结构表面、砖墙表面应在抹灰前3d浇水湿透（每天一遍）",{"id":164,"libraryId":5,"type":55,"typeLabel":56,"stem":165,"options":166,"answer":27,"analysis":37},1144726,"关于抹灰工程施工流程的说法，正确的是（ ）。",[167,169,171,173],{"key":20,"text":168,"correct":35},"基层处理→浇水湿润→墙面充筋→抹灰饼→分层抹灰→设置分格缝→保护成品",{"key":24,"text":170,"correct":35},"基层处理→浇水湿润→抹灰饼→设置分格缝→分层抹灰→墙面充筋→保护成品",{"key":27,"text":172,"correct":22},"基层处理→浇水湿润→抹灰饼→墙面充筋→分层抹灰→设置分格缝→保护成品",{"key":30,"text":174,"correct":35},"基层处理→浇水湿润→抹灰饼→墙面充筋→设置分格缝→分层抹灰→保护成品",{"id":176,"libraryId":5,"type":55,"typeLabel":56,"stem":177,"options":178,"answer":20,"analysis":37},1144727,"关于室内墙面、柱面和门洞口的阳角做法，当设计无要求时，正确的是（ ）。",[179,181,183,185],{"key":20,"text":180,"correct":22},"应采用1:2水泥砂浆做暗护角，其高度不应低于2m",{"key":24,"text":182,"correct":35},"应采用1:3水泥砂浆做暗护角，其高度不应低于1m",{"key":27,"text":184,"correct":35},"应采用1:2混合砂浆做暗护角，其高度不应低于1m",{"key":30,"text":186,"correct":35},"应采用1:3混合砂浆做暗护角，其高度不应低于2m",{"id":188,"libraryId":5,"type":55,"typeLabel":56,"stem":189,"options":190,"answer":27,"analysis":37},1144728,"关于抹灰层平均总厚度的说法，正确的是（ ）。",[191,193,195,197],{"key":20,"text":192,"correct":35},"内墙普通抹灰层平均总厚度最大值25mm",{"key":24,"text":194,"correct":35},"内墙高级抹灰层平均总厚度最大值20mm",{"key":27,"text":196,"correct":22},"石墙抹灰层平均总厚度最大值35mm",{"key":30,"text":198,"correct":35},"外墙抹灰层平均总厚度最大值25mm",{"id":200,"libraryId":5,"type":55,"typeLabel":56,"stem":201,"options":202,"answer":27,"analysis":37},1144729,"当设计无要求时，关于抹灰层平均总厚度的说法，正确的是（ ）。",[203,204,205,206],{"key":20,"text":192,"correct":35},{"key":24,"text":194,"correct":35},{"key":27,"text":196,"correct":22},{"key":30,"text":207,"correct":35},"外墙抹灰层平均总厚度最大值30mm",{"id":209,"libraryId":5,"type":55,"typeLabel":56,"stem":210,"options":211,"answer":27,"analysis":37},1144730,"关于轻质隔墙轻钢龙骨罩面板施工工艺的说法，正确的是（ ）。",[212,214,216,218],{"key":20,"text":213,"correct":35},"安装竖龙骨时由隔断墙的两端开始排列",{"key":24,"text":215,"correct":35},"3～5m高度的隔断墙通贯横撑龙骨安装1道",{"key":27,"text":217,"correct":22},"安装横撑龙骨时，隔墙骨架高度超过3m时，应设横向龙骨",{"key":30,"text":219,"correct":35},"曲面墙体罩面时，罩面板宜纵向铺设",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":36,"analysis":37},1144731,"关于轻钢龙骨罩面板施工工艺的说法，正确的有（ ）。",[224,226,228,230,232],{"key":20,"text":225,"correct":22},"在地面上弹出水平线并将线引向侧墙和顶面",{"key":24,"text":227,"correct":22},"天地龙骨与建筑顶、地连接及竖龙骨与墙、柱连接可采用射钉或膨胀螺栓固定",{"key":27,"text":229,"correct":22},"龙骨与建筑基体表面接触处，在龙骨接触面两边各粘贴一根通长的橡胶密封条",{"key":30,"text":231,"correct":22},"竖龙骨安装由隔断墙的一端开始排列，有门窗要从门窗洞口开始分别向两侧排列",{"key":33,"text":233,"correct":35},"通贯横撑龙骨低于3m的隔断墙安装2道；3～5m高度的隔断墙安装3～5道",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":248,"analysis":37},1144732,"关于玻璃隔墙安装做法，符合要求的是（ ）。",[238,240,242,244,246],{"key":20,"text":239,"correct":35},"玻璃隔墙工程应使用具有隔声、隔热的中空玻璃",{"key":24,"text":241,"correct":22},"玻璃砖墙宜以1.5m高为一个施工段",{"key":27,"text":243,"correct":35},"玻璃砖砌筑中埋设的拉结筋必须与骨架连接牢固",{"key":30,"text":245,"correct":22},"玻璃砖隔墙面积过大时应增加支撑",{"key":33,"text":247,"correct":22},"平板玻璃隔墙安装玻璃前应检查骨架、边框的牢固程度","BDE",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":263,"analysis":37},1144733,"玻璃板隔墙应使用（ ）。",[253,255,257,259,261],{"key":20,"text":254,"correct":22},"夹层玻璃",{"key":24,"text":256,"correct":35},"镀膜玻璃",{"key":27,"text":258,"correct":22},"钢化玻璃",{"key":30,"text":260,"correct":35},"中空玻璃",{"key":33,"text":262,"correct":35},"磨砂玻璃","AC",{"id":265,"libraryId":5,"type":55,"typeLabel":56,"stem":266,"options":267,"answer":30,"analysis":37},1144734,"关于轻质隔墙轻钢龙骨罩面板安装施工流程的说法，正确的是（ ）。",[268,270,272,274],{"key":20,"text":269,"correct":35},"弹线→天地龙骨→通贯龙骨→竖龙骨→机电管线→横撑龙骨→门洞口→罩面板（一侧）→填充材料（岩棉）→罩面板（另一侧）",{"key":24,"text":271,"correct":35},"弹线→竖龙骨→天地龙骨→通贯龙骨→机电管线→横撑龙骨→门洞口→罩面板（一侧）→填充材料（岩棉）→罩面板（另一侧）",{"key":27,"text":273,"correct":35},"弹线→通贯龙骨→天地龙骨→竖龙骨→横撑龙骨→门洞口→机电管线→罩面板（一侧）→填充材料（岩棉）→罩面板（另一侧）",{"key":30,"text":275,"correct":22},"弹线→天地龙骨→竖龙骨→通贯龙骨→机电管线→横撑龙骨→门洞口→罩面板（一侧）→填充材料（岩棉）→罩面板（另一侧）",{"id":277,"libraryId":5,"type":55,"typeLabel":56,"stem":278,"options":279,"answer":27,"analysis":37},1144735,"关于轻质隔墙轻钢龙骨罩面板自攻螺钉施工工艺的说法，正确的是（ ）。",[280,282,284,286],{"key":20,"text":281,"correct":35},"间距为沿板周边应不大于300mm",{"key":24,"text":283,"correct":35},"双层石膏板内层板钉距板边500mm，板中800mm",{"key":27,"text":285,"correct":22},"自攻螺钉与石膏板边缘的距离应为10～15mm",{"key":30,"text":287,"correct":35},"自攻螺钉进入轻钢龙骨内的长度，以不小于6mm为宜",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":36,"analysis":37},1144736,"关于板材隔墙施工工艺的说法，正确的有（ ）。",[292,294,296,298,300],{"key":20,"text":293,"correct":22},"在结构地面、墙面及顶面根据图纸，用墨斗弹好隔墙定位边线及门窗洞口线",{"key":24,"text":295,"correct":22},"刚性连接按结构净高尺寸减20mm；柔性连接比刚性连接高15mm",{"key":27,"text":297,"correct":22},"隔墙板厚度选用，最小厚度单层板不小于90mm",{"key":30,"text":299,"correct":22},"胶粘剂要随配随用，并应在30min内用完",{"key":33,"text":301,"correct":35},"安装顺序应从门洞口处向两端依次进行，门洞两侧宜用整块板；无门洞的墙体，应从中间向两边安装",{"id":303,"libraryId":5,"type":55,"typeLabel":56,"stem":304,"options":305,"answer":30,"analysis":37},1144737,"关于板材隔墙施工工艺流程的说法，正确的是（ ）。",[306,308,310,312],{"key":20,"text":307,"correct":35},"放线→配板、修补→安装U形卡件或L形卡件→支设临时方木→配置胶粘剂→安装隔墙板→安装门窗框→设备、电气管线安装→板缝处理",{"key":24,"text":309,"correct":35},"放线→支设临时方木→配置胶粘剂→配板、修补→安装U形卡件或L形卡件→安装隔墙板→安装门窗框→设备、电气管线安装→板缝处理",{"key":27,"text":311,"correct":35},"放线→配置胶粘剂一配板、修补→支设临时方木→安装U形卡件或L形卡件→安装隔墙板→安装门窗框→设备、电气管线安装→板缝处理",{"key":30,"text":313,"correct":22},"放线→配板、修补→支设临时方木→配置胶粘剂→安装U形卡件或L形卡件→安装隔墙板→安装门窗框→设备、电气管线安装→板缝处理",{"id":315,"libraryId":5,"type":55,"typeLabel":56,"stem":316,"options":317,"answer":27,"analysis":37},1144738,"板材隔墙施工中，支设临时方木紧后工作是（ ）。",[318,320,322,324],{"key":20,"text":319,"correct":35},"放线",{"key":24,"text":321,"correct":35},"安装隔墙板",{"key":27,"text":323,"correct":22},"配置胶粘剂",{"key":30,"text":325,"correct":35},"安装门窗框",{"id":327,"libraryId":5,"type":55,"typeLabel":56,"stem":328,"options":329,"answer":30,"analysis":37},1144739,"关于板材隔墙施工工艺的说法，正确的是（ ）。",[330,332,334,336],{"key":20,"text":331,"correct":35},"隔墙板厚度选用应按设计要求并考虑便于门窗安装，最小厚度不小于50mm",{"key":24,"text":333,"correct":35},"胶粘剂要随配随用，并应在60min内用完",{"key":27,"text":335,"correct":35},"隔墙板安装顺序应从门洞口处向两端依次进行；无门洞的墙体，应从中间向两边顺序安装",{"key":30,"text":337,"correct":22},"板缝用50～60mm宽的玻纤布条，阴阳转角用200mm宽布条处理",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":352,"analysis":37},1144740,"关于饰面板（砖）工程材料技术要求的说法，正确的有（ ）。",[342,344,346,348,350],{"key":20,"text":343,"correct":22},"材料进场时应对品种、规格、外观和尺寸进行验收",{"key":24,"text":345,"correct":35},"饰面板（砖）工程所有材料必须复验合格方可使用",{"key":27,"text":347,"correct":22},"金属材料、砂（石）、外加剂、胶粘剂等施工材料按规定进行性能试验",{"key":30,"text":349,"correct":22},"天然石材安装前，应对石材饰面采用防碱背涂剂进行背涂处理",{"key":33,"text":351,"correct":22},"采用湿作业法施工的天然石材饰面板应进行防碱、背涂处理","ACDE",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":36,"analysis":37},1144741,"对饰面板（砖）工程的质量验收，应对（ ）等材料及其性能指标进行复验。",[357,359,361,363,365],{"key":20,"text":358,"correct":22},"室内用花岗石的放射性",{"key":24,"text":360,"correct":22},"粘贴用水泥的安定性、凝结时间",{"key":27,"text":362,"correct":22},"外墙陶瓷面砖的吸水率",{"key":30,"text":364,"correct":22},"寒冷地区外墙陶瓷面砖的抗冻性",{"key":33,"text":366,"correct":35},"饰面板（砖）的粘结强度",{"id":368,"libraryId":5,"type":55,"typeLabel":56,"stem":369,"options":370,"answer":30,"analysis":37},1144742,"在Ⅳ、Ⅴ区，外墙陶瓷砖的（ ）不用进行复验。",[371,373,375,377],{"key":20,"text":372,"correct":35},"尺寸",{"key":24,"text":374,"correct":35},"表面质量",{"key":27,"text":376,"correct":35},"吸水率",{"key":30,"text":378,"correct":22},"抗冻性",{"id":380,"libraryId":5,"type":55,"typeLabel":56,"stem":381,"options":382,"answer":24,"analysis":37},1144743,"饰面板（砖）工程中不须进行复验的项目是（ ）。",[383,384,386,388],{"key":20,"text":362,"correct":35},{"key":24,"text":385,"correct":22},"室内用大理石的放射性",{"key":27,"text":387,"correct":35},"粘贴用水泥的凝结时间、安定性和抗压强度",{"key":30,"text":389,"correct":35},"寒冷地区外墙陶瓷的抗冻性",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":402,"analysis":37},1144744,"饰面板（砖）工程应对（ ）进行复验。",[394,395,396,398,400],{"key":20,"text":358,"correct":22},{"key":24,"text":362,"correct":22},{"key":27,"text":397,"correct":22},"寒冷地区外墙陶瓷砖的抗冻性",{"key":30,"text":399,"correct":35},"防碱封闭底漆",{"key":33,"text":401,"correct":22},"粘贴用水泥的凝结时间，安定性和强度","ABCE",{"id":404,"libraryId":5,"type":55,"typeLabel":56,"stem":405,"options":406,"answer":20,"analysis":37},1144745,"饰面砖粘贴工程一般适用于内墙饰面砖粘贴工程和高度不大于100m、抗震设防烈度不大于8度、采用（ ）施工的外墙饰面砖粘贴工程。",[407,409,411,413],{"key":20,"text":408,"correct":22},"满粘法",{"key":24,"text":410,"correct":35},"点粘法",{"key":27,"text":412,"correct":35},"条粘法",{"key":30,"text":414,"correct":35},"空铺法",{"id":416,"libraryId":5,"type":55,"typeLabel":56,"stem":417,"options":418,"answer":30,"analysis":37},1144746,"关于暗龙骨吊顶施工流程的说法，正确的是（ ）。",[419,421,423,425],{"key":20,"text":420,"correct":35},"放线→安装水电管线→划龙骨分档线→安装主龙骨→安装副龙骨→安装罩面板→安装压条",{"key":24,"text":422,"correct":35},"放线→划龙骨分档线→安装水电管线→安装副龙骨→安装主龙骨→安装罩面板→安装压条",{"key":27,"text":424,"correct":35},"放线→安装水电管线→划龙骨分档线→安装副龙骨→安装主龙骨→安装罩面板→安装压条",{"key":30,"text":426,"correct":22},"放线→弹龙骨分档线→安装水电管线→安装主龙骨→安装副龙骨→安装罩面板→安装压条",{"id":428,"libraryId":5,"type":55,"typeLabel":56,"stem":429,"options":430,"answer":20,"analysis":37},1144747,"关于暗龙骨吊顶施工工艺的说法，正确的是（ ）。",[431,433,435,437],{"key":20,"text":432,"correct":22},"在梁上或风管等机电设备上设置吊挂杆件，需进行跨越施工",{"key":24,"text":434,"correct":35},"吊杆距主龙骨端部距离不得超过400mm，否则应增加吊杆",{"key":27,"text":436,"correct":35},"跨度大于15m以上的吊顶，应在主龙骨上，每隔20m加一道大龙骨",{"key":30,"text":438,"correct":35},"纸面石膏板的长边（即包封边）应沿纵向主龙骨铺设",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":453,"analysis":37},1144748,"符合轻质隔墙安装要求的做法的是（ ）。",[443,445,447,449,451],{"key":20,"text":444,"correct":35},"龙骨与基体的固定点间距应不大于1.2m",{"key":24,"text":446,"correct":22},"潮湿房间和钢板网抹灰墙，龙骨间距不宜大于400mm",{"key":27,"text":448,"correct":22},"安装贯通系列龙骨时，低于3m的隔墙安装一道，3～5m隔墙安装两道",{"key":30,"text":450,"correct":22},"饰面板横向接缝处不在沿地、沿顶龙骨上时，应加横撑龙骨固定",{"key":33,"text":452,"correct":22},"门窗或特殊接点处安装附加龙骨应符合设计","BCDE",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":468,"analysis":37},1144749,"关于吊顶工程次龙骨安装做法，符合要求的是（ ）。",[458,460,462,464,466],{"key":20,"text":459,"correct":22},"应紧贴主龙骨安装",{"key":24,"text":461,"correct":35},"固定板材的次龙骨间距不得大于650mm",{"key":27,"text":463,"correct":22},"在潮湿地区和场所，间距宜为300～400mm",{"key":30,"text":465,"correct":22},"用沉头自攻螺钉安装面板时，接缝处次龙骨宽度不得小于40mm",{"key":33,"text":467,"correct":35},"连接件不应错位安装","ACD",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":468,"analysis":37},1144750,"关于暗龙骨吊顶次龙骨施工工艺的说法，正确的有（ ）。",[473,474,475,476,477],{"key":20,"text":459,"correct":22},{"key":24,"text":461,"correct":35},{"key":27,"text":463,"correct":22},{"key":30,"text":465,"correct":22},{"key":33,"text":467,"correct":35},{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":453,"analysis":37},1144751,"关于纸面石膏板的安装做法，符合要求的是（ ）。",[482,484,486,488,490],{"key":20,"text":483,"correct":35},"石膏板应横向铺设，长边接缝应安装在沿顶龙骨上",{"key":24,"text":485,"correct":22},"龙骨两侧的石膏板及龙骨一侧的双层板的接缝应错开，不得在同一根龙骨接缝上",{"key":27,"text":487,"correct":22},"沿石膏板周边钉距不得大于200mm，板中钉间距不得大于300mm，螺钉与板边距离应为10～15mm",{"key":30,"text":489,"correct":22},"安装石膏板时应从板的中部向板的四边固定",{"key":33,"text":491,"correct":22},"设计无要求时，石膏板与周围或柱应有3mm的槽口，以便进行防裂处理",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":506,"analysis":37},1144752,"关于暗龙骨吊顶工程纸面石膏板安装要求的说法，正确的有（ ）。",[496,498,500,502,504],{"key":20,"text":497,"correct":35},"板材固定时，应从板的四周向板的中间固定",{"key":24,"text":499,"correct":22},"纸包边石膏板螺钉距板边距离宜为10～15mm",{"key":27,"text":501,"correct":22},"切割边石膏板宜为15～20mm",{"key":30,"text":503,"correct":22},"板周边钉距宜为150～170mm，板中钉距不得大于200mm",{"key":33,"text":505,"correct":35},"安装双层石膏板时，上下层板的接缝不应错开，在同一根龙骨上接缝","BCD",{"id":508,"libraryId":5,"type":55,"typeLabel":56,"stem":509,"options":510,"answer":20,"analysis":37},1144753,"可安装在吊顶龙骨上的是（ ）。",[511,513,515,517],{"key":20,"text":512,"correct":22},"烟感器",{"key":24,"text":514,"correct":35},"大型吊灯",{"key":27,"text":516,"correct":35},"电扇",{"key":30,"text":518,"correct":35},"投影仪",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":533,"analysis":37},1144754,"关于明龙骨吊顶龙骨安装的说法，正确的有（ ）。",[523,525,527,529,531],{"key":20,"text":524,"correct":22},"边龙骨沿混凝土墙（柱）上可用射钉固定，射钉间距应不大于吊顶次龙骨的间距",{"key":24,"text":526,"correct":22},"主龙骨间距不大于1000mm",{"key":27,"text":528,"correct":35},"主龙骨的悬臂段不应大于500mm",{"key":30,"text":530,"correct":22},"跨度大于15m以上的吊顶，应在主龙骨上，每隔15m加一道大龙骨",{"key":33,"text":532,"correct":22},"次龙骨应紧贴主龙骨安装，间距300～600mm","ABDE",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":548,"analysis":37},1144755,"关于明龙骨吊顶固定吊挂杆件施工工艺的说法，正确的有（ ）。",[538,540,542,544,546],{"key":20,"text":539,"correct":22},"采用膨胀螺栓固定吊挂杆件",{"key":24,"text":541,"correct":35},"不上人的吊顶，吊杆长度小于1000mm，可以采用有图4.5钢筋吊杆",{"key":27,"text":543,"correct":35},"上人的吊顶，吊杆长度小于等于1000mm，可以采用有图6钢筋吊杆",{"key":30,"text":545,"correct":22},"吊杆长度大于1500mm，同样要设置反向支撑",{"key":33,"text":547,"correct":22},"梁上吊杆距主龙骨端部距离不得超过300mm，否则应增加吊杆","ADE",{"id":550,"libraryId":5,"type":55,"typeLabel":56,"stem":551,"options":552,"answer":20,"analysis":37},1144756,"关于地面装修构造的说法，属于地面整体面层的是（ ）。",[553,555,557,559],{"key":20,"text":554,"correct":22},"水泥混凝土面层",{"key":24,"text":556,"correct":35},"砖面层",{"key":27,"text":558,"correct":35},"料石面层",{"key":30,"text":560,"correct":35},"实木地板面层",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":402,"analysis":37},1144757,"关于塑料面层地面施工工艺的说法，正确的有（ ）。",[565,567,569,571,573],{"key":20,"text":566,"correct":22},"房间依照塑料板尺寸，排出塑料板放置位置，并在地面弹出十字控制线和分格线",{"key":24,"text":568,"correct":22},"面板按弹线位置沿轴线由中央向四面铺贴",{"key":27,"text":570,"correct":22},"涂刷基层时，应超出分格线10mm，涂刷厚度应小1mm",{"key":30,"text":572,"correct":35},"板块缝隙需要焊接时，宜在7h以后施焊",{"key":33,"text":574,"correct":22},"冬期施工时，环境温度不应低于10℃",{"id":576,"libraryId":5,"type":55,"typeLabel":56,"stem":577,"options":578,"answer":30,"analysis":37},1144758,"关于地毯面层地面施工工艺的说法，正确的是（ ）。",[579,581,583,585],{"key":20,"text":580,"correct":35},"地毯剪裁长度应比房间长度大30mm",{"key":24,"text":582,"correct":35},"倒刺板条应距踢脚20mm",{"key":27,"text":584,"correct":35},"衬垫离开倒刺板20mm左右",{"key":30,"text":586,"correct":22},"铺设地毯应先将地毯的一条长边固定在倒刺板上拉伸",{"id":588,"libraryId":5,"type":55,"typeLabel":56,"stem":589,"options":590,"answer":20,"analysis":37},1144759,"关于地毯面层地毯拉伸的说法，正确的是（ ）。",[591,593,595,597],{"key":20,"text":592,"correct":22},"一个方向拉伸完，再进行另一个方向的拉伸",{"key":24,"text":594,"correct":35},"两个方向同时进行",{"key":27,"text":596,"correct":35},"三个方向同时进行",{"key":30,"text":598,"correct":35},"四个方向同时进行",{"id":600,"libraryId":5,"type":55,"typeLabel":56,"stem":601,"options":602,"answer":20,"analysis":37},1144760,"关于涂饰工程基层要求的说法，涂水性涂料时，正确的是（ ）。",[603,605,607,609],{"key":20,"text":604,"correct":22},"混凝土及抹灰面层的含水率应在10%以下，基层的pH值不得大于10",{"key":24,"text":606,"correct":35},"混凝土及抹灰面层的含水率应在10%以下，基层的pH值不得大于15",{"key":27,"text":608,"correct":35},"混凝土及抹灰面层的含水率应在12%以下，基层的pH值不得大于10",{"key":30,"text":610,"correct":35},"混凝土及抹灰面层的含水率应在12%以下，基层的pH值不得大于15",{"id":612,"libraryId":5,"type":55,"typeLabel":56,"stem":613,"options":614,"answer":24,"analysis":37},1144761,"在新抹砂浆、现浇混凝土面层涂饰建筑涂料，常温要求的时间分别是（ ）d以上。",[615,617,619,621],{"key":20,"text":616,"correct":35},"7、14",{"key":24,"text":618,"correct":22},"14、21",{"key":27,"text":620,"correct":35},"14、14",{"key":30,"text":622,"correct":35},"21、28",{"id":624,"libraryId":5,"type":55,"typeLabel":56,"stem":625,"options":626,"answer":30,"analysis":37},1144762,"关于涂饰工程基层处理，做法错误的是（ ）。",[627,629,631,633],{"key":20,"text":628,"correct":35},"新建筑物的混凝土或抹灰基层在涂饰前应涂刷抗碱封闭底漆",{"key":24,"text":630,"correct":35},"旧墙面在涂饰前应清除疏松的旧装修层，并刷界面剂",{"key":27,"text":632,"correct":35},"厨房、卫生间墙面采用耐水腻子",{"key":30,"text":634,"correct":22},"混凝土基层含水率在8%～10%时涂刷溶剂型涂料",{"id":636,"libraryId":5,"type":15,"typeLabel":16,"stem":637,"options":638,"answer":649,"analysis":37},1144763,"涂饰工程施工中，关于施工环境的说法，错误的是（ ）。",[639,641,643,645,647],{"key":20,"text":640,"correct":22},"水性涂料涂饰工程施工的环境温度应在10～36℃之间，并注意通风换气和防尘",{"key":24,"text":642,"correct":35},"涂饰工程应在抹灰、吊顶、细部、地面湿作业及电气工程等已完成并验收合格后进行",{"key":27,"text":644,"correct":22},"基层应干燥，混凝土及抹灰面层的含水率应在15%以下，基层的pH值不得大于10",{"key":30,"text":646,"correct":35},"门窗、灯具、电器插座及地面等应进行遮挡，以免施工时被涂料污染",{"key":33,"text":648,"correct":22},"冬期施工室内温度不宜低于13℃，相对湿度为85%，并在采暖条件下进行，室温保持均衡，不得突然变化","ACE",{"id":651,"libraryId":5,"type":15,"typeLabel":16,"stem":652,"options":653,"answer":453,"analysis":37},1144764,"下列做法符合涂饰工程基层处理要求的有（ ）。",[654,656,658,660,662],{"key":20,"text":655,"correct":35},"新建筑物的混凝土或抹灰基层在涂饰涂料后应涂刷抗碱封闭底漆",{"key":24,"text":657,"correct":22},"旧墙面在涂饰涂料前应清除疏松的旧装修层，并涂刷界面剂",{"key":27,"text":659,"correct":22},"混凝土或抹灰基层涂刷溶剂型涂料时，含水率不得大于8%",{"key":30,"text":661,"correct":22},"混凝土或抹灰基层涂刷乳液型涂料时，含水率不得大于10%",{"key":33,"text":663,"correct":22},"木材基层的含水率不得大于12%",[665,668,671,674,677,680],{"id":55,"name":666,"category":7,"favorite":667},"领导干部任职前廉政法规知识测试题",92,{"id":669,"name":670,"category":7,"favorite":55},595,"建筑结构与设备",{"id":672,"name":673,"category":7,"favorite":55},715,"招标采购专业知识与法律法规",{"id":675,"name":676,"category":7,"favorite":55},848,"市政方向-通用基础",{"id":678,"name":679,"category":7,"favorite":8},534,"BIM工程师",{"id":681,"name":679,"category":7,"favorite":8},535]