[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-800-26":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":646},{"id":5,"name":6,"category":7,"favorite":8},800,"一建建筑工程实务","建筑工程",0,26,50,2362,[13,34,52,64,76,91,106,121,133,145,157,169,181,193,207,219,231,246,255,270,284,299,308,320,332,344,358,370,378,390,405,417,429,444,453,465,479,487,495,507,521,533,545,557,566,580,592,604,618,632],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1144661,1,"单选题","关于地下工程防水混凝土配合比的说法，正确的是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","水泥用量必须大于300kg\u002Fm3",false,{"key":24,"text":25,"correct":22},"B","水胶比不得大于0.45",{"key":27,"text":28,"correct":29},"C","泵送时入泵坍落度宜为120～160mm",true,{"key":31,"text":32,"correct":22},"D","预拌混凝土的初凝时间为4.5～10h","",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":51,"analysis":33},1144662,2,"多选题","关于地下防水混凝土施工技术要求，正确的有（ ）。",[40,42,44,46,48],{"key":20,"text":41,"correct":29},"防水混凝土拌合物应采用机械搅拌，搅拌时间不小于2min",{"key":24,"text":43,"correct":29},"防水混凝土拌合物在运输后如出现离析，必须进行二次搅拌",{"key":27,"text":45,"correct":29},"防水混凝土应连续浇筑，宜少留施工缝",{"key":31,"text":47,"correct":29},"防水混凝土终凝后应立即进行养护",{"key":49,"text":50,"correct":22},"E","防水混凝土结构内部的各种钢筋和绑扎钢丝，可接触模板","ABCD",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":24,"analysis":33},1144663,"防水混凝土拌合物应采用机械搅拌，搅拌时间不宜小于（ ）min。",[56,58,60,62],{"key":20,"text":57,"correct":22},"1",{"key":24,"text":59,"correct":29},"2",{"key":27,"text":61,"correct":22},"3",{"key":31,"text":63,"correct":22},"4",{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":31,"analysis":33},1144664,"地下工程防水混凝土墙体的第一道水平施工缝应留部位是（ ）。",[68,70,72,74],{"key":20,"text":69,"correct":22},"顶板与侧墙的交接处",{"key":24,"text":71,"correct":22},"底板与侧墙的交接处",{"key":27,"text":73,"correct":22},"低于顶板底面不小于300mm的墙体上",{"key":31,"text":75,"correct":29},"高出底板表面不小于300mm的墙体上",{"id":77,"libraryId":5,"type":36,"typeLabel":37,"stem":78,"options":79,"answer":90,"analysis":33},1144665,"下列关于防水混凝土施工缝留置技术要求的说法中，正确的有（ ）。",[80,82,84,86,88],{"key":20,"text":81,"correct":22},"墙体水平施工缝不应留在剪力最大处，应留在高出底板表面不小于500mm的墙体上",{"key":24,"text":83,"correct":29},"拱（板）墙结合的水平施工缝，宜留在拱（板）墙接缝线以下150～300mm处",{"key":27,"text":85,"correct":29},"墙体有预留孔洞时，施工缝距孔洞边缘不应小于300mm",{"key":31,"text":87,"correct":29},"垂直施工缝应避开地下水和裂隙水较多的地段，并宜与变形缝相结合",{"key":49,"text":89,"correct":22},"墙体水平施工缝不应留在剪力底板与侧墙的交接处，应留在高出底板表面不小于500mm的墙体上","BCD",{"id":92,"libraryId":5,"type":36,"typeLabel":37,"stem":93,"options":94,"answer":105,"analysis":33},1144666,"关于地下工程防水混凝土施工缝留置说法，正确的有（ ）。",[95,97,99,101,103],{"key":20,"text":96,"correct":22},"墙体水平施工工缝应留在底板与侧墙的交接处",{"key":24,"text":98,"correct":22},"墙体有预留孔洞时，施工缝距孔洞边缘不宜大于300mm",{"key":27,"text":100,"correct":29},"顶板、底板不宜留施工缝",{"key":31,"text":102,"correct":29},"垂直施工缝宜与变形缝相结合",{"key":49,"text":104,"correct":22},"板墙结合的水平施工缝可留在板墙接缝处","CD",{"id":107,"libraryId":5,"type":36,"typeLabel":37,"stem":108,"options":109,"answer":120,"analysis":33},1144667,"关于防水混凝土施工技术的说法，正确的有（ ）。",[110,112,114,116,118],{"key":20,"text":111,"correct":29},"防水混凝土胶凝材料总量不宜小于320kg\u002Fm3，其中水泥用量不宜小于260kg\u002Fm3",{"key":24,"text":113,"correct":29},"砂率宜为35%～40%，泵送时可增至45%",{"key":27,"text":115,"correct":29},"防水混凝土采用预拌混凝土时，人泵坍落度宜控制在120～160mm，坍落度每小时损失不应大于20mm，坍落度总损失值不应大于40mm",{"key":31,"text":117,"correct":22},"墙体有预留孔洞时，施工缝距孔洞边缘不应小于200mm",{"key":49,"text":119,"correct":29},"养护时间不得少于14d","ABCE",{"id":122,"libraryId":5,"type":15,"typeLabel":16,"stem":123,"options":124,"answer":20,"analysis":33},1144668,"卷材防水层的施工环境温度最低的是（ ）。",[125,127,129,131],{"key":20,"text":126,"correct":29},"热熔法",{"key":24,"text":128,"correct":22},"冷粘法",{"key":27,"text":130,"correct":22},"热粘法",{"key":31,"text":132,"correct":22},"自粘法",{"id":134,"libraryId":5,"type":15,"typeLabel":16,"stem":135,"options":136,"answer":27,"analysis":33},1144669,"关于卷材防水层施工的说法，错误的是（ ）。",[137,139,141,143],{"key":20,"text":138,"correct":22},"铺贴卷材严禁在雨天、雪天、五级及以上大风中施工",{"key":24,"text":140,"correct":22},"卷材防水层宜用于受侵蚀介质作用或受振动作用的地下工程",{"key":27,"text":142,"correct":29},"采用冷粘法铺贴时，施工环境温度不应低于0℃",{"key":31,"text":144,"correct":22},"采用热熔法铺粘时，施工环境温度不应低于-10℃",{"id":146,"libraryId":5,"type":15,"typeLabel":16,"stem":147,"options":148,"answer":24,"analysis":33},1144670,"水泥砂浆防水层终凝后应及时进行养护，养护温度不宜低于（ ）。",[149,151,153,155],{"key":20,"text":150,"correct":22},"0℃",{"key":24,"text":152,"correct":29},"5℃",{"key":27,"text":154,"correct":22},"10℃",{"key":31,"text":156,"correct":22},"15℃",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":24,"analysis":33},1144671,"地下工程水泥砂浆防水层的养护时间至少应为（ ）。",[161,163,165,167],{"key":20,"text":162,"correct":22},"7d",{"key":24,"text":164,"correct":29},"14d",{"key":27,"text":166,"correct":22},"21d",{"key":31,"text":168,"correct":22},"28d",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":24,"analysis":33},1144672,"聚合物水泥砂浆硬化后应采用的养护方法是（ ）。",[173,175,177,179],{"key":20,"text":174,"correct":22},"浇水养护",{"key":24,"text":176,"correct":29},"干湿交替",{"key":27,"text":178,"correct":22},"干燥养护",{"key":31,"text":180,"correct":22},"覆盖养护",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":27,"analysis":33},1144673,"水泥砂浆防水层可用于地下工程防水的最高温度是（ ）。",[185,187,189,191],{"key":20,"text":186,"correct":22},"25℃",{"key":24,"text":188,"correct":22},"50℃",{"key":27,"text":190,"correct":29},"80℃",{"key":31,"text":192,"correct":22},"100℃",{"id":194,"libraryId":5,"type":36,"typeLabel":37,"stem":195,"options":196,"answer":90,"analysis":33},1144674,"地下工程水泥砂浆防水层常见的种类有（ ）。",[197,199,201,203,205],{"key":20,"text":198,"correct":22},"加膜砂浆防水层",{"key":24,"text":200,"correct":29},"普通水泥砂浆防水层",{"key":27,"text":202,"correct":29},"聚合物水泥砂浆防水层",{"key":31,"text":204,"correct":29},"掺外加剂水泥砂浆防水层",{"key":49,"text":206,"correct":22},"刚性水泥砂浆防水层",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":24,"analysis":33},1144675,"可以进行防水工程防水层施工的环境是（ ）。",[211,213,215,217],{"key":20,"text":212,"correct":22},"雨天",{"key":24,"text":214,"correct":29},"夜间",{"key":27,"text":216,"correct":22},"雪天",{"key":31,"text":218,"correct":22},"六级大风",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":24,"analysis":33},1144676,"普通水泥砂浆防水层终凝后，应及时进行养护，养护温度不宜低于5℃，养护时间不得少于（ ）d，养护期间应保持湿润。",[223,225,227,229],{"key":20,"text":224,"correct":22},"7",{"key":24,"text":226,"correct":29},"14",{"key":27,"text":228,"correct":22},"21",{"key":31,"text":230,"correct":22},"28",{"id":232,"libraryId":5,"type":36,"typeLabel":37,"stem":233,"options":234,"answer":245,"analysis":33},1144677,"关于自粘法铺贴防水卷材的说法，正确的是（ ）。",[235,237,239,241,243],{"key":20,"text":236,"correct":29},"基层表面涂刷的处理剂干燥后及时铺贴卷材",{"key":24,"text":238,"correct":22},"铺贴时不用排空卷材下面的空气，滚压粘贴牢固即可",{"key":27,"text":240,"correct":29},"低温施工时，搭接部位应加热后再粘贴",{"key":31,"text":242,"correct":29},"搭接缝口应采用材性相容的密封材料封严",{"key":49,"text":244,"correct":22},"搭接缝部位宜以沥出沥青为度","ACD",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":27,"analysis":33},1144678,"防水混凝土养护时间不得少于（ ）。",[250,251,253,254],{"key":20,"text":162,"correct":22},{"key":24,"text":252,"correct":22},"10d",{"key":27,"text":164,"correct":29},{"key":31,"text":166,"correct":22},{"id":256,"libraryId":5,"type":36,"typeLabel":37,"stem":257,"options":258,"answer":269,"analysis":33},1144679,"地下水泥砂浆防水层施工前，基层表面应（ ）。",[259,261,263,265,267],{"key":20,"text":260,"correct":29},"坚实",{"key":24,"text":262,"correct":29},"平整",{"key":27,"text":264,"correct":22},"光滑",{"key":31,"text":266,"correct":29},"洁净",{"key":49,"text":268,"correct":29},"充分湿润","ABDE",{"id":271,"libraryId":5,"type":36,"typeLabel":37,"stem":272,"options":273,"answer":283,"analysis":33},1144680,"关于卷材防水层施工要求的说法，正确的是（ ）。",[274,276,277,279,281],{"key":20,"text":275,"correct":29},"卷材防水层宜用于经常处于地下水环境",{"key":24,"text":138,"correct":29},{"key":27,"text":278,"correct":22},"冷粘法、自粘法施工的环境气温不宜低于10℃",{"key":31,"text":280,"correct":22},"热熔法、焊接法施工的环境气温不宜低于-15℃",{"key":49,"text":282,"correct":29},"卷材防水层应铺设在混凝土结构的迎水面上","ABE",{"id":285,"libraryId":5,"type":36,"typeLabel":37,"stem":286,"options":287,"answer":298,"analysis":33},1144681,"地下工程防水卷材的铺贴方式可分为“外防外贴法”和“外防内贴法”，外贴法与内贴法相比较，其主要特点有（ ）。",[288,290,292,294,296],{"key":20,"text":289,"correct":29},"容易检查混凝土质量",{"key":24,"text":291,"correct":22},"浇筑混凝土时，容易碰撞保护墙和防水层",{"key":27,"text":293,"correct":29},"不能利用保护墙作模板",{"key":31,"text":295,"correct":29},"工期较长",{"key":49,"text":297,"correct":29},"土方开挖量大，且易产生塌方现象","ACDE",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":31,"analysis":33},1144682,"地下工程铺贴改性沥青卷材应采用的施工方法是（ ）。",[303,304,305,307],{"key":20,"text":128,"correct":22},{"key":24,"text":132,"correct":22},{"key":27,"text":306,"correct":22},"热风焊接法",{"key":31,"text":126,"correct":29},{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":20,"analysis":33},1144683,"采用外防外贴法铺贴卷材防水层时，从底面折向立面的卷材与永久性保护墙的接触部位，应采用（ ）施工。",[312,314,316,318],{"key":20,"text":313,"correct":29},"空铺法",{"key":24,"text":315,"correct":22},"点粘法",{"key":27,"text":317,"correct":22},"机械固定法",{"key":31,"text":319,"correct":22},"条粘法",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":20,"analysis":33},1144684,"采用外防内贴法铺贴卷材防水层时正确的有（ ）",[324,326,328,330],{"key":20,"text":325,"correct":29},"混凝土结构的保护墙内表面抹厚度为20mm的1:3水泥砂浆找平层",{"key":24,"text":327,"correct":22},"混凝土结构的保护墙内表面采用1:3水泥砂浆进行找平处理，厚度30mm",{"key":27,"text":329,"correct":22},"混凝土结构的保护墙内表面采用1:4水泥砂浆进行找平处理，厚度30mm",{"key":31,"text":331,"correct":22},"混凝土结构的保护墙内表面采用1：5水泥砂浆进行找平处理，厚度30mm",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":27,"analysis":33},1144685,"顶板的卷材防水层验收合格后，应及时做保护层，在细石混凝土保护层和防水层之间宜设置（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":22},"软质保护材料",{"key":24,"text":339,"correct":22},"找平层",{"key":27,"text":341,"correct":29},"隔离层",{"key":31,"text":343,"correct":22},"隔气层",{"id":345,"libraryId":5,"type":36,"typeLabel":37,"stem":346,"options":347,"answer":298,"analysis":33},1144686,"下列屋面防水等级和设防要求说法正确的有（ ）。",[348,350,352,354,356],{"key":20,"text":349,"correct":29},"屋面防水工程应根据建筑物的类别、重要程度、使用功能要求确定防水等级",{"key":24,"text":351,"correct":22},"屋面防水等级分为I、Ⅱ、Ⅲ、Ⅳ级",{"key":27,"text":353,"correct":29},"重要建筑设防要求为两道防水设防",{"key":31,"text":355,"correct":29},"一般建筑应设置一道防水",{"key":49,"text":357,"correct":29},"高层建筑设防要求为两道防水设防",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":24,"analysis":33},1144687,"屋面防水设防要求为一道防水设防的建筑，其防水等级为（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":22},"I级",{"key":24,"text":365,"correct":29},"Ⅱ级",{"key":27,"text":367,"correct":22},"Ⅲ级",{"key":31,"text":369,"correct":22},"Ⅳ级",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":27,"analysis":33},1144688,"普通住宅的屋面防水等级通常分为（ ）级。",[374,375,376,377],{"key":20,"text":63,"correct":22},{"key":24,"text":61,"correct":22},{"key":27,"text":59,"correct":29},{"key":31,"text":57,"correct":22},{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":24,"analysis":33},1144689,"重要的建筑和高层建筑，屋面防水设防道数最小限值是（ ）。",[382,384,386,388],{"key":20,"text":383,"correct":22},"一道",{"key":24,"text":385,"correct":29},"二道",{"key":27,"text":387,"correct":22},"三道",{"key":31,"text":389,"correct":22},"四道",{"id":391,"libraryId":5,"type":36,"typeLabel":37,"stem":392,"options":393,"answer":404,"analysis":33},1144690,"某高层建筑，针对其屋面防水等级及设防要求的说法，正确的有（ ）。",[394,396,398,400,402],{"key":20,"text":395,"correct":29},"I级防水",{"key":24,"text":397,"correct":22},"Ⅱ级防水",{"key":27,"text":399,"correct":22},"Ⅲ级防水",{"key":31,"text":401,"correct":22},"一道防水设防",{"key":49,"text":403,"correct":29},"两道防水设防","AE",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":27,"analysis":33},1144691,"关于屋面卷材防水找平层的排水坡度要求的说法，正确的是（ ）。",[409,411,413,415],{"key":20,"text":410,"correct":22},"平屋面采用结构找坡不应小于2%",{"key":24,"text":412,"correct":22},"采用材料找坡宜为3%",{"key":27,"text":414,"correct":29},"天沟、檐沟纵向找坡不应小于1%",{"key":31,"text":416,"correct":22},"沟底水落差大于200mm",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":27,"analysis":33},1144692,"下列有关屋面防水的基本要求正确的是（ ）。",[421,423,425,427],{"key":20,"text":422,"correct":22},"采用结构找坡时，坡度不应小于2%",{"key":24,"text":424,"correct":22},"采用材料找坡时，坡度不应小于3%",{"key":27,"text":426,"correct":29},"保温层上的找平层应在水泥初凝前压实抹平",{"key":31,"text":428,"correct":22},"保温层养护时间不得少于14天",{"id":430,"libraryId":5,"type":36,"typeLabel":37,"stem":431,"options":432,"answer":443,"analysis":33},1144693,"关于屋面防水基本要求的说法，正确的有（ ）。",[433,435,437,439,441],{"key":20,"text":434,"correct":29},"屋面防水应以防为主，以排为辅",{"key":24,"text":436,"correct":22},"混凝土结构层宜采用结构找坡，坡度不应小于8%",{"key":27,"text":438,"correct":29},"严寒和寒冷地区屋面热桥部位，应按设计要求采取节能保温等隔断热桥措施",{"key":31,"text":440,"correct":22},"找平层设置的分格缝可兼作排汽道，排汽道的宽度宜为20mm",{"key":49,"text":442,"correct":29},"涂膜防水层的胎体增强材料宜采用无纺布或化纤无纺布","ACE",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":31,"analysis":33},1144694,"立面或大坡面铺贴防水卷材时，应采用的施工方法是（ ）。",[448,449,450,451],{"key":20,"text":313,"correct":22},{"key":24,"text":315,"correct":22},{"key":27,"text":319,"correct":22},{"key":31,"text":452,"correct":29},"满粘法",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":24,"analysis":33},1144696,"关于屋面防水卷材铺贴顺序和方向，说法正确的是（ ）。",[457,459,461,463],{"key":20,"text":458,"correct":22},"卷材宜平行屋脊铺贴，上下两层卷材应垂直铺贴",{"key":24,"text":460,"correct":29},"由屋面最低标高向上铺贴",{"key":27,"text":462,"correct":22},"檐沟、天沟卷材铺贴，应顺檐沟、天沟方向，搭接缝应逆水流方向",{"key":31,"text":464,"correct":22},"立面或大铺面铺贴卷材时，应采用点粘法，并宜减少卷材短边搭接",{"id":466,"libraryId":5,"type":36,"typeLabel":37,"stem":467,"options":468,"answer":298,"analysis":33},1144698,"关于卷材搭接缝的说法，以下说法正确的是（ ）。",[469,471,473,475,477],{"key":20,"text":470,"correct":29},"平行屋脊的搭接缝应顺流水方向",{"key":24,"text":472,"correct":22},"搭接缝宜留在天沟底部",{"key":27,"text":474,"correct":29},"上下层卷材长边搭接缝应错开，且不应小于幅宽的1\u002F3",{"key":31,"text":476,"correct":29},"叠层铺贴的各层卷材，在天沟与屋面的交接处，应采用叉接法搭接",{"key":49,"text":478,"correct":29},"同一层相邻两幅卷材短边搭接缝错开不应小于500mm",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":24,"analysis":33},1144699,"铺贴厚度小于3mm的地下工程高聚物改性沥青卷材时，严禁采用的施工方法是（ ）。",[483,484,485,486],{"key":20,"text":128,"correct":22},{"key":24,"text":126,"correct":29},{"key":27,"text":452,"correct":22},{"key":31,"text":313,"correct":22},{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":24,"analysis":33},1144700,"地下工程，铺贴厚度小于3mm的高聚物改性沥青卷材时，严禁采用的施工方法是（ ）。",[491,492,493,494],{"key":20,"text":128,"correct":22},{"key":24,"text":126,"correct":29},{"key":27,"text":452,"correct":22},{"key":31,"text":313,"correct":22},{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":27,"analysis":33},1144701,"热熔型防水涂料大面施工时，最适宜的施工方法是（ ）。",[499,501,503,505],{"key":20,"text":500,"correct":22},"喷涂施工",{"key":24,"text":502,"correct":22},"滚涂施工",{"key":27,"text":504,"correct":29},"刮涂施工",{"key":31,"text":506,"correct":22},"刷涂施工",{"id":508,"libraryId":5,"type":36,"typeLabel":37,"stem":509,"options":510,"answer":245,"analysis":33},1144702,"关于屋面卷材铺贴的做法，正确的有（ ）。",[511,513,515,517,519],{"key":20,"text":512,"correct":29},"距屋面周边800mm以内以及叠层铺贴的隔层卷材之间应满粘",{"key":24,"text":514,"correct":22},"屋面坡度小于3%，卷材宜垂直屋脊铺贴",{"key":27,"text":516,"correct":29},"卷材铺贴基层的转角处，找平层应做圆弧形",{"key":31,"text":518,"correct":29},"卷材找平层设分格缝时，分格缝宜设于板端缝位置，并填密封材料",{"key":49,"text":520,"correct":22},"卷材防水层上有重物覆盖或基层变形较大时，不应采取空铺法和点粘或条粘法施工",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":31,"analysis":33},1144703,"关于屋面防水水落口做法的说法，正确的是（ ）。",[525,527,529,531],{"key":20,"text":526,"correct":22},"防水层贴入水落口杯内不应小于30mm，周围直径500mm范围内的坡度不应小于3%",{"key":24,"text":528,"correct":22},"防水层贴入水落口杯内不应小于30mm，周围直径500mm范围内的坡度不应小于5%",{"key":27,"text":530,"correct":22},"防水层贴入水落口杯内不应小于50mm，周围直径500mm范围内的坡度不应小于3%",{"key":31,"text":532,"correct":29},"防水层贴入水落口杯内不应小于50mm，周围直径500mm范围内的坡度不应小于5%",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":27,"analysis":33},1144705,"自粘性高聚物改性沥青防水卷材，卷材搭接宽度至少应为（ ）。",[537,539,541,543],{"key":20,"text":538,"correct":22},"60mm",{"key":24,"text":540,"correct":22},"70mm",{"key":27,"text":542,"correct":29},"80mm",{"key":31,"text":544,"correct":22},"100mm",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":31,"analysis":33},1144706,"关于防水混凝土施工做法，表述错误的是（ ）。",[549,551,553,555],{"key":20,"text":550,"correct":22},"防水混凝土应采用高频机械分层振捣密实",{"key":24,"text":552,"correct":22},"施工缝宜留置在受剪力较小、便于施工的部位",{"key":27,"text":554,"correct":22},"防水混凝土冬期施工时，其入模温度不应低于5℃",{"key":31,"text":556,"correct":29},"防水混凝土终凝后应立即进行养护，养护时间不得少于7d",{"id":558,"libraryId":5,"type":36,"typeLabel":37,"stem":559,"options":560,"answer":51,"analysis":33},1144707,"关于地下防水层防水混凝土施工技术要求，正确的有（ ）。",[561,562,563,564,565],{"key":20,"text":41,"correct":29},{"key":24,"text":43,"correct":29},{"key":27,"text":45,"correct":29},{"key":31,"text":47,"correct":29},{"key":49,"text":50,"correct":22},{"id":567,"libraryId":5,"type":36,"typeLabel":37,"stem":568,"options":569,"answer":105,"analysis":33},1144708,"混凝土搅拌运输车到达工地后，混凝土因坍落度损失不能满足施工要求时，可以在现场添加（ ）进行二次搅拌，以改善混凝土施工性能。",[570,572,574,576,578],{"key":20,"text":571,"correct":22},"自来水",{"key":24,"text":573,"correct":22},"水泥砂浆",{"key":27,"text":575,"correct":29},"原水胶比的水泥浆",{"key":31,"text":577,"correct":29},"同品牌的减水剂",{"key":49,"text":579,"correct":22},"同品牌的缓凝剂",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":31,"analysis":33},1144709,"室内防水工程施工中，清理基层的紧后工作是（ ）。",[584,586,588,590],{"key":20,"text":585,"correct":22},"技术交底",{"key":24,"text":587,"correct":22},"细部附加层",{"key":27,"text":589,"correct":22},"防水层",{"key":31,"text":591,"correct":29},"结合层",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":27,"analysis":33},1144710,"室内防水施工过程包括：①细部附加层.②防水层.③结合层.④清理基层，正确的施工流程是（ ）。",[596,598,600,602],{"key":20,"text":597,"correct":22},"①②③④",{"key":24,"text":599,"correct":22},"④①②③",{"key":27,"text":601,"correct":29},"④③①②",{"key":31,"text":603,"correct":22},"④②①③",{"id":605,"libraryId":5,"type":36,"typeLabel":37,"stem":606,"options":607,"answer":269,"analysis":33},1144711,"关于涂饰工程施工环境要求的说法，正确的有()。",[608,610,612,614,616],{"key":20,"text":609,"correct":29},"水性涂料涂饰工程施工的环境温度应在5～35℃之间",{"key":24,"text":611,"correct":29},"在抹灰、吊顶、细部、地面湿作业及电气工程等已完成并验收合格后进行",{"key":27,"text":613,"correct":22},"新抹的砂浆常温要求5d以后，现浇混凝土常温要求14d以后，可涂饰建筑涂料",{"key":31,"text":615,"correct":29},"涂水性涂料时，混凝土及抹灰面层的含水率应在10%以下，基层的pH值不得大于10",{"key":49,"text":617,"correct":29},"冬期施工室内温度不宜低于5℃，相对湿度为85%以下",{"id":619,"libraryId":5,"type":36,"typeLabel":37,"stem":620,"options":621,"answer":245,"analysis":33},1144713,"下列有关抹灰工程施工说法中正确的是（ ）。",[622,624,626,628,630],{"key":20,"text":623,"correct":29},"抹灰用的石灰膏的熟化期不应少于15D",{"key":24,"text":625,"correct":22},"抹灰用的水泥强度等级应不小于20MPA",{"key":27,"text":627,"correct":29},"室内抹灰的环境温度，一般不低于5℃",{"key":31,"text":629,"correct":29},"当抹灰总厚度大于或等于35mm时，应采取加强措施",{"key":49,"text":631,"correct":22},"当采用加强网时，加强网与各基体的搭接宽度不应小于500mm",{"id":633,"libraryId":5,"type":36,"typeLabel":37,"stem":634,"options":635,"answer":298,"analysis":33},1144714,"关于抹灰工程施工工艺的说法，正确的有（ ）。",[636,638,640,642,644],{"key":20,"text":637,"correct":29},"抹灰用的石膏的熟化期不应少于15d",{"key":24,"text":639,"correct":22},"室内墙面、柱面和门洞口阳角做法，当无设计要求时，暗护角高度不应低于1.8m",{"key":27,"text":641,"correct":29},"抹灰总厚度大于或等于35mm时，应采取加强措施",{"key":31,"text":643,"correct":29},"当采用加强网时，加强网与各基体搭接宽度不应小于100mm",{"key":49,"text":645,"correct":29},"水泥砂浆不得抹在石灰砂浆层上；罩面石膏灰不得抹在水泥砂浆上",[647,650,653,656,659,662],{"id":15,"name":648,"category":7,"favorite":649},"领导干部任职前廉政法规知识测试题",92,{"id":651,"name":652,"category":7,"favorite":15},595,"建筑结构与设备",{"id":654,"name":655,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":657,"name":658,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":660,"name":661,"category":7,"favorite":8},534,"BIM工程师",{"id":663,"name":661,"category":7,"favorite":8},535]