[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-800-23":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":658},{"id":5,"name":6,"category":7,"favorite":8},800,"一建建筑工程实务","建筑工程",0,23,50,2362,[13,34,46,58,68,86,98,113,128,143,155,167,178,192,207,216,225,237,249,264,276,287,299,311,323,335,345,359,371,386,400,415,429,441,453,467,475,490,505,519,531,546,558,573,585,597,610,622,634,646],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1144509,1,"单选题","同钢号钢筋之间代换时，按钢筋代换前后（ ）相等的原则进行代换。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","硬度",false,{"key":24,"text":25,"correct":22},"B","强度",{"key":27,"text":28,"correct":22},"C","数量",{"key":30,"text":31,"correct":32},"D","面积",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1144510,"关于钢筋代换原则的说法，正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":32},"当构件受裂缝宽度或挠度控制时，代换前后应进行裂缝宽度和挠度检验",{"key":24,"text":41,"correct":22},"当构件配筋受强度控制时，按钢筋代换前后面积相等的原则进行代换",{"key":27,"text":43,"correct":22},"当构件按最小配筋率配筋时，按钢筋代换前后强度相等的原则进行代换",{"key":30,"text":45,"correct":22},"同钢号钢筋之间的代换，按钢筋代换前后数量相等的原则进行代换",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1144511,"衡量钢筋延性性能指标的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"屈服强度",{"key":24,"text":53,"correct":22},"可焊性",{"key":27,"text":55,"correct":32},"伸长率",{"key":30,"text":57,"correct":22},"极限抗拉强度",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1144512,"冷弯性是反映钢筋性能中的（ ）指标。",[62,63,65,67],{"key":20,"text":51,"correct":22},{"key":24,"text":64,"correct":22},"延伸率",{"key":27,"text":66,"correct":32},"塑性",{"key":30,"text":25,"correct":22},{"id":69,"libraryId":5,"type":70,"typeLabel":71,"stem":72,"options":73,"answer":85,"analysis":33},1144513,2,"多选题","关于钢筋工程，下列说法正确的有（ ）。",[74,76,78,80,82],{"key":20,"text":75,"correct":22},"热轧钢筋按屈服强度（MPa）分为300级、335级、400级三种",{"key":24,"text":77,"correct":32},"钢筋机械连接所采用的钢筋最小直径宜为16mm",{"key":27,"text":79,"correct":32},"当受压钢筋直径大于28mm时，不宜采用绑扎搭接接头",{"key":30,"text":81,"correct":32},"矩形柱中的竖向钢筋搭接时，角部钢筋的弯钩与模板成45°",{"key":83,"text":84,"correct":32},"E","框架节点处钢筋穿插十分稠密时，梁顶面主筋间的净距要有30mm","BCDE",{"id":87,"libraryId":5,"type":15,"typeLabel":16,"stem":88,"options":89,"answer":27,"analysis":33},1144514,"当设计无要求时，关于混凝土基础钢筋工程中钢筋连接的说法，正确的是（ ）。",[90,92,94,96],{"key":20,"text":91,"correct":22},"受力钢筋的接头宜设置在受力较大处",{"key":24,"text":93,"correct":22},"在同一根纵向受力钢筋上宜设置两个或两个以上接头",{"key":27,"text":95,"correct":32},"直接承受动力荷载的结构构件中，纵向钢筋不宜采用焊接接头",{"key":30,"text":97,"correct":22},"当受拉钢筋的直径d＞28mm，宜采用绑扎搭接接头",{"id":99,"libraryId":5,"type":70,"typeLabel":71,"stem":100,"options":101,"answer":112,"analysis":33},1144515,"关于钢筋冷拉伸长率的说法，正确的有（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":32},"HRB335级钢筋，不宜大于1%",{"key":24,"text":105,"correct":32},"HRB400级钢筋，不宜大于1%",{"key":27,"text":107,"correct":22},"RRB400级钢筋，不宜大于2%",{"key":30,"text":109,"correct":22},"RRB500级钢筋，不宜大于2%",{"key":83,"text":111,"correct":32},"HPB300级钢筋，不宜大于4%","ABE",{"id":114,"libraryId":5,"type":70,"typeLabel":71,"stem":115,"options":116,"answer":127,"analysis":33},1144516,"在混凝土基础施工中，关于钢筋绑扎连接（或搭接）的说法，正确的有（ ）。",[117,119,121,123,125],{"key":20,"text":118,"correct":22},"受拉钢筋直径大于28mm时，宜采用绑扎搭接接头",{"key":24,"text":120,"correct":32},"受压钢筋直径大于28mm时，不宜采用绑扎搭接接头",{"key":27,"text":122,"correct":22},"轴心受拉杆件的纵向受力钢筋的纵向受力钢筋，可绑扎搭接接头",{"key":30,"text":124,"correct":22},"直接承受动力荷载结构中小偏心受拉杆件的纵向受力钢筋，可绑扎搭接接头",{"key":83,"text":126,"correct":32},"直接承受动力荷载结构中轴心受拉杆件的纵向受力钢筋，不得绑扎搭接接头","BE",{"id":129,"libraryId":5,"type":70,"typeLabel":71,"stem":130,"options":131,"answer":142,"analysis":33},1144517,"关于钢筋接头位置设置的说法，正确的有（ ）。",[132,134,136,138,140],{"key":20,"text":133,"correct":32},"受力较小处",{"key":24,"text":135,"correct":32},"同一纵向受力钢筋不宜设置两个或两个以上接头",{"key":27,"text":137,"correct":32},"接头末端至钢筋弯起点的距离不应小于钢筋直径的10倍",{"key":30,"text":139,"correct":22},"施工现场抽取钢筋机械连接接头，作化学性能检验",{"key":83,"text":141,"correct":32},"施工现场焊接接头试件作力学性能检验","ABCE",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":30,"analysis":33},1144518,"关于钢筋加工的说法，正确的是（ ）。",[147,149,151,153],{"key":20,"text":148,"correct":22},"钢筋冷拉调直时，不能同时进行除锈",{"key":24,"text":150,"correct":22},"HRB400级钢筋采用冷拉调直时，伸长率允许最大值为4%",{"key":27,"text":152,"correct":22},"钢筋的切断口允许有马蹄形现象",{"key":30,"text":154,"correct":32},"钢筋加工宜在常温状态下进行，加工过程中不应加热钢筋",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":20,"analysis":33},1144519,"关于控制钢筋伸长率的说法，正确的是（ ）。",[159,161,163,165],{"key":20,"text":160,"correct":32},"HPB300级钢筋，冷拉伸长率不宜大于4％",{"key":24,"text":162,"correct":22},"HRB335级钢筋，冷拉伸长率不宜大于3％",{"key":27,"text":164,"correct":22},"HRB300级钢筋，冷拉伸长率不宜大于2％",{"key":30,"text":166,"correct":22},"RRB400级钢筋，冷拉伸长率不宜大于2％",{"id":168,"libraryId":5,"type":70,"typeLabel":71,"stem":169,"options":170,"answer":127,"analysis":33},1144520,"关于钢筋绑扎连接（或搭接）的说法，正确的有（ ）。",[171,172,173,175,177],{"key":20,"text":118,"correct":22},{"key":24,"text":120,"correct":32},{"key":27,"text":174,"correct":22},"轴心受拉杆件的纵向受力钢筋，可绑扎搭接接头",{"key":30,"text":176,"correct":22},"直接承受动力荷载结构中的纵向受力钢筋，可绑扎搭接接头",{"key":83,"text":126,"correct":32},{"id":179,"libraryId":5,"type":70,"typeLabel":71,"stem":180,"options":181,"answer":142,"analysis":33},1144521,"关于钢筋施工工艺的说法，错误的有（ ）。",[182,184,186,188,190],{"key":20,"text":183,"correct":32},"水平构件不得采用绑扎接头，垂直构件不得采用机械接头",{"key":24,"text":185,"correct":32},"现场由焊工专门制作焊接接头，作为焊接试件",{"key":27,"text":187,"correct":32},"同一受力钢筋不得出现两个以上的接头",{"key":30,"text":189,"correct":22},"螺纹连接的做法不适用于φ16以下的钢筋",{"key":83,"text":191,"correct":32},"受拉钢筋直径大于20mm时，不宜再采用绑扎接头",{"id":193,"libraryId":5,"type":70,"typeLabel":71,"stem":194,"options":195,"answer":206,"analysis":33},1144522,"常用的钢筋连接方法有（ ）。",[196,198,200,202,204],{"key":20,"text":197,"correct":32},"焊接连接",{"key":24,"text":199,"correct":22},"铆钉连接",{"key":27,"text":201,"correct":22},"化学粘结",{"key":30,"text":203,"correct":32},"机械连接",{"key":83,"text":205,"correct":32},"绑扎连接","ADE",{"id":208,"libraryId":5,"type":70,"typeLabel":71,"stem":209,"options":210,"answer":206,"analysis":33},1144523,"常用的钢筋连接方法有()。",[211,212,213,214,215],{"key":20,"text":197,"correct":32},{"key":24,"text":199,"correct":22},{"key":27,"text":201,"correct":22},{"key":30,"text":203,"correct":32},{"key":83,"text":205,"correct":32},{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":20,"analysis":33},1144524,"当采用冷拉调直钢筋时，必须控制钢筋的（ ）。",[220,221,222,224],{"key":20,"text":55,"correct":32},{"key":24,"text":51,"correct":22},{"key":27,"text":223,"correct":22},"强屈比",{"key":30,"text":64,"correct":22},{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":30,"analysis":33},1144525,"钢筋工程机械连接接头试验时发现有1个试件的抗拉强度不符合要求，这时应再取（ ）个试件进行复检。",[229,231,233,235],{"key":20,"text":230,"correct":22},"3",{"key":24,"text":232,"correct":22},"4",{"key":27,"text":234,"correct":22},"5",{"key":30,"text":236,"correct":32},"6",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":24,"analysis":33},1144526,"关于钢筋混凝土结构楼板、次梁与主梁上层钢筋交叉处钢筋安装的通常做法，正确的是（ ）。",[241,243,245,247],{"key":20,"text":242,"correct":22},"板的钢筋在下，次梁钢筋居中，主梁钢筋在上",{"key":24,"text":244,"correct":32},"板的钢筋在上，次梁钢筋居中，主梁钢筋在下",{"key":27,"text":246,"correct":22},"板的钢筋居中，次梁钢筋在下，主梁钢筋在上",{"key":30,"text":248,"correct":22},"板的钢筋在下，次粱钢筋在上，主梁钢筋居中",{"id":250,"libraryId":5,"type":70,"typeLabel":71,"stem":251,"options":252,"answer":263,"analysis":33},1144527,"关于钢筋安装工程的说法，正确的有（ ）。",[253,255,257,259,261],{"key":20,"text":254,"correct":22},"框架梁钢筋一般应安装在柱纵向钢筋外侧",{"key":24,"text":256,"correct":32},"柱箍筋转角与纵向钢筋交叉点均应扎牢",{"key":27,"text":258,"correct":32},"楼板的钢筋中间部分可以相隔交叉绑扎",{"key":30,"text":260,"correct":22},"现浇悬挑板上部负筋被踩下可以不修理",{"key":83,"text":262,"correct":32},"主次梁交叉处主梁钢筋通常在下","BCE",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":27,"analysis":33},1144528,"关于基础钢筋施工的说法，正确的是（ ）。",[268,270,272,274],{"key":20,"text":269,"correct":22},"钢筋网绑扎时，必须将全部钢筋相交点扎牢，不可漏绑",{"key":24,"text":271,"correct":22},"底板双层钢筋，上层钢筋弯钩朝下，下层可朝上或水平",{"key":27,"text":273,"correct":32},"纵向受力钢筋混凝土保护层不应小于40mm，无垫层时不应小于70mm",{"key":30,"text":275,"correct":22},"独立柱基础为双向钢筋时，其底面长边钢筋应放在短边钢筋的上面",{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":20,"analysis":33},1144529,"无圈梁或垫梁时，板、次梁与主梁交叉处钢筋绑扎的是（ ）。",[280,281,283,285],{"key":20,"text":244,"correct":32},{"key":24,"text":282,"correct":22},"次梁钢筋在上，板的钢筋居中，主梁钢筋在下",{"key":27,"text":284,"correct":22},"主梁钢筋在上，次梁钢筋居中，板的钢筋在下",{"key":30,"text":286,"correct":22},"板的钢筋在上，主梁钢筋居中，次梁钢筋在下",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":27,"analysis":33},1144530,"关于梁、板钢筋绑扎的说法，正确的是（ ）。",[291,293,295,297],{"key":20,"text":292,"correct":22},"梁的高度较小时，梁的钢筋宜在梁底模上绑扎",{"key":24,"text":294,"correct":22},"梁的高度较大时，梁的钢筋宜架空在梁模板顶上绑扎",{"key":27,"text":296,"correct":32},"板、次梁与主梁交叉处，板的钢筋在上，次梁的钢筋居中，主梁的钢筋在下",{"key":30,"text":298,"correct":22},"框架节点处钢筋穿插十分稠密时，应保证梁顶面主筋间的净距最小值1Omm",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":30,"analysis":33},1144531,"关于墙钢筋绑扎的说法，正确的是（ ）。",[303,305,307,309],{"key":20,"text":304,"correct":22},"钢筋直径小于等于12mm时，墙垂直钢筋每段长度不宜超过6m",{"key":24,"text":306,"correct":22},"钢筋直径大于12mm时，墙垂直钢筋每段长度不宜超过8m",{"key":27,"text":308,"correct":22},"水平钢筋每段长度不宜超过1Om",{"key":30,"text":310,"correct":32},"采用双层钢筋网时，在两层钢筋间应设置撑铁或绑扎架",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":27,"analysis":33},1144532,"梁下部纵向受力钢筋接头位置宜设置在（ ）。",[315,317,319,321],{"key":20,"text":316,"correct":22},"梁跨中",{"key":24,"text":318,"correct":22},"梁支座",{"key":27,"text":320,"correct":32},"梁端1\u002F3跨度范围内",{"key":30,"text":322,"correct":22},"可随意设置",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":27,"analysis":33},1144533,"关于柱钢筋绑扎的说法，正确的是（ ）。",[327,329,331,333],{"key":20,"text":328,"correct":22},"框架梁、牛腿及柱帽等钢筋，应放在柱子纵向钢筋外侧",{"key":24,"text":330,"correct":22},"柱中的竖向钢筋搭接时，角部钢筋的弯钩应与模板呈60°",{"key":27,"text":332,"correct":32},"圆形柱竖向钢筋搭接时，角部钢筋的弯钩应与模板切线垂直",{"key":30,"text":334,"correct":22},"柱中的竖向钢筋搭接时，中间钢筋的弯钩应与模板呈45°",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":27,"analysis":33},1144534,"按相关规范规定，建筑水泥的存放期通常为（ ）个月。",[339,341,343,344],{"key":20,"text":340,"correct":22},"1",{"key":24,"text":342,"correct":22},"2",{"key":27,"text":230,"correct":32},{"key":30,"text":236,"correct":22},{"id":346,"libraryId":5,"type":70,"typeLabel":71,"stem":347,"options":348,"answer":206,"analysis":33},1144535,"能够改善混凝土拌合物流动性能的外加剂包括（ ）等。",[349,351,353,355,357],{"key":20,"text":350,"correct":32},"减水剂",{"key":24,"text":352,"correct":22},"早强剂",{"key":27,"text":354,"correct":22},"防水剂",{"key":30,"text":356,"correct":32},"引气剂",{"key":83,"text":358,"correct":32},"泵送剂",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":27,"analysis":33},1144536,"关于混凝土外加剂主要功能的说法，正确的是（ ）。",[363,365,367,369],{"key":20,"text":364,"correct":22},"减水剂可以调节混凝土凝结时间、硬化性能",{"key":24,"text":366,"correct":22},"缓凝剂、早强剂可以改善混凝土拌合物流动性能",{"key":27,"text":368,"correct":32},"引气剂、防水剂可以改善混凝土耐久性",{"key":30,"text":370,"correct":22},"速凝剂、防冻剂可以调节混凝土凝结时间、硬化性能",{"id":372,"libraryId":5,"type":70,"typeLabel":71,"stem":373,"options":374,"answer":385,"analysis":33},1144537,"关于泵送混凝土配合比设计要求的说法，正确的是（ ）。",[375,377,379,381,383],{"key":20,"text":376,"correct":32},"泵送混凝土的入泵坍落度不宜低于100mm",{"key":24,"text":378,"correct":22},"粗骨料针片状颗粒不宜大于11%",{"key":27,"text":380,"correct":22},"用水量与胶凝材料总量之比不宜大于0.7",{"key":30,"text":382,"correct":22},"泵送混凝土的胶凝材料总量不宜小于200kg\u002Fm3",{"key":83,"text":384,"correct":32},"泵送混凝土宜掺用适量粉煤灰或其他活性矿物掺合料","AE",{"id":387,"libraryId":5,"type":70,"typeLabel":71,"stem":388,"options":389,"answer":206,"analysis":33},1144538,"关于泵送混凝土的说法，正确的有（ ）。",[390,392,394,396,398],{"key":20,"text":391,"correct":32},"混凝土泵可以将混凝土一次输送到浇筑地点",{"key":24,"text":393,"correct":22},"混凝土泵车可随意设置",{"key":27,"text":395,"correct":22},"泵送混凝土配合比设计与普通混凝土相同",{"key":30,"text":397,"correct":32},"混凝土泵送应尽量连续工作",{"key":83,"text":399,"correct":32},"混凝土泵送输送管宜直，转弯宜缓",{"id":401,"libraryId":5,"type":70,"typeLabel":71,"stem":402,"options":403,"answer":414,"analysis":33},1144539,"施工缝的位置应在混凝土浇筑之前确定，对于施工缝处施工要求，下列描述正确的是（ ）。",[404,406,408,410,412],{"key":20,"text":405,"correct":32},"施工缝的位置应在混凝土浇筑之前确定，并宜留置在结构受剪力较小且便于施工的部位",{"key":24,"text":407,"correct":32},"施工缝处混凝土，要待已浇筑的混凝土抗压强度等级达到不小于1.2N\u002Fmm2，才能继续浇筑",{"key":27,"text":409,"correct":32},"与板连成整体的大截面梁，施工缝宜留在板底面以下20～30mm处",{"key":30,"text":411,"correct":22},"单向板施工缝留在平行于长边的任何位置",{"key":83,"text":413,"correct":22},"有主次梁的楼板，宜顺着次梁浇筑，施工缝留置在次梁跨中的2\u002F3处","ABC",{"id":416,"libraryId":5,"type":70,"typeLabel":71,"stem":417,"options":418,"answer":85,"analysis":33},1144540,"关于混凝土施工缝继续浇筑技术要求的说法，正确的有（ ）。",[419,421,423,425,427],{"key":20,"text":420,"correct":22},"已浇筑的混凝土，其抗压强度不应小于1.0N\u002Fm㎡,方可处理",{"key":24,"text":422,"correct":32},"清除已硬化的混凝土表面水泥薄膜和松动石子以及软弱混凝土层",{"key":27,"text":424,"correct":32},"充分湿润和冲洗干净已硬化的混凝土表面，且不得积水",{"key":30,"text":426,"correct":32},"浇筑混凝土前，宜先在施工缝处刷一层水泥浆（可掺适量界面剂）或铺一层与混凝土内成分相同的水泥砂浆",{"key":83,"text":428,"correct":32},"混凝土应细致捣实，使新旧混凝土紧密结合",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":27,"analysis":33},1144541,"关于主体结构混凝土浇筑的说法，正确的是（ ）。",[433,435,437,439],{"key":20,"text":434,"correct":22},"混凝土自高处倾落的自由高度，不宜超过3m",{"key":24,"text":436,"correct":22},"浇筑高度超过1m时，应采用串筒、溜槽、溜管或振动溜管",{"key":27,"text":438,"correct":32},"浇筑与柱和墙连成整体的梁和板时，应在柱和墙浇筑完毕后停歇1～1.5h，再继续浇筑",{"key":30,"text":440,"correct":22},"浇筑竖向结构混凝土前，应先在底部填以100～200mm厚与混凝土成分相同的水泥砂浆",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":20,"analysis":33},1144542,"关于主体结构梁、板混凝土浇筑顺序的说法，正确的是（ ）。",[445,447,449,451],{"key":20,"text":446,"correct":32},"宜同时浇筑混凝土",{"key":24,"text":448,"correct":22},"有主次梁的楼板宜顺着主梁方向浇筑",{"key":27,"text":450,"correct":22},"单向板宜沿着板的短边方向浇筑",{"key":30,"text":452,"correct":22},"拱和高度大于0.6m时梁可单独浇筑混凝土",{"id":454,"libraryId":5,"type":70,"typeLabel":71,"stem":455,"options":456,"answer":466,"analysis":33},1144543,"关于梁和板同时浇筑混凝土时施工技术的说法，正确的有（ ）。",[457,459,461,463,465],{"key":20,"text":458,"correct":32},"有主次梁的楼板宜顺着次梁方向浇筑",{"key":24,"text":460,"correct":32},"单向板宜沿着板的长边方向浇筑",{"key":27,"text":462,"correct":22},"高度0.6m的拱不可单独浇筑混凝土",{"key":30,"text":464,"correct":32},"高度大于1m时的梁可单独浇筑混凝土",{"key":83,"text":450,"correct":22},"ABD",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":30,"analysis":33},1144544,"某工程柱混凝土采用细石子（最大粒径20mm），当无其他可靠措施保证混凝土不产生离析时，混凝土的最大自由倾落高度为（ ）m。",[471,472,473,474],{"key":20,"text":342,"correct":22},{"key":24,"text":230,"correct":22},{"key":27,"text":232,"correct":22},{"key":30,"text":236,"correct":32},{"id":476,"libraryId":5,"type":70,"typeLabel":71,"stem":477,"options":478,"answer":489,"analysis":33},1144545,"关于振捣器振捣施工技术的说法，正确的有（ ）。",[479,481,483,485,487],{"key":20,"text":480,"correct":22},"插入式振捣器振捣普通混凝土时，应快拔慢插",{"key":24,"text":482,"correct":22},"插入式振捣器移动间距不宜大于振捣器作用半径的2.0倍",{"key":27,"text":484,"correct":32},"插入式振捣器与模板的距离不应大于其作用半径的0.5倍",{"key":30,"text":486,"correct":32},"插入式振捣器插入下层混凝土内的深度应不小于50mm",{"key":83,"text":488,"correct":32},"采用表面平板振动器时，其移动间距应保证捣动器的平板能覆盖已振实部分的边缘","CDE",{"id":491,"libraryId":5,"type":70,"typeLabel":71,"stem":492,"options":493,"answer":504,"analysis":33},1144546,"关于施工缝留置位置的说法，正确的有（ ）。",[494,496,498,500,502],{"key":20,"text":495,"correct":32},"柱留置在基础、楼板、梁的顶面，梁和吊车梁牛腿、无梁楼板柱帽的下面",{"key":24,"text":497,"correct":22},"与板连成整体的大截面梁（高超过1m），宜留置在板底面以下50～70mm处",{"key":27,"text":499,"correct":32},"有主次梁的楼板，施工缝应留置在次梁跨中1\u002F3范围内",{"key":30,"text":501,"correct":32},"墙留置在门洞口过梁跨中1\u002F3范围内，也可留在纵横墙的交接处",{"key":83,"text":503,"correct":32},"单向板留置在平行于板的短边的任何位置","ACDE",{"id":506,"libraryId":5,"type":70,"typeLabel":71,"stem":507,"options":508,"answer":206,"analysis":33},1144547,"关于混凝土施工缝的留置位置的做法，正确的是（ ）。",[509,511,513,515,517],{"key":20,"text":510,"correct":32},"柱的施工缝留置在基础的顶面",{"key":24,"text":512,"correct":22},"单向板的施工缝留置在平行于板的长边的任何位置",{"key":27,"text":514,"correct":22},"有主次梁的楼板，施工缝留置在主梁跨中1\u002F3范围内",{"key":30,"text":516,"correct":32},"墙体留置在门洞口过梁跨中1\u002F3范围内",{"key":83,"text":518,"correct":32},"墙体留置在纵横墙的交接处",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":20,"analysis":33},1144548,"混凝土浇筑时如果没有可靠措施保证混凝土不产生离析，自由倾落高度应符合（ ）的规定。",[523,525,527,529],{"key":20,"text":524,"correct":32},"粗骨料料径大于25mm时，不宜超过3m",{"key":24,"text":526,"correct":22},"粗骨料料径不大于25mm时，不宜超过4m",{"key":27,"text":528,"correct":22},"粗骨料料径大于25mm时，不宜超过6m",{"key":30,"text":530,"correct":22},"粗骨料料径不大于25mm时，不宜超过3m",{"id":532,"libraryId":5,"type":70,"typeLabel":71,"stem":533,"options":534,"answer":545,"analysis":33},1144549,"某现浇钢筋混凝土楼盖，主梁跨度为8.4m，次梁跨度为4.5m，次梁轴线间距为4.2m，施工缝宜留置在（ ）的位置。",[535,537,539,541,543],{"key":20,"text":536,"correct":22},"距主梁轴线1m，且平行于主梁轴线",{"key":24,"text":538,"correct":32},"距主梁轴线1.8m，且平行于主梁轴线",{"key":27,"text":540,"correct":32},"距主梁轴线2m，且平行于主梁轴线",{"key":30,"text":542,"correct":22},"距次梁轴线2m，且平行于次梁轴线",{"key":83,"text":544,"correct":22},"距次梁轴线1m，且平行于次梁轴线","BC",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":27,"analysis":33},1144550,"混凝土施工缝宜留在结构受（ ）较小且便于施工的部位。",[550,552,554,556],{"key":20,"text":551,"correct":22},"荷载",{"key":24,"text":553,"correct":22},"弯矩",{"key":27,"text":555,"correct":32},"剪力",{"key":30,"text":557,"correct":22},"压力",{"id":559,"libraryId":5,"type":70,"typeLabel":71,"stem":560,"options":561,"answer":572,"analysis":33},1144551,"关于浇筑混凝土时留设施工缝的说法，正确的有（ ）。",[562,564,566,568,570],{"key":20,"text":563,"correct":32},"有主次梁的横板，施工缝应留在次梁跨中1\u002F3范围内",{"key":24,"text":565,"correct":32},"柱应留水平缝，梁板应设垂直缝",{"key":27,"text":567,"correct":22},"单向板的施工缝应留在平行于板的长边的任意位置",{"key":30,"text":569,"correct":22},"墙的施工缝应留置在门洞口过梁跨中1\u002F3范围以外处",{"key":83,"text":571,"correct":22},"柱的施工缝宜留在基础的顶面、吊车梁的上面、无梁楼板柱帽的下面","AB",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":20,"analysis":33},1144552,"关于单向板施工缝留置位置的说法，正确的是（ ）。",[577,579,581,583],{"key":20,"text":578,"correct":32},"留置在平行于板的短边的任何位置",{"key":24,"text":580,"correct":22},"有主次梁的楼板，留置在主梁跨中1\u002F3范围内",{"key":27,"text":582,"correct":22},"留置在门洞口过梁跨边1\u002F3范围内",{"key":30,"text":584,"correct":22},"留置墙中",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":20,"analysis":33},1144553,"关于施工缝留置位置的说法，正确的是（ ）。",[589,591,593,595],{"key":20,"text":590,"correct":32},"柱留置在基础、楼板、梁的顶面",{"key":24,"text":592,"correct":22},"梁和吊车梁牛腿、无梁楼板柱帽的上面",{"key":27,"text":594,"correct":22},"有主次梁的楼板，施工缝应留置在次梁跨中1\u002F2范围内",{"key":30,"text":596,"correct":22},"墙留置在门洞口过梁跨中1\u002F2范围内，也可留在纵横墙的交接处",{"id":598,"libraryId":5,"type":70,"typeLabel":71,"stem":599,"options":600,"answer":85,"analysis":33},1144554,"施工缝的位置应在混凝土浇筑之前确定，下列做法正确的是（ ）。",[601,603,605,606,608],{"key":20,"text":602,"correct":22},"有主次梁的楼板，施工缝应留置在主梁跨中500mm范围内",{"key":24,"text":604,"correct":32},"和板连成整体的大截面梁，留置在板底以下20～30mm处",{"key":27,"text":503,"correct":32},{"key":30,"text":607,"correct":32},"无梁楼板柱的施工缝宜留置在柱帽的下面",{"key":83,"text":609,"correct":32},"墙的留置在门洞口过梁跨中1\u002F3范围内",{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":30,"analysis":33},1144555,"在浇筑有主次梁结构的钢筋混凝土楼板时，若要留设施工缝，则施工缝应留在（ ）1\u002F3跨度范围内。",[614,616,618,620],{"key":20,"text":615,"correct":22},"主梁两端",{"key":24,"text":617,"correct":22},"主梁跨中",{"key":27,"text":619,"correct":22},"次梁两端",{"key":30,"text":621,"correct":32},"次梁跨中",{"id":623,"libraryId":5,"type":15,"typeLabel":16,"stem":624,"options":625,"answer":24,"analysis":33},1144556,"混凝土浇筑中，在浇筑与柱和墙连成整体的梁和板时，应在柱和墙浇筑完毕后间歇（ ）h再继续浇筑。",[626,628,630,632],{"key":20,"text":627,"correct":22},"0.5～1.0",{"key":24,"text":629,"correct":32},"1.0~1.5",{"key":27,"text":631,"correct":22},"1.5～2.0",{"key":30,"text":633,"correct":22},"2.0～2.5",{"id":635,"libraryId":5,"type":15,"typeLabel":16,"stem":636,"options":637,"answer":24,"analysis":33},1144557,"关于施工缝处继续浇筑混凝土的说法，正确的是（ ）。",[638,640,642,644],{"key":20,"text":639,"correct":22},"已浇筑的混凝土，其抗压强度不应小于1.ON\u002Fmm2",{"key":24,"text":641,"correct":32},"清除硬化混凝土表面水泥薄膜和松动石子以及软弱混凝土层",{"key":27,"text":643,"correct":22},"硬化混凝土表面干燥",{"key":30,"text":645,"correct":22},"浇筑混凝土前，宜先在施工缝铺一层1:3水泥砂浆",{"id":647,"libraryId":5,"type":15,"typeLabel":16,"stem":648,"options":649,"answer":24,"analysis":33},1144558,"当采用插入式振捣器振捣混凝土时，振捣器插入下层混凝土内的深度应不小于（ ）。",[650,652,654,656],{"key":20,"text":651,"correct":22},"30mm",{"key":24,"text":653,"correct":32},"50mm",{"key":27,"text":655,"correct":22},"80mm",{"key":30,"text":657,"correct":22},"100mm",[659,662,665,668,671,674],{"id":15,"name":660,"category":7,"favorite":661},"领导干部任职前廉政法规知识测试题",92,{"id":663,"name":664,"category":7,"favorite":15},595,"建筑结构与设备",{"id":666,"name":667,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":669,"name":670,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":672,"name":673,"category":7,"favorite":8},534,"BIM工程师",{"id":675,"name":673,"category":7,"favorite":8},535]