[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-800-24":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":645},{"id":5,"name":6,"category":7,"favorite":8},800,"一建建筑工程实务","建筑工程",0,24,50,2362,[13,38,52,67,79,91,100,112,124,136,151,165,175,187,199,211,223,235,250,265,277,289,301,316,328,340,352,364,376,388,400,412,427,442,456,470,482,497,511,524,536,544,556,567,577,589,601,609,621,633],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1144559,2,"多选题","下列关于主体结构混凝土工程施工缝留置位置的说法，正确的有（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","柱宜留置在基础、楼板、梁的顶面",true,{"key":24,"text":25,"correct":26},"B","单向板留置在平行于板的长边位置",false,{"key":28,"text":29,"correct":26},"C","有主次梁的楼板，留置在主梁跨中1／3范围内",{"key":31,"text":32,"correct":22},"D","墙留置在门洞口过梁跨中1\u002F3范围内",{"key":34,"text":35,"correct":22},"E","与板连成整体的大截面梁（高超过1m），留置在板底面以下20～30mm处","ADE","",{"id":39,"libraryId":5,"type":40,"typeLabel":41,"stem":42,"options":43,"answer":24,"analysis":37},1144560,1,"单选题","对已浇筑完毕的混凝土，应在混凝土（ ）开始进行自然养护。",[44,46,48,50],{"key":20,"text":45,"correct":26},"初凝前",{"key":24,"text":47,"correct":22},"终凝前",{"key":28,"text":49,"correct":26},"初凝后",{"key":31,"text":51,"correct":26},"强度达到1.2N／㎜2以后",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":66,"analysis":37},1144561,"关于混凝土自然养护的说法，正确的有（ ）。",[56,58,60,62,64],{"key":20,"text":57,"correct":26},"掺有缓凝型外加剂的混凝土，不得少于21d",{"key":24,"text":59,"correct":22},"在混凝土浇筑完毕后，应在8～12h以内加以覆盖和浇水",{"key":28,"text":61,"correct":22},"硅酸盐水泥拌制的混凝土，不得少于7d",{"key":31,"text":63,"correct":22},"矿渣硅酸盐水泥拌制的混凝土，不得少于7d",{"key":34,"text":65,"correct":22},"有抗渗性要求的混凝土，不得少于14d","BCDE",{"id":68,"libraryId":5,"type":40,"typeLabel":41,"stem":69,"options":70,"answer":28,"analysis":37},1144562,"对于掺用缓凝型外加剂、矿物掺合料或有抗渗性要求的混凝土，覆盖浇水养护的时间不得少于（ ）。",[71,73,75,77],{"key":20,"text":72,"correct":26},"7d",{"key":24,"text":74,"correct":26},"1Od",{"key":28,"text":76,"correct":22},"14d",{"key":31,"text":78,"correct":26},"15d",{"id":80,"libraryId":5,"type":40,"typeLabel":41,"stem":81,"options":82,"answer":24,"analysis":37},1144563,"为在现浇钢筋混凝土结构施工过程中，克服由于温度、收缩等而可能产生有害裂缝而设置的临时施工缝，称为（ ）。",[83,85,87,89],{"key":20,"text":84,"correct":26},"预留带",{"key":24,"text":86,"correct":22},"后浇带",{"key":28,"text":88,"correct":26},"涨缝",{"key":31,"text":90,"correct":26},"纵缝",{"id":92,"libraryId":5,"type":40,"typeLabel":41,"stem":93,"options":94,"answer":28,"analysis":37},1144564,"地上结构后浇带保温养护应至少保持（ ）。",[95,96,97,98],{"key":20,"text":72,"correct":26},{"key":24,"text":74,"correct":26},{"key":28,"text":76,"correct":22},{"key":31,"text":99,"correct":26},"21d",{"id":101,"libraryId":5,"type":40,"typeLabel":41,"stem":102,"options":103,"answer":31,"analysis":37},1144565,"关于后浇带设置和处理的说法，正确的是（ ）。",[104,106,108,110],{"key":20,"text":105,"correct":26},"若设计无要求，至少保留7d后再浇筑",{"key":24,"text":107,"correct":26},"填充后浇带，可采用高膨胀混凝土",{"key":28,"text":109,"correct":26},"膨胀混凝土强度等级与原结构强度相同",{"key":31,"text":111,"correct":22},"填充混凝土保持至少14d的湿润养护",{"id":113,"libraryId":5,"type":40,"typeLabel":41,"stem":114,"options":115,"answer":20,"analysis":37},1144566,"在已浇筑的楼面上安装模板及支架时，其混凝土强度应至少达到（ ）。",[116,118,120,122],{"key":20,"text":117,"correct":22},"1.2N\u002Fmm2",{"key":24,"text":119,"correct":26},"2.5N\u002Fmm2",{"key":28,"text":121,"correct":26},"设计强度的25%",{"key":31,"text":123,"correct":26},"设计强度的50%",{"id":125,"libraryId":5,"type":40,"typeLabel":41,"stem":126,"options":127,"answer":20,"analysis":37},1144567,"关于混凝土养护的说法，正确的是（ ）。",[128,130,132,134],{"key":20,"text":129,"correct":22},"通常为混凝土浇筑完毕后8～12h内，开始进行自然养护",{"key":24,"text":131,"correct":26},"在已浇筑的混凝土强度未达到1.ON\u002Fmm2以前，不得在其上踩踏或安装模板",{"key":28,"text":133,"correct":26},"硅酸盐水泥、普通硅酸盐水泥拌制的混凝土，养护时间不得少于5d",{"key":31,"text":135,"correct":26},"火山灰质硅酸盐水泥、粉煤灰硅酸盐水泥拌制的混凝土，养护时间不得少于12d",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":150,"analysis":37},1144568,"关于先张法与后张法相比的不同点的说法，正确的有（ ）。",[140,142,144,146,148],{"key":20,"text":141,"correct":26},"张拉机械不同",{"key":24,"text":143,"correct":22},"张拉控制应力不同",{"key":28,"text":145,"correct":22},"先张法的锚具可取下来重复使用，后张法则不能",{"key":31,"text":147,"correct":22},"施工工艺不同",{"key":34,"text":149,"correct":26},"先张法适用于生产大型预应力混凝土构件，后张法适用于生产中小型构件","BCD",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":66,"analysis":37},1144569,"液压张拉千斤顶按机型不同可分为（ ）。",[155,157,159,161,163],{"key":20,"text":156,"correct":26},"槽式",{"key":24,"text":158,"correct":22},"穿心式",{"key":28,"text":160,"correct":22},"拉杆式",{"key":31,"text":162,"correct":22},"锥锚式",{"key":34,"text":164,"correct":22},"台座式",{"id":166,"libraryId":5,"type":40,"typeLabel":41,"stem":167,"options":168,"answer":20,"analysis":37},1144570,"在已浇筑的混凝土强度未达到（ ）以前，不得在其上踩踏或安装模板及支架等。",[169,171,173,174],{"key":20,"text":170,"correct":22},"1.2N\u002Fm㎡",{"key":24,"text":172,"correct":26},"2.5N\u002Fm㎡",{"key":28,"text":121,"correct":26},{"key":31,"text":123,"correct":26},{"id":176,"libraryId":5,"type":40,"typeLabel":41,"stem":177,"options":178,"answer":31,"analysis":37},1144571,"后张法有粘结预应力施工中，孔道灌浆所使用的水泥浆强度不应小于（ ）。",[179,181,183,185],{"key":20,"text":180,"correct":26},"10N\u002Fm㎡",{"key":24,"text":182,"correct":26},"15N\u002Fm㎡",{"key":28,"text":184,"correct":26},"20N\u002Fm㎡",{"key":31,"text":186,"correct":22},"30N\u002Fm㎡",{"id":188,"libraryId":5,"type":40,"typeLabel":41,"stem":189,"options":190,"answer":28,"analysis":37},1144572,"由于无粘结预应力筋一般为曲线配筋，故应采用（ ）。",[191,193,195,197],{"key":20,"text":192,"correct":26},"先两端张拉，后浇筑混凝土",{"key":24,"text":194,"correct":26},"先浇筑混凝土，后一端张拉，一端锚固",{"key":28,"text":196,"correct":22},"先浇筑混凝土，后两端同时或分段张拉",{"key":31,"text":198,"correct":26},"先一端张拉，一端锚固，后浇筑混凝土",{"id":200,"libraryId":5,"type":40,"typeLabel":41,"stem":201,"options":202,"answer":24,"analysis":37},1144573,"先张法预应力施工中，预应力筋放张时，混凝土强度应符合设计要求，当设计无要求时，混凝土强度不应低于标准值的（ ）。",[203,205,207,209],{"key":20,"text":204,"correct":26},"70%",{"key":24,"text":206,"correct":22},"75%",{"key":28,"text":208,"correct":26},"80%",{"key":31,"text":210,"correct":26},"85%",{"id":212,"libraryId":5,"type":40,"typeLabel":41,"stem":213,"options":214,"answer":24,"analysis":37},1144574,"关于后张法预应力筋的张拉控制，下列说法正确的是（ ）。",[215,217,219,221],{"key":20,"text":216,"correct":26},"以控制张拉伸长值为主，张拉力值作校核",{"key":24,"text":218,"correct":22},"以控制张拉力值为主，张拉伸长值作校核",{"key":28,"text":220,"correct":26},"普通松弛预应力筋以控制张拉伸长值为主",{"key":31,"text":222,"correct":26},"低松弛预应力筋以控制张拉伸长值为主",{"id":224,"libraryId":5,"type":40,"typeLabel":41,"stem":225,"options":226,"answer":31,"analysis":37},1144575,"关于先张法预应力施工的说法，不正确的是（ ）。",[227,229,231,233],{"key":20,"text":228,"correct":26},"施加预应力宜采用一端张拉工艺",{"key":24,"text":230,"correct":26},"台座应有足够的强度、刚度和稳定性",{"key":28,"text":232,"correct":26},"在浇筑混凝土前，发生断裂或滑脱的预应力筋必须予以更换",{"key":31,"text":234,"correct":22},"预应力筋放张时，当无设计要求时，不应低于设计的混凝土立方体抗压强度标准值的70%",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":249,"analysis":37},1144576,"关于后张法有粘结预应力施工中孔道留设的方法，正确的有（ ）。",[239,241,243,245,247],{"key":20,"text":240,"correct":22},"预埋金属螺旋管留孔",{"key":24,"text":242,"correct":22},"预埋塑料波纹管留孔",{"key":28,"text":244,"correct":26},"预埋泡沫塑料棒留孔",{"key":31,"text":246,"correct":22},"抽拔钢管留孔",{"key":34,"text":248,"correct":22},"胶管充气抽芯留孔","ABDE",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":264,"analysis":37},1144577,"后张法有粘结预应力施工中，与预应力筋孔道同时留设的孔道有（ ）。",[254,256,258,260,262],{"key":20,"text":255,"correct":26},"观测孔",{"key":24,"text":257,"correct":26},"加压孔",{"key":28,"text":259,"correct":22},"灌浆孔",{"key":31,"text":261,"correct":22},"排气孔",{"key":34,"text":263,"correct":22},"泌水管。","CDE",{"id":266,"libraryId":5,"type":40,"typeLabel":41,"stem":267,"options":268,"answer":24,"analysis":37},1144578,"预应力筋张拉或放张时，混凝土强度应符合设计要求，当设计无具体要求时，至少不应低于设计混凝土立方体抗压强度标准值的（ ）%。",[269,271,273,275],{"key":20,"text":270,"correct":26},"50",{"key":24,"text":272,"correct":22},"75",{"key":28,"text":274,"correct":26},"80",{"key":31,"text":276,"correct":26},"95",{"id":278,"libraryId":5,"type":40,"typeLabel":41,"stem":279,"options":280,"answer":24,"analysis":37},1144579,"后张法无粘结预应力混凝土梁板施工中，预应力筋的张拉顺序是（ ）。",[281,283,285,287],{"key":20,"text":282,"correct":26},"先张拉梁，后张拉板",{"key":24,"text":284,"correct":22},"先张拉板，后张拉梁",{"key":28,"text":286,"correct":26},"梁和板交替张拉",{"key":31,"text":288,"correct":26},"根据施工方便确定",{"id":290,"libraryId":5,"type":40,"typeLabel":41,"stem":291,"options":292,"answer":20,"analysis":37},1144580,"通常在预应力混凝土楼盖中的张拉顺序是（ ）。",[293,295,297,299],{"key":20,"text":294,"correct":22},"先张拉楼板、后张拉楼面梁",{"key":24,"text":296,"correct":26},"板中的无粘结筋须集中张拉",{"key":28,"text":298,"correct":26},"先张拉楼面梁、后张拉楼板",{"key":31,"text":300,"correct":26},"板中的无粘结筋须分批张拉",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":315,"analysis":37},1144581,"关于施工中砌筑砂浆稠度的选择，下列做法中正确的是（ ）。",[305,307,309,311,313],{"key":20,"text":306,"correct":26},"雨期施工，砂浆的稠度值应适当增加",{"key":24,"text":308,"correct":26},"冬期施工，砂浆的稠度值应适当增加",{"key":28,"text":310,"correct":22},"当在干热条件下砌筑时，应选用较大稠度值的砂浆",{"key":31,"text":312,"correct":22},"当在湿冷条件下砌筑时，应选用较小稠度值的砂浆",{"key":34,"text":314,"correct":26},"当砌筑材料为粗糙多孔且吸水较大的块料时，应选用较小稠度值的砂浆","CD",{"id":317,"libraryId":5,"type":40,"typeLabel":41,"stem":318,"options":319,"answer":20,"analysis":37},1144582,"施工期间最高气温超过30℃时，现场拌制砂浆使用完毕时间是（ ）h内。",[320,322,324,326],{"key":20,"text":321,"correct":22},"2.0",{"key":24,"text":323,"correct":26},"2.5",{"key":28,"text":325,"correct":26},"3.0",{"key":31,"text":327,"correct":26},"4.0",{"id":329,"libraryId":5,"type":40,"typeLabel":41,"stem":330,"options":331,"answer":31,"analysis":37},1144583,"砌体结构中，最常见的砌筑方法是（ ）。",[332,334,336,338],{"key":20,"text":333,"correct":26},"挤浆法",{"key":24,"text":335,"correct":26},"刮浆法",{"key":28,"text":337,"correct":26},"满口灰法",{"key":31,"text":339,"correct":22},"“三一”砌筑法",{"id":341,"libraryId":5,"type":40,"typeLabel":41,"stem":342,"options":343,"answer":28,"analysis":37},1144584,"关于砌筑砂浆机械搅拌时间的说法，正确的是（ ）。",[344,346,348,350],{"key":20,"text":345,"correct":26},"掺用有机塑化剂的砂浆，不得少于2min",{"key":24,"text":347,"correct":26},"掺用外加剂的砂浆，不得少于2min",{"key":28,"text":349,"correct":22},"水泥砂浆，不得少于2min",{"key":31,"text":351,"correct":26},"水泥粉煤灰砂浆，不得少于2min",{"id":353,"libraryId":5,"type":40,"typeLabel":41,"stem":354,"options":355,"answer":20,"analysis":37},1144585,"关于现场拌制的砌筑砂浆使用时间的说法，正确的是（ ）。",[356,358,360,362],{"key":20,"text":357,"correct":22},"常温下（30℃以下）水泥混合砂浆应在3h内使用完毕",{"key":24,"text":359,"correct":26},"高温下（30℃以上）水泥砂浆应在3h内使用完毕",{"key":28,"text":361,"correct":26},"水泥砂浆、混合砂浆应分别在2h和3h内使用完毕",{"key":31,"text":363,"correct":26},"水泥砂浆、混合砂浆应分别在3h和2h内使用完毕",{"id":365,"libraryId":5,"type":40,"typeLabel":41,"stem":366,"options":367,"answer":31,"analysis":37},1144586,"关于砌体结构施工的做法，错误的是（ ）。",[368,370,372,374],{"key":20,"text":369,"correct":26},"“三一”砌筑法，即一铲灰、一块砖、一揉压",{"key":24,"text":371,"correct":26},"正常施工条件下，砖砌体每日砌筑高度宜控制在1.5m高度内",{"key":28,"text":373,"correct":26},"砖砌体的水平灰缝厚度为11mm",{"key":31,"text":375,"correct":22},"常温情况下砖砌体砌筑时，提前1～2h浇水湿润，烧结类块体的相对含水率宜为60%～70%",{"id":377,"libraryId":5,"type":40,"typeLabel":41,"stem":378,"options":379,"answer":20,"analysis":37},1144587,"关于砂浆强度评定的说法，正确的是（ ）。",[380,382,384,386],{"key":20,"text":381,"correct":22},"边长为7.07cm的正方体试件，28d标准养护，测得一组三块的抗压强度值",{"key":24,"text":383,"correct":26},"边长为7.07cm的正方体试件，14d标准养护，测得一组六块的抗压强度值",{"key":28,"text":385,"correct":26},"边长为10.0cm的正方体试件，28d标准养护，测得一组三块的抗压强度值",{"key":31,"text":387,"correct":26},"边长为10.0cm的正方体试件，14d标准养护，测得一组六块的抗压强度值",{"id":389,"libraryId":5,"type":40,"typeLabel":41,"stem":390,"options":391,"answer":24,"analysis":37},1144588,"砌砖工程当采用铺浆法砌筑时，施工期间气温超过30℃时，铺浆长度最大不得超过（ ）mm。",[392,394,396,398],{"key":20,"text":393,"correct":26},"400",{"key":24,"text":395,"correct":22},"500",{"key":28,"text":397,"correct":26},"600",{"key":31,"text":399,"correct":26},"700",{"id":401,"libraryId":5,"type":40,"typeLabel":41,"stem":402,"options":403,"answer":31,"analysis":37},1144589,"用于测定砌筑砂浆抗压强度的试块，其养护龄期是（ ）d。",[404,406,408,410],{"key":20,"text":405,"correct":26},"7",{"key":24,"text":407,"correct":26},"14",{"key":28,"text":409,"correct":26},"21",{"key":31,"text":411,"correct":22},"28",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":426,"analysis":37},1144590,"关于烧结普通砖砌体砌筑施工技术的说法，正确的有（ ）。",[416,418,420,422,424],{"key":20,"text":417,"correct":22},"砖墙灰缝宽度宜为10mm，且不应小于8mm，也不应大于12mm",{"key":24,"text":419,"correct":22},"砖墙上临时施工洞口，其侧边离交接处墙面不应小于500mm，净宽不应超过1m",{"key":28,"text":421,"correct":22},"斜槎水平投影长度不应小于高度的2\u002F3",{"key":31,"text":423,"correct":22},"砖墙工作段的分段位置，宜设在变形缝、构造柱或门窗洞口处",{"key":34,"text":425,"correct":26},"砖墙每日砌筑高度不宜超过1.8m；雨天施工时不宜超过1.5m","ABCD",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":441,"analysis":37},1144591,"关于砌体直槎处拉结钢筋的说法，以下正确的是（ ）。",[431,433,435,437,439],{"key":20,"text":432,"correct":22},"非抗震设防及抗震设防烈度为6度、7度地区的临时间断处，当不能留置斜槎时，除转角处外，可留直槎，但直槎必须做成凸槎",{"key":24,"text":434,"correct":22},"120mm墙厚应放置2①6的拉结钢筋",{"key":28,"text":436,"correct":26},"间距沿墙高不应超过600mm",{"key":31,"text":438,"correct":22},"抗震设防6度、7度地区，埋入长度从留槎处算起每边均不应小于1000mm",{"key":34,"text":440,"correct":26},"末端应有180°弯钩","ABD",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":249,"analysis":37},1144592,"关于抗震设防烈度为6度、7度地区烧结普通砖砌体留直槎加设拉结钢筋的说法，正确的有（ ）。",[446,448,450,452,454],{"key":20,"text":447,"correct":22},"末端应有90°弯钩",{"key":24,"text":449,"correct":22},"拉结钢筋的数量为每120mm墙厚放置1φ6拉结钢筋（120mm厚墙放置2φ6拉结钢筋）",{"key":28,"text":451,"correct":26},"拉结钢筋的数量为每240mm厚墙放置2φ6拉结钢筋",{"key":31,"text":453,"correct":22},"间距沿墙高不应超过500mm",{"key":34,"text":455,"correct":22},"埋入长度从留槎处算起每边均不应小于1000mm",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":36,"analysis":37},1144593,"关于设有钢筋混凝土构造柱的抗震多层砖房施工的说法，正确的有（ ）。",[460,462,464,466,468],{"key":20,"text":461,"correct":22},"先绑扎构造柱钢筋，然后砌砖墙",{"key":24,"text":463,"correct":26},"构造柱沿高度方向每1OOOmm设一道拉结筋",{"key":28,"text":465,"correct":26},"拉结筋每边深入砖墙不少于500mm",{"key":31,"text":467,"correct":22},"马牙槎沿高度方向的尺寸不超过300mm",{"key":34,"text":469,"correct":22},"马牙槎从每层柱脚开始，应先退后进",{"id":471,"libraryId":5,"type":40,"typeLabel":41,"stem":472,"options":473,"answer":24,"analysis":37},1144594,"关于在墙上留置的临时施工洞的说法，正确的是（ ）。",[474,476,478,480],{"key":20,"text":475,"correct":26},"侧边离交接处墙面不应小于500mm，洞口净宽不应超过0.8m",{"key":24,"text":477,"correct":22},"侧边离交接处墙面不应小于500mm，洞口净宽不应超过1m",{"key":28,"text":479,"correct":26},"侧边离交接处墙面不应小于800mm，洞口净宽不应超过0.8m",{"key":31,"text":481,"correct":26},"侧边离交接处墙面不应小于800mm，洞口净宽不应超过1m",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":496,"analysis":37},1144595,"可以设置脚手眼的墙体或部位有（ ）。",[486,488,490,492,494],{"key":20,"text":487,"correct":22},"180mm厚的墙体",{"key":24,"text":489,"correct":26},"宽度为900mm的窗间墙",{"key":28,"text":491,"correct":22},"砌体门窗洞口两侧400mm处",{"key":31,"text":493,"correct":26},"梁下450mm处",{"key":34,"text":495,"correct":26},"过梁净跨度1\u002F3高度处","AC",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":36,"analysis":37},1144596,"关于砌体工程中不得设置脚手眼的说法中，正确的有（ ）。",[501,503,505,507,509],{"key":20,"text":502,"correct":22},"120mm厚墙、清水墙和独立柱",{"key":24,"text":504,"correct":26},"砌体门窗洞口两侧300mm范围内",{"key":28,"text":506,"correct":26},"宽度为1.2m的窗间墙",{"key":31,"text":508,"correct":22},"过梁上与过梁成60°角的三角形范围及过梁净跨度1\u002F2的高度范围内",{"key":34,"text":510,"correct":22},"梁或梁垫下及其左右500mm范围内",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":66,"analysis":37},1144597,"下列墙体或部位不得设置脚手眼的有（ ）。",[515,517,519,520,522],{"key":20,"text":516,"correct":26},"宽度小于2m的窗间墙",{"key":24,"text":518,"correct":22},"门窗洞口两侧石砌体300mm，其他砌体200mm范围内",{"key":28,"text":510,"correct":22},{"key":31,"text":521,"correct":22},"过梁上与过梁成60。的三角形范围及过梁净跨度1\u002F2的高度范围内",{"key":34,"text":523,"correct":22},"转角处石砌体600mm，其他砌体450mm范围内",{"id":525,"libraryId":5,"type":40,"typeLabel":41,"stem":526,"options":527,"answer":28,"analysis":37},1144599,"当设计无要求时，在240mm厚的实心砌体上留设脚手眼的做法，正确的是（ ）。",[528,530,532,534],{"key":20,"text":529,"correct":26},"过梁上一皮砖处",{"key":24,"text":531,"correct":26},"厚度为800mm的窗间墙上",{"key":28,"text":533,"correct":22},"距转角550mm处",{"key":31,"text":535,"correct":26},"梁垫下一皮砖处",{"id":537,"libraryId":5,"type":40,"typeLabel":41,"stem":538,"options":539,"answer":24,"analysis":37},1144600,"关于砌体墙上留置临时施工洞口的说法，正确的是（ ）。",[540,541,542,543],{"key":20,"text":475,"correct":26},{"key":24,"text":477,"correct":22},{"key":28,"text":479,"correct":26},{"key":31,"text":481,"correct":26},{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":36,"analysis":37},1144601,"下列砌体工程的各部位中，不得设置脚手眼的有（ ）。",[548,550,552,553,555],{"key":20,"text":549,"correct":22},"120mm厚墙",{"key":24,"text":551,"correct":26},"240mm厚墙",{"key":28,"text":506,"correct":26},{"key":31,"text":554,"correct":22},"过梁上与过梁成60°角的三角形范围内",{"key":34,"text":510,"correct":22},{"id":557,"libraryId":5,"type":40,"typeLabel":41,"stem":558,"options":559,"answer":24,"analysis":37},1144602,"砖砌体工程中可设置脚手眼的墙体或部位是（ ）。",[560,561,563,565],{"key":20,"text":549,"correct":26},{"key":24,"text":562,"correct":22},"砌体门窗洞口两侧450mm处",{"key":28,"text":564,"correct":26},"独立柱",{"key":31,"text":566,"correct":26},"宽度为800mm的窗间墙",{"id":568,"libraryId":5,"type":40,"typeLabel":41,"stem":569,"options":570,"answer":20,"analysis":37},1144603,"正常施工条件下，砖墙每日砌筑高度不宜超过（ ）m。",[571,573,574,576],{"key":20,"text":572,"correct":22},"1.5",{"key":24,"text":321,"correct":26},{"key":28,"text":575,"correct":26},"2.2",{"key":31,"text":323,"correct":26},{"id":578,"libraryId":5,"type":40,"typeLabel":41,"stem":579,"options":580,"answer":31,"analysis":37},1144604,"关于砖墙留置临时施工洞口的说法，正确的是（ ）。",[581,583,585,587],{"key":20,"text":582,"correct":26},"侧边离交接处墙面不应小于400mm，洞口净宽不应超过1.8m",{"key":24,"text":584,"correct":26},"侧边离交接处墙面不应小于400mm，洞口净宽不应超过1.5m",{"key":28,"text":586,"correct":26},"侧边离交接处墙面不应小于500mm，洞口净宽不应超过1.2m",{"key":31,"text":588,"correct":22},"侧边离交接处墙面不应小于500mm，洞口净宽不应超过Im",{"id":590,"libraryId":5,"type":40,"typeLabel":41,"stem":591,"options":592,"answer":28,"analysis":37},1144605,"关于抗震多层砖房钢筋混凝土构造柱施工技术的说法，正确的是（ ）。",[593,595,597,599],{"key":20,"text":594,"correct":26},"先砌砖墙，后绑扎钢筋，最后浇筑混凝土",{"key":24,"text":596,"correct":26},"墙与柱应沿高度方向每500mm设1φ6钢筋（一砖墙）",{"key":28,"text":598,"correct":22},"构造柱应与圈梁连接",{"key":31,"text":600,"correct":26},"砖墙应砌成马牙槎，马牙槎沿高度方向的尺寸不超过500mm",{"id":602,"libraryId":5,"type":40,"typeLabel":41,"stem":603,"options":604,"answer":20,"analysis":37},1144606,"砖砌体每日砌筑高度在正常施工条件下宜控制在（ ）m或一步脚手架高度内。",[605,606,607,608],{"key":20,"text":572,"correct":22},{"key":24,"text":321,"correct":26},{"key":28,"text":323,"correct":26},{"key":31,"text":325,"correct":26},{"id":610,"libraryId":5,"type":40,"typeLabel":41,"stem":611,"options":612,"answer":31,"analysis":37},1144607,"关于正常施工条件下的砖墙每日砌筑高度的说法，正确的是（ ）。",[613,615,617,619],{"key":20,"text":614,"correct":26},"不宜超过2.0m；雨天施工时不宜超过1.5m",{"key":24,"text":616,"correct":26},"不宜超过1.8m；雨天施工时不宜超过1.5m",{"key":28,"text":618,"correct":26},"不宜超过1.8m；雨天施工时不宜超过1.2m",{"key":31,"text":620,"correct":22},"均不宜超过1.5m",{"id":622,"libraryId":5,"type":40,"typeLabel":41,"stem":623,"options":624,"answer":28,"analysis":37},1144608,"在普通砖砌工程中，对不能同时砌筑而又必须留置的临时间断处应砌成斜槎，斜槎水平投影长度至少不应小于高度的（ ）倍。",[625,627,629,631],{"key":20,"text":626,"correct":26},"1\u002F3",{"key":24,"text":628,"correct":26},"1\u002F2",{"key":28,"text":630,"correct":22},"2\u002F3",{"key":31,"text":632,"correct":26},"1",{"id":634,"libraryId":5,"type":40,"typeLabel":41,"stem":635,"options":636,"answer":28,"analysis":37},1144609,"关于砖墙工作段分段位置的说法，正确的是（ ）。",[637,639,641,643],{"key":20,"text":638,"correct":26},"不宜设在变形缝、构造柱处",{"key":24,"text":640,"correct":26},"砌筑高度不宜大于6m",{"key":28,"text":642,"correct":22},"宜设在门窗洞口处",{"key":31,"text":644,"correct":26},"相邻工作段的砌筑高度不得超过二个楼层高度",[646,649,652,655,658,661],{"id":40,"name":647,"category":7,"favorite":648},"领导干部任职前廉政法规知识测试题",92,{"id":650,"name":651,"category":7,"favorite":40},595,"建筑结构与设备",{"id":653,"name":654,"category":7,"favorite":40},715,"招标采购专业知识与法律法规",{"id":656,"name":657,"category":7,"favorite":40},848,"市政方向-通用基础",{"id":659,"name":660,"category":7,"favorite":8},534,"BIM工程师",{"id":662,"name":660,"category":7,"favorite":8},535]