[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-800-25":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":655},{"id":5,"name":6,"category":7,"favorite":8},800,"一建建筑工程实务","建筑工程",0,25,50,2362,[13,34,42,54,66,84,96,108,123,135,147,162,174,186,201,216,231,243,258,270,284,296,310,324,336,348,360,372,387,399,413,425,437,449,461,473,485,500,515,529,541,552,564,575,583,595,607,619,631,643],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1144610,1,"单选题","砖砌体墙体施工时，其分段位置宜设在（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","墙长的中间部位",false,{"key":24,"text":25,"correct":26},"B","墙体门窗洞口处",true,{"key":28,"text":29,"correct":22},"C","墙断面尺寸较大部位",{"key":31,"text":32,"correct":22},"D","墙断面尺寸较小部位","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1144611,"砖砌体墙体施工时，其分段位置宜设在( )。",[38,39,40,41],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":22},{"key":31,"text":32,"correct":22},{"id":43,"libraryId":5,"type":15,"typeLabel":16,"stem":44,"options":45,"answer":28,"analysis":33},1144612,"关于混凝土小型空心砌块砌体工程的说法，错误的是（ ）。",[46,48,50,52],{"key":20,"text":47,"correct":22},"分普通混凝土小型空心砌块和轻骨料混凝土小型空心砌块两种",{"key":24,"text":49,"correct":22},"必须与砖砌体施工一样设立皮数杆、拉水准线",{"key":28,"text":51,"correct":26},"先浇筑混凝土后绑扎构造柱钢筋",{"key":31,"text":53,"correct":22},"砌体水平灰缝和竖向灰缝的砂浆饱满度，不得出现瞎缝、透明缝",{"id":55,"libraryId":5,"type":15,"typeLabel":16,"stem":56,"options":57,"answer":20,"analysis":33},1144613,"关于砌筑砖柱、砖垛的说法，正确的是（ ）。",[58,60,62,64],{"key":20,"text":59,"correct":26},"砖柱应选用整砖砌筑，断面宜为方形或矩形",{"key":24,"text":61,"correct":22},"砖柱砌筑应保证砖柱外表面上下皮垂直灰缝相互错开1\u002F3砖长",{"key":28,"text":63,"correct":22},"砖垛应隔皮与砖墙搭砌，搭砌长度应不小于1\u002F3砖长",{"key":31,"text":65,"correct":22},"砖垛外表面上下皮垂直灰缝应相互错开1\u002F4砖长",{"id":67,"libraryId":5,"type":68,"typeLabel":69,"stem":70,"options":71,"answer":83,"analysis":33},1144614,2,"多选题","关于砖砌体工程说法，正确的有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"多孔砖的孔洞应垂直于受压面砌筑",{"key":24,"text":75,"correct":26},"砖垛应与所附砖墙同时砌筑，并隔皮与砖墙搭接",{"key":28,"text":77,"correct":22},"空心砖墙砌筑时，孔洞应沿墙呈垂直方向",{"key":31,"text":79,"correct":26},"空心砖墙的转角处，应用烧结普通砖砌筑",{"key":81,"text":82,"correct":22},"E","空心砖墙砌筑中途停歇时应留斜槎","ABD",{"id":85,"libraryId":5,"type":15,"typeLabel":16,"stem":86,"options":87,"answer":28,"analysis":33},1144615,"关于砌筑空心砖墙的说法，正确的是（ ）。",[88,90,92,94],{"key":20,"text":89,"correct":22},"空心砖墙底部宜砌2皮烧结普通砖",{"key":24,"text":91,"correct":22},"空心砖孔洞应沿墙呈水平方向，上下皮垂直灰缝相互错开2\u002F3砖长",{"key":28,"text":93,"correct":26},"拉结钢筋在空心砖墙中的长度不小于空心砖长加240mm",{"key":31,"text":95,"correct":22},"空心砖墙的转角处，应用烧结普通砖砌筑，砌筑长度角边不小于200mm",{"id":97,"libraryId":5,"type":15,"typeLabel":16,"stem":98,"options":99,"answer":28,"analysis":33},1144616,"蒸压加气混凝土砌块进场后应堆放整齐，堆置高度不宜超过（ ），并防止雨淋。",[100,102,104,106],{"key":20,"text":101,"correct":22},"1.5m",{"key":24,"text":103,"correct":22},"1.8m",{"key":28,"text":105,"correct":26},"2.Om",{"key":31,"text":107,"correct":22},"2.5m",{"id":109,"libraryId":5,"type":68,"typeLabel":69,"stem":110,"options":111,"answer":122,"analysis":33},1144617,"关于填充墙砌体工程的说法，正确的有（ ）。",[112,114,116,118,120],{"key":20,"text":113,"correct":22},"砌筑前加气混凝土砌块应提前2d浇水湿透",{"key":24,"text":115,"correct":22},"用轻骨料混凝土小型空心砌块砌筑墙体时，墙体底部可用烧结多孔砖砌筑",{"key":28,"text":117,"correct":26},"蒸压加气混凝土砌块墙体下部可现浇混凝土坎台，高度宜为150mm",{"key":31,"text":119,"correct":26},"蒸压加气混凝土砌块堆置高度不宜超过2m，并应防止雨淋",{"key":81,"text":121,"correct":22},"轻骨料混凝土小型空心砌块搭砌长度不应小于砌块长度的1\u002F3","CD",{"id":124,"libraryId":5,"type":15,"typeLabel":16,"stem":125,"options":126,"answer":31,"analysis":33},1144618,"关于砌筑加气混凝土砌块的说法，正确的是（ ）。",[127,129,131,133],{"key":20,"text":128,"correct":22},"上下皮砌块的竖向灰缝应相互错开，并不小于1OOmm",{"key":24,"text":130,"correct":22},"灰缝应横平竖直，砂浆饱满，水平灰缝砂浆饱满度不应小于90%，宽度宜为20mm",{"key":28,"text":132,"correct":22},"竖向灰缝砂浆饱满度不应小于80%，宽度宜为1Omm",{"key":31,"text":134,"correct":26},"加气混凝土墙上不得留设脚手眼",{"id":136,"libraryId":5,"type":15,"typeLabel":16,"stem":137,"options":138,"answer":20,"analysis":33},1144619,"关于钢结构构件生产工艺流程的说法，正确的是（ ）。",[139,141,143,145],{"key":20,"text":140,"correct":26},"放样、号料、切割下料、平直矫正、边缘及端部加工、滚圆、煨弯、制孔、组装、焊接、摩擦面的处理、涂装",{"key":24,"text":142,"correct":22},"放样、号料、切割下料、平直矫正、边缘及端部加工、滚圆、煨弯、组装、制孔、焊接、摩擦面的处理、涂装",{"key":28,"text":144,"correct":22},"放样、号料、切割下料、边缘及端部加工、平直矫正、滚圆、煨弯、制孔、组装、焊接、摩擦面的处理、涂装",{"key":31,"text":146,"correct":22},"放样、号料、切割下料、平直矫正、边缘及端部加工、制孔、滚圆、煨弯、组装、焊接、摩擦面的处理、涂装",{"id":148,"libraryId":5,"type":68,"typeLabel":69,"stem":149,"options":150,"answer":161,"analysis":33},1144620,"加气混凝土砌块墙如无切实有效措施，不得使用于（ ）。",[151,153,155,157,159],{"key":20,"text":152,"correct":22},"建筑物室内地面标高以上部位",{"key":24,"text":154,"correct":26},"长期浸水",{"key":28,"text":156,"correct":26},"受化学环境侵蚀的部位",{"key":31,"text":158,"correct":22},"抗震设防烈度8度地区的内隔墙",{"key":81,"text":160,"correct":26},"砌块表面经常处于80℃以上的高温环境","BCE",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":20,"analysis":33},1144621,"对于较厚的钢板，为了防止Z向层状撕裂，必须对焊接接头处焊缝进行（ ）。",[166,168,170,172],{"key":20,"text":167,"correct":26},"补强角焊",{"key":24,"text":169,"correct":22},"全焊透",{"key":28,"text":171,"correct":22},"十字形焊",{"key":31,"text":173,"correct":22},"T形焊",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":31,"analysis":33},1144622,"钢结构焊接中，可以引弧的构件是（ ）。",[178,180,182,184],{"key":20,"text":179,"correct":22},"主要构件",{"key":24,"text":181,"correct":22},"次要构件",{"key":28,"text":183,"correct":22},"连接板",{"key":31,"text":185,"correct":26},"引弧板",{"id":187,"libraryId":5,"type":68,"typeLabel":69,"stem":188,"options":189,"answer":200,"analysis":33},1144623,"钢结构焊接产生热裂纹的主要原因是（ ）。",[190,192,194,196,198],{"key":20,"text":191,"correct":26},"母材抗裂性差",{"key":24,"text":193,"correct":26},"焊接材料质量不好",{"key":28,"text":195,"correct":26},"焊接工艺参数选择不当",{"key":31,"text":197,"correct":22},"焊前未预热，焊后冷却快",{"key":81,"text":199,"correct":22},"焊接结构设计不合理，焊缝布置不当","ABC",{"id":202,"libraryId":5,"type":68,"typeLabel":69,"stem":203,"options":204,"answer":215,"analysis":33},1144624,"关于高强度螺栓连接施工的说法，正确的有（ ）。",[205,207,209,211,213],{"key":20,"text":206,"correct":26},"在施工前对连接副实物和摩擦面进行检验和复验",{"key":24,"text":208,"correct":22},"把高强度螺栓作为临时螺栓使用",{"key":28,"text":210,"correct":22},"高强度螺栓的安装可采用自由穿入和强行穿入两种",{"key":31,"text":212,"correct":26},"高强度螺栓连接中连接钢板的孔必须采用钻孔成型的方法",{"key":81,"text":214,"correct":26},"高强度螺栓不能作为临时螺栓使用","ADE",{"id":217,"libraryId":5,"type":68,"typeLabel":69,"stem":218,"options":219,"answer":230,"analysis":33},1144625,"钢结构中使用的连接螺栓一般分为普通螺栓和高强度螺栓两种，其中，高强度螺栓按连接形式通常分为（ ）。",[220,222,224,226,228],{"key":20,"text":221,"correct":22},"平接连接",{"key":24,"text":223,"correct":26},"摩擦连接",{"key":28,"text":225,"correct":26},"张拉连接",{"key":31,"text":227,"correct":26},"承压连接",{"key":81,"text":229,"correct":22},"搭接连接","BCD",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":28,"analysis":33},1144626,"高强度螺栓处理后的摩擦面，应检查其（ ）是否符合设计要求。",[235,237,239,241],{"key":20,"text":236,"correct":22},"抗拉强度",{"key":24,"text":238,"correct":22},"伸长率",{"key":28,"text":240,"correct":26},"抗滑移系数",{"key":31,"text":242,"correct":22},"抗腐蚀性能",{"id":244,"libraryId":5,"type":68,"typeLabel":69,"stem":245,"options":246,"answer":257,"analysis":33},1144627,"高强度螺栓施工中，摩擦面处理方法有（ ）。",[247,249,251,253,255],{"key":20,"text":248,"correct":26},"喷砂（丸）法",{"key":24,"text":250,"correct":22},"汽油擦拭法",{"key":28,"text":252,"correct":26},"化学酸洗法",{"key":31,"text":254,"correct":22},"化学碱洗法",{"key":81,"text":256,"correct":26},"砂轮打磨法","ACE",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":31,"analysis":33},1144628,"关于高强度螺栓安装的说法，正确的是（ ）。",[262,264,266,268],{"key":20,"text":263,"correct":22},"可用电焊切割高强度螺栓梅花头",{"key":24,"text":265,"correct":22},"扩孔后的孔径不应超过1.5d（d为螺栓直径）",{"key":28,"text":267,"correct":22},"安装环境气温不宜低于-15℃",{"key":31,"text":269,"correct":26},"露天使用的钢结构，连接处板缝及时用防水或耐腐蚀的腻子封闭",{"id":271,"libraryId":5,"type":68,"typeLabel":69,"stem":272,"options":273,"answer":83,"analysis":33},1144629,"关于钢结构螺栓连接施工质量的说法，正确的有（ ）。",[274,276,278,280,282],{"key":20,"text":275,"correct":26},"普通螺栓紧固应从中间开始，对称向两边进行",{"key":24,"text":277,"correct":26},"普通螺栓作为永久性连接螺栓的大型接头，宜采用复拧",{"key":28,"text":279,"correct":22},"高强度螺栓安装时可先用安装螺栓和冲钉，也可用高强度螺栓兼做安装螺栓",{"key":31,"text":281,"correct":26},"高强度螺栓的紧固顺序从节点中间向边缘施拧",{"key":81,"text":283,"correct":22},"高强度螺栓初拧和终拧应按相反的顺序进行，以使所有螺栓都均匀受力",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":31,"analysis":33},1144630,"防火涂料按其厚度可分为（ ）。",[288,290,292,294],{"key":20,"text":289,"correct":22},"A类、B类、H类",{"key":24,"text":291,"correct":22},"CB类、A类、B类",{"key":28,"text":293,"correct":22},"A类、B类、CH类",{"key":31,"text":295,"correct":26},"CB类、B类、H类",{"id":297,"libraryId":5,"type":68,"typeLabel":69,"stem":298,"options":299,"answer":257,"analysis":33},1144631,"关于钢结构高强度螺栓连接的说法，正确的有（ ）。",[300,302,304,306,308],{"key":20,"text":301,"correct":26},"高强度大六角头螺栓连接副施拧可采用扭矩法或转角法",{"key":24,"text":303,"correct":22},"高强度螺栓连接副初拧、复拧和终拧原则上应从不受约束的自由端向刚度大的部位进行",{"key":28,"text":305,"correct":26},"高强度螺栓连接副初拧、复拧和终拧原则上应从螺栓群中央向四周的顺序进行",{"key":31,"text":307,"correct":22},"高强度螺栓连接副初拧、复拧和终拧原则上应从螺栓群四周开始向中部集中逐个拧紧",{"key":81,"text":309,"correct":26},"同一接头中高强度螺栓的初拧、复拧、终拧应在24h内完成",{"id":311,"libraryId":5,"type":68,"typeLabel":69,"stem":312,"options":313,"answer":200,"analysis":33},1144632,"钢结构构件防腐涂料涂装施工的常用方法有（ ）。",[314,316,318,320,322],{"key":20,"text":315,"correct":26},"涂刷法",{"key":24,"text":317,"correct":26},"喷涂法",{"key":28,"text":319,"correct":26},"滚涂法",{"key":31,"text":321,"correct":22},"弹涂法",{"key":81,"text":323,"correct":22},"粘贴法",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":20,"analysis":33},1144633,"高强度螺栓连接钢结构时，其紧固次序应为（ ）。",[328,330,332,334],{"key":20,"text":329,"correct":26},"从中间开始，对称向两边进行",{"key":24,"text":331,"correct":22},"从两边开始，对称向中间进行",{"key":28,"text":333,"correct":22},"从一边开始，依次向另一边进行",{"key":31,"text":335,"correct":22},"根据施工方便情况而定",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":24,"analysis":33},1144634,"防腐涂料涂装时，底漆涂装的紧后工作是（ ）。",[340,342,344,346],{"key":20,"text":341,"correct":22},"基面处理",{"key":24,"text":343,"correct":26},"中间漆涂装",{"key":28,"text":345,"correct":22},"面漆涂装",{"key":31,"text":347,"correct":22},"检查验收",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":31,"analysis":33},1144635,"关于厚涂型钢结构防火涂料的说法，正确的是（ ）。",[352,354,356,358],{"key":20,"text":353,"correct":22},"涂层厚度一般为2～5mm",{"key":24,"text":355,"correct":22},"涂层厚度一般为2～7mm",{"key":28,"text":357,"correct":22},"涂层厚度一般为7～30mm",{"key":31,"text":359,"correct":26},"涂层厚度一般为7～45mm",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":20,"analysis":33},1144636,"关于多层及高层钢结构吊装的说法，正确的是（ ）。",[364,366,368,370],{"key":20,"text":365,"correct":26},"平面从中间或某一对称节间开始，垂直方向由下至上组成稳定结构，同节柱范围内的横向构件，通常由上向下逐层安装",{"key":24,"text":367,"correct":22},"平面从中间或某一对称节间开始，垂直方向由上至下组成稳定结构，同节柱范围内的横向构件，通常由上向下逐层安装",{"key":28,"text":369,"correct":22},"平面从两边节间开始，垂直方向由下至上组成稳定结构，同节柱范围内的横向构件，通常由下向上逐层安装",{"key":31,"text":371,"correct":22},"平面从两边节间开始，垂直方向由下至上组成稳定结构，同节柱范围内的横向构件，通常由上向下逐层安装",{"id":373,"libraryId":5,"type":68,"typeLabel":69,"stem":374,"options":375,"answer":386,"analysis":33},1144637,"关于网架安装方法及适用范围的说法，正确的有（ ）。",[376,378,380,382,384],{"key":20,"text":377,"correct":26},"高空散装法适用于螺栓连接、销轴链接等非焊接连接的结构",{"key":24,"text":379,"correct":26},"整体吊装法适用于中小类型的网架",{"key":28,"text":381,"correct":22},"整体提升法仅适用于支点较多的多点支承网架",{"key":31,"text":383,"correct":26},"滑移法适用于能设置平行滑轨的网架",{"key":81,"text":385,"correct":26},"分条或分块安装法适用于分割后刚度和受力状况改变较小的网架","ABDE",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":24,"analysis":33},1144638,"在多高层钢结构工程柱子安装时，每节柱的定位轴线应从（ ）。",[391,393,395,397],{"key":20,"text":392,"correct":22},"柱子控制轴",{"key":24,"text":394,"correct":26},"地面控制轴线",{"key":28,"text":396,"correct":22},"上层柱的轴线",{"key":31,"text":398,"correct":22},"下层柱的轴线",{"id":400,"libraryId":5,"type":68,"typeLabel":69,"stem":401,"options":402,"answer":83,"analysis":33},1144639,"关于高层钢结构安装的说法，正确的有（ ）。",[403,405,407,409,411],{"key":20,"text":404,"correct":26},"采取对称安装、对称固定的工艺",{"key":24,"text":406,"correct":26},"按吊装程序先划分吊装作业区域，按划分的区域、平等顺序同时进行",{"key":28,"text":408,"correct":22},"钢柱通常以2～4层为一节，吊装一般采用二点正吊",{"key":31,"text":410,"correct":26},"每节钢柱的定位轴线应从地面控制轴线直接引上",{"key":81,"text":412,"correct":22},"同一节柱、同一跨范围内的钢梁，宜从下向上安装",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":20,"analysis":33},1144640,"关于网架结构特点的说法，正确的是（ ）。",[417,419,421,423],{"key":20,"text":418,"correct":26},"空间受力",{"key":24,"text":420,"correct":22},"重量重",{"key":28,"text":422,"correct":22},"刚度小",{"key":31,"text":424,"correct":22},"抗震性能差",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":28,"analysis":33},1144641,"网架的安装时，适用于螺栓连接节点的各种类型网架，并宜采用少支架的悬挑施工方法是（ ）。",[429,431,433,435],{"key":20,"text":430,"correct":22},"分条或分块安装法",{"key":24,"text":432,"correct":22},"高空滑移法",{"key":28,"text":434,"correct":26},"高空散装法",{"key":31,"text":436,"correct":22},"整体吊装法",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":28,"analysis":33},1144642,"装配式混凝土建筑施工宜采用（ ）的工装系统。",[441,443,445,447],{"key":20,"text":442,"correct":22},"工厂化、标准化",{"key":24,"text":444,"correct":22},"工厂化、信息化",{"key":28,"text":446,"correct":26},"工具化、标准化",{"key":31,"text":448,"correct":22},"工具化、模块化",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":31,"analysis":33},1144643,"压型钢板与其他相关联的工序流程中，堵头板和封边板安装紧后工作是（ ）。",[453,455,457,459],{"key":20,"text":454,"correct":22},"压型钢板安装焊接",{"key":24,"text":456,"correct":22},"清扫、施工批交验",{"key":28,"text":458,"correct":22},"栓钉焊",{"key":31,"text":460,"correct":26},"压型板锁口",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":20,"analysis":33},1144644,"预制构件吊运过程中，下列吊索与构件水平夹角中，不符合规定的是（ ）。",[465,467,469,471],{"key":20,"text":466,"correct":26},"35℃",{"key":24,"text":468,"correct":22},"50℃",{"key":28,"text":470,"correct":22},"65℃",{"key":31,"text":472,"correct":22},"80℃",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":24,"analysis":33},1144645,"预制构件吊装、运输要求：吊索水平夹角不宜小于（ ），不应小于（ ）。",[477,479,481,483],{"key":20,"text":478,"correct":22},"70°45°",{"key":24,"text":480,"correct":26},"60°45°",{"key":28,"text":482,"correct":22},"70°50°",{"key":31,"text":484,"correct":22},"65°40°",{"id":486,"libraryId":5,"type":68,"typeLabel":69,"stem":487,"options":488,"answer":499,"analysis":33},1144646,"预制构件存放要求正确的有（ ）。",[489,491,493,495,497],{"key":20,"text":490,"correct":26},"多层叠放时，每层构件间的垫块应上下对齐",{"key":24,"text":492,"correct":22},"预制楼板、叠合板构件宜立放",{"key":28,"text":494,"correct":26},"阳台板、空调板构件宜平放",{"key":31,"text":496,"correct":26},"预制内外墙板宜立放",{"key":81,"text":498,"correct":22},"叠放层数不宜超过5层","ACD",{"id":501,"libraryId":5,"type":68,"typeLabel":69,"stem":502,"options":503,"answer":514,"analysis":33},1144647,"预制柱安装要求正确的有（ ）。",[504,506,508,510,512],{"key":20,"text":505,"correct":26},"按照角柱、边柱、中柱顺序进行安装",{"key":24,"text":507,"correct":22},"按照边柱、角柱、中柱顺序进行安装",{"key":28,"text":509,"correct":22},"按照中柱、边柱、角柱顺序进行安装",{"key":31,"text":511,"correct":22},"与现浇部分连接的柱应后安装",{"key":81,"text":513,"correct":26},"与现浇部分连接的柱宜先安装","AE",{"id":516,"libraryId":5,"type":68,"typeLabel":69,"stem":517,"options":518,"answer":215,"analysis":33},1144648,"关于型钢混凝土组合结构特点的说法，正确的有（ ）。",[519,521,523,525,527],{"key":20,"text":520,"correct":26},"设计时可不受含钢量限制",{"key":24,"text":522,"correct":22},"制作与施工难度大，成本增加较大",{"key":28,"text":524,"correct":22},"施工过程复杂，工期适当增长",{"key":31,"text":526,"correct":26},"具备更良好的抗震性能",{"key":81,"text":528,"correct":26},"比钢框架节省约50%钢材用量",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":20,"analysis":33},1144649,"下列关于型钢混凝土组合结构说法错误的是（ ）。",[533,535,537,539],{"key":20,"text":534,"correct":26},"型钢混凝土组合结构抗震性能较差",{"key":24,"text":536,"correct":22},"型钢混凝土组合结构承载能力较大",{"key":28,"text":538,"correct":22},"型钢混凝土组合结构较钢结构耐久性较好",{"key":31,"text":540,"correct":22},"型钢混凝土组合结构中型钢不受含钢率的限制",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":24,"analysis":33},1144650,"关于钢结构高强度螺栓安装的说法，错误的是（ ）。",[545,547,549,551],{"key":20,"text":546,"correct":22},"应从刚度大的部位向不受约束的自由端进行",{"key":24,"text":548,"correct":26},"应从不受约束的自由端向刚度大的部位进行",{"key":28,"text":550,"correct":22},"应从螺栓群中部开始向四周扩展逐个拧紧",{"key":31,"text":309,"correct":22},{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":24,"analysis":33},1144651,"冬期施工时，混凝土强度试件应增设与结构同条件养护的试件，组数不应少于（ ）组。",[556,558,560,562],{"key":20,"text":557,"correct":22},"1",{"key":24,"text":559,"correct":26},"2",{"key":28,"text":561,"correct":22},"3",{"key":31,"text":563,"correct":22},"4",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":20,"analysis":33},1144652,"钢结构建筑工程中，普通螺栓的紧固次序正确的是（ ）。",[568,570,572,573],{"key":20,"text":569,"correct":26},"从中间开始，对称向两边（或四周）进行",{"key":24,"text":571,"correct":22},"从两边（或四周）开始，对称向中间进行",{"key":28,"text":333,"correct":22},{"key":31,"text":574,"correct":22},"除偏心受力构件外，可根据现场方便施工原则定",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":20,"analysis":33},1144653,"钢结构工程中，普通螺栓连接钢结构时，其紧固次序应为（ ）。",[579,580,581,582],{"key":20,"text":569,"correct":26},{"key":24,"text":571,"correct":22},{"key":28,"text":333,"correct":22},{"key":31,"text":574,"correct":22},{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":24,"analysis":33},1144654,"关于钢结构采用螺栓连接的做法，错误的是（ ）。",[587,589,591,593],{"key":20,"text":588,"correct":22},"高强度螺栓的连接摩擦面不涂漆",{"key":24,"text":590,"correct":26},"高强度螺栓若不能自由穿入孔，采用气割扩孔",{"key":28,"text":592,"correct":22},"普通螺栓与高强度螺栓从中间开始，对称向两边进行紧固",{"key":31,"text":594,"correct":22},"高强度螺栓终拧后，螺栓丝扣外露2～3扣，并有10%的外露1扣或4扣",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":24,"analysis":33},1144655,"关于后张法预应力（无粘结）施工的说法，正确的是（ ）。",[599,601,603,605],{"key":20,"text":600,"correct":22},"预应力混凝土楼盖中的张拉顺序是先张拉楼面梁、后张拉楼板",{"key":24,"text":602,"correct":26},"无粘结预应力筋长度不大于40m时，可一端张拉，大于40m时，宜两端张拉",{"key":28,"text":604,"correct":22},"当曲线无粘结预应力筋长度超过20m时，宜采用两端张拉",{"key":31,"text":606,"correct":22},"当长度超过30m时，宜采用分段张拉",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":24,"analysis":33},1144657,"防水混凝土留设有后浇带时，当设计无要求时，至少应在原混凝土浇筑完成后（ ）d才能进行后浇带混凝土浇筑。",[611,613,615,617],{"key":20,"text":612,"correct":22},"21",{"key":24,"text":614,"correct":26},"28",{"key":28,"text":616,"correct":22},"14",{"key":31,"text":618,"correct":22},"60",{"id":620,"libraryId":5,"type":15,"typeLabel":16,"stem":621,"options":622,"answer":31,"analysis":33},1144658,"关于钢筋下料长度计算的说法，正确的是（ ）。",[623,625,627,629],{"key":20,"text":624,"correct":22},"直钢筋下料长度=构件长度一保护层厚度一弯钩增加长度",{"key":24,"text":626,"correct":22},"弯起钢筋下料长度=直段长度十斜段长度一弯曲调整值",{"key":28,"text":628,"correct":22},"箍筋下料长度=箍筋周长一箍筋调整值",{"key":31,"text":630,"correct":26},"箍筋周长=箍筋下料长度一箍筋调整值",{"id":632,"libraryId":5,"type":15,"typeLabel":16,"stem":633,"options":634,"answer":20,"analysis":33},1144659,"钢筋代换时，其相应费用应征得（ ）同意并办理相应手续。",[635,637,639,641],{"key":20,"text":636,"correct":26},"设计单位",{"key":24,"text":638,"correct":22},"监理单位",{"key":28,"text":640,"correct":22},"总包单位",{"key":31,"text":642,"correct":22},"建设单位",{"id":644,"libraryId":5,"type":15,"typeLabel":16,"stem":645,"options":646,"answer":20,"analysis":33},1144660,"地下室外墙卷材防水层施工做法中，正确的是（）。2018真题",[647,649,651,653],{"key":20,"text":648,"correct":26},"卷材防水层铺设在外墙的迎水面上",{"key":24,"text":650,"correct":22},"卷材防水层铺设在外墙的背水面上",{"key":28,"text":652,"correct":22},"外墙外侧卷材采用空铺法",{"key":31,"text":654,"correct":22},"铺贴双层卷材时，两层卷材相互垂直",[656,659,662,665,668,671],{"id":15,"name":657,"category":7,"favorite":658},"领导干部任职前廉政法规知识测试题",92,{"id":660,"name":661,"category":7,"favorite":15},595,"建筑结构与设备",{"id":663,"name":664,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":666,"name":667,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":669,"name":670,"category":7,"favorite":8},534,"BIM工程师",{"id":672,"name":670,"category":7,"favorite":8},535]