[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-800-22":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":653},{"id":5,"name":6,"category":7,"favorite":8},800,"一建建筑工程实务","建筑工程",0,22,50,2362,[13,38,52,64,76,91,103,118,133,148,160,172,186,197,209,221,233,245,259,270,280,294,306,320,332,344,356,370,382,394,408,420,428,439,451,465,477,491,506,518,530,541,552,564,576,588,600,615,624,639],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1144455,2,"多选题","某大型商住楼大体积混凝土基础底板浇筑过程中，为了防止出现裂缝，可采取的措施有（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","优先选用低水化热的矿渣水泥拌制混凝土",true,{"key":24,"text":25,"correct":26},"B","适当提高水灰比，提高水泥用量",false,{"key":28,"text":29,"correct":22},"C","适当降低混凝土的入模温度，控制混凝土的内外温差",{"key":31,"text":32,"correct":22},"D","预埋冷却水管进行人工导热",{"key":34,"text":35,"correct":22},"E","及时对混凝土覆盖保温、保湿材料","ACDE","",{"id":39,"libraryId":5,"type":40,"typeLabel":41,"stem":42,"options":43,"answer":31,"analysis":37},1144456,1,"单选题","大体积混凝土养护期间必须混凝土温控指标加以控制，下列各项指标描述不正确的是（ ）。",[44,46,48,50],{"key":20,"text":45,"correct":26},"混凝土浇筑体在入模温度基础上的温升值不宜大于50℃",{"key":24,"text":47,"correct":26},"混凝土浇筑体表面以内40～100mm位置处的温度与混凝土浇筑体表面温度差值不宜大于25℃",{"key":28,"text":49,"correct":26},"混凝土浇筑体的降温速率不宜大于2.0℃\u002Fd",{"key":31,"text":51,"correct":22},"混凝土浇筑体表面与大气温差不宜大于20℃",{"id":53,"libraryId":5,"type":40,"typeLabel":41,"stem":54,"options":55,"answer":31,"analysis":37},1144457,"关于大体积混凝土温控指标的说法，正确的是（ ）。",[56,58,60,62],{"key":20,"text":57,"correct":26},"混凝土浇筑体在入模温度基础上的温升值不宜大于60℃",{"key":24,"text":59,"correct":26},"混凝土浇筑块体的里表温差（不含混凝土收缩的当量温度）不宜大于30℃",{"key":28,"text":61,"correct":26},"混凝土浇筑体的降温速率不宜大于3.0℃\u002Fd",{"key":31,"text":63,"correct":22},"混凝土浇筑体表面与大气温差不应大于20℃",{"id":65,"libraryId":5,"type":40,"typeLabel":41,"stem":66,"options":67,"answer":31,"analysis":37},1144458,"大体积混凝土工程施工时，其混凝土浇筑体在入模温度基础上的温升值不宜大于（ ）℃。",[68,70,72,74],{"key":20,"text":69,"correct":26},"20",{"key":24,"text":71,"correct":26},"25",{"key":28,"text":73,"correct":26},"40",{"key":31,"text":75,"correct":22},"50",{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":90,"analysis":37},1144459,"关于大体积混凝土施工的措施，正确的有（ ）。",[80,82,84,86,88],{"key":20,"text":81,"correct":22},"掺入一定量的缓凝减水剂",{"key":24,"text":83,"correct":22},"掺入适量微膨胀剂",{"key":28,"text":85,"correct":26},"尽量增加水泥用量",{"key":31,"text":87,"correct":26},"选用硅酸盐水泥",{"key":34,"text":89,"correct":22},"采用人工降温措施，降低混凝土的入模温度","ABE",{"id":92,"libraryId":5,"type":40,"typeLabel":41,"stem":93,"options":94,"answer":20,"analysis":37},1144460,"关于单独台阶式混凝土基础浇筑的说法，正确的是（ ）。",[95,97,99,101],{"key":20,"text":96,"correct":22},"每层混凝土要一次浇筑，顺序是先边角后中间",{"key":24,"text":98,"correct":26},"每层混凝土要一次浇筑，顺序是后边角先中间",{"key":28,"text":100,"correct":26},"每层混凝土要分次浇筑，顺序是先边角后中间",{"key":31,"text":102,"correct":26},"每层混凝土要分次浇筑，顺序是后边角先中间",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":117,"analysis":37},1144461,"关于混凝土浇筑说法正确的有（ ）。",[107,109,111,113,115],{"key":20,"text":108,"correct":26},"台阶式基础施工每层混凝土要一次浇筑，顺序是先中间后边角",{"key":24,"text":110,"correct":22},"浇筑混凝土前，对地基应事先按设计标高和轴线进行校正，并应清除淤泥和杂物",{"key":28,"text":112,"correct":22},"注意基坑降排水，以防冲刷新浇筑的混凝土",{"key":31,"text":114,"correct":22},"垫层混凝土应在基础验槽后立即浇筑",{"key":34,"text":116,"correct":26},"混凝土强度达到50%后方可进行后续施工","BCD",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":132,"analysis":37},1144463,"关于条形混凝土基础浇筑技术的说法，正确的有（ ）。",[122,124,126,128,130],{"key":20,"text":123,"correct":22},"浇筑前，应根据混凝土基础顶面的标高在两侧木模上弹出标高线",{"key":24,"text":125,"correct":22},"根据基础深度宜分段分层连续浇筑混凝土，一般不留施工缝",{"key":28,"text":127,"correct":22},"各段层间应相互衔接，每段间浇筑长度控制在2～3m距离",{"key":31,"text":129,"correct":22},"逐段逐层呈阶梯形向前推进",{"key":34,"text":131,"correct":26},"采用原槽土模时，在基槽两侧的土壁上交错打入长50mm左右的标杆，并露出20～30mm","ABCD",{"id":134,"libraryId":5,"type":15,"typeLabel":16,"stem":135,"options":136,"answer":147,"analysis":37},1144464,"关于筏板基础施工要点和要求，下列说法中正确的有（ ）。",[137,139,141,143,145],{"key":20,"text":138,"correct":22},"施工前如地下水位较高应人工降水",{"key":24,"text":140,"correct":22},"混凝土浇筑时一般不留施工缝",{"key":28,"text":142,"correct":26},"混凝土浇筑完毕，表面应覆盖和洒水养护不少于7d",{"key":31,"text":144,"correct":22},"当混凝土强度完全达到设计强度时，进行基坑回填",{"key":34,"text":146,"correct":22},"筏板基础底板与梁可同时施工","ABDE",{"id":149,"libraryId":5,"type":40,"typeLabel":41,"stem":150,"options":151,"answer":20,"analysis":37},1144465,"关于水泥土搅拌施工，说法正确的是（ ）。",[152,154,156,158],{"key":20,"text":153,"correct":22},"水泥土搅拌法适用于处理正常固结的淤泥与淤泥质土、粉土、饱和黄土、素填土、黏性土以及无流动地下水的饱和松散砂土等地基",{"key":24,"text":155,"correct":26},"当地基土的天然含水量小于3%（黄土含水量小于25%）、大于70%或地下水的pH值小于4时不宜采用湿法施工",{"key":28,"text":157,"correct":26},"水泥土搅拌桩施工前应根据设计进行工艺性试桩，数量不得多于3根",{"key":31,"text":159,"correct":26},"竖向承载搅拌桩施工时，停浆（灰）面应高于桩顶设计标高100～300mm",{"id":161,"libraryId":5,"type":40,"typeLabel":41,"stem":162,"options":163,"answer":20,"analysis":37},1144466,"关于静力压桩法施工的说法，正确的是（ ）。",[164,166,168,170],{"key":20,"text":165,"correct":22},"施工前进行试压粧，数量不少于3根。",{"key":24,"text":167,"correct":26},"采用静压粧的基坑，可边挖桩边开挖基坑",{"key":28,"text":169,"correct":26},"送桩深度大于4m送桩器应专门设计",{"key":31,"text":171,"correct":26},"静压桩应以压力为主，标高为辅",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":147,"analysis":37},1144467,"关于钢筋混凝土预制桩锤击沉桩顺序的表述，说法正确的有（ ）。",[176,178,180,182,184],{"key":20,"text":177,"correct":22},"对于密集桩群，从中间开始分头向四周或两边对称施打",{"key":24,"text":179,"correct":22},"当一侧毗邻建筑物时，由毗邻建筑物处向另一方向施打",{"key":28,"text":181,"correct":26},"对基础标高不一的桩，宜先浅后深",{"key":31,"text":183,"correct":22},"对不同规格的桩，宜先大后小、先长后短",{"key":34,"text":185,"correct":22},"当基坑不大时，打桩可从中间开始分头向两边进行",{"id":187,"libraryId":5,"type":40,"typeLabel":41,"stem":188,"options":189,"answer":24,"analysis":37},1144468,"关于钢筋混凝土预制桩沉桩顺序的说法，正确的是（ ）。",[190,192,194,195],{"key":20,"text":191,"correct":26},"对于密集桩群，从四周开始向中间施打",{"key":24,"text":193,"correct":22},"一侧毗邻建筑物时，由毗邻建筑物处向另一方向施打",{"key":28,"text":181,"correct":26},{"key":31,"text":196,"correct":26},"对不同规格的桩，宜先小后大、先短后长",{"id":198,"libraryId":5,"type":40,"typeLabel":41,"stem":199,"options":200,"answer":24,"analysis":37},1144469,"钢筋混凝土预制桩采用锤击沉桩法施工时，其施工工序包括：①打桩机就位；②确定桩位和沉桩顺序；③吊桩喂桩；④校正；⑤锤击沉桩。通常的施工顺序为（ ）。",[201,203,205,207],{"key":20,"text":202,"correct":26},"①②③④⑤",{"key":24,"text":204,"correct":22},"②①③④⑤",{"key":28,"text":206,"correct":26},"①②③⑤④",{"key":31,"text":208,"correct":26},"②①③⑤④",{"id":210,"libraryId":5,"type":40,"typeLabel":41,"stem":211,"options":212,"answer":28,"analysis":37},1144470,"钢筋混凝土预制桩基础施工中，校正紧后工作是（ ）。",[213,215,217,219],{"key":20,"text":214,"correct":26},"吊桩喂桩",{"key":24,"text":216,"correct":26},"桩机就位",{"key":28,"text":218,"correct":22},"锤击沉桩接桩",{"key":31,"text":220,"correct":26},"送桩",{"id":222,"libraryId":5,"type":40,"typeLabel":41,"stem":223,"options":224,"answer":31,"analysis":37},1144471,"下列哪些不属于钢筋混凝土预制桩的接桩方法（ ）。",[225,227,229,231],{"key":20,"text":226,"correct":26},"焊接法",{"key":24,"text":228,"correct":26},"螺纹接头",{"key":28,"text":230,"correct":26},"机械啮合接头法",{"key":31,"text":232,"correct":22},"高一级别混凝土锚接",{"id":234,"libraryId":5,"type":40,"typeLabel":41,"stem":235,"options":236,"answer":24,"analysis":37},1144472,"采用静力压桩法施工时，稳压压桩力不应小于终压力，稳压时间宜为（ ）s",[237,239,241,243],{"key":20,"text":238,"correct":26},"1~5",{"key":24,"text":240,"correct":22},"5~10",{"key":28,"text":242,"correct":26},"10~15",{"key":31,"text":244,"correct":26},"15~20",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":117,"analysis":37},1144473,"人工挖孔灌注桩是用于大孔径桩的一种方法，施工时必须考虑护壁防塌，其护壁方法有（ ）。",[249,251,253,255,257],{"key":20,"text":250,"correct":26},"放坡",{"key":24,"text":252,"correct":22},"喷射混凝土护壁",{"key":28,"text":254,"correct":22},"砖砌体护壁",{"key":31,"text":256,"correct":22},"现浇混凝土护壁",{"key":34,"text":258,"correct":26},"型钢土钉护壁",{"id":260,"libraryId":5,"type":40,"typeLabel":41,"stem":261,"options":262,"answer":20,"analysis":37},1144474,"人工挖孔灌注桩施工中，应用较广的护壁方法是（ ）。",[263,265,266,268],{"key":20,"text":264,"correct":22},"混凝土护壁",{"key":24,"text":254,"correct":26},{"key":28,"text":267,"correct":26},"沉井护壁",{"key":31,"text":269,"correct":26},"钢套管护壁",{"id":271,"libraryId":5,"type":40,"typeLabel":41,"stem":272,"options":273,"answer":31,"analysis":37},1144475,"高层建筑筏形基础和箱形基础长度超过（ ）m时，宜设置贯通的后浇施工缝（后浇带），后浇带宽不宜小于80cm，在后浇施工缝处，钢筋必须贯通。",[274,276,277,279],{"key":20,"text":275,"correct":26},"10",{"key":24,"text":69,"correct":26},{"key":28,"text":278,"correct":26},"30",{"key":31,"text":73,"correct":22},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":132,"analysis":37},1144476,"关于混凝土基础的主要形式的说法，正确的有（ ）。",[284,286,288,290,292],{"key":20,"text":285,"correct":22},"条形基础",{"key":24,"text":287,"correct":22},"独立基础",{"key":28,"text":289,"correct":22},"筏形基础",{"key":31,"text":291,"correct":22},"箱形基础",{"key":34,"text":293,"correct":26},"球形基础",{"id":295,"libraryId":5,"type":40,"typeLabel":41,"stem":296,"options":297,"answer":24,"analysis":37},1144477,"关于高层建筑筏形基础和箱形基础后浇带宽度最小值的说法，正确的是（ ）mm。",[298,300,302,304],{"key":20,"text":299,"correct":26},"600",{"key":24,"text":301,"correct":22},"800",{"key":28,"text":303,"correct":26},"1000",{"key":31,"text":305,"correct":26},"1200",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":147,"analysis":37},1144478,"关于模板工程的说法，正确的有（ ）。",[310,312,314,316,318],{"key":20,"text":311,"correct":22},"模板安装位置、尺寸必须满足图纸要求，且应拼缝严密、表面平整并刷隔离剂",{"key":24,"text":313,"correct":22},"模板及其支撑拆除的顺序原则为：后支先拆、先支后拆",{"key":28,"text":315,"correct":26},"施工顺序为：放线→模板制作→模板安装、加固→模板清理、保养→模板验收→模板拆除",{"key":31,"text":317,"correct":22},"模板及其支撑应具有足够的承载能力、刚度和稳定性，可靠地承受浇筑混凝土的重量、侧压力以及施工荷载",{"key":34,"text":319,"correct":22},"在浇筑混凝土之前，应对模板工程进行验收。模板安装和浇筑混凝土时，应对模板及其支撑进行观察和维护",{"id":321,"libraryId":5,"type":40,"typeLabel":41,"stem":322,"options":323,"answer":24,"analysis":37},1144480,"混凝土基础采用双层钢筋网时，上层钢筋网的弯钩应（ ）。",[324,326,328,330],{"key":20,"text":325,"correct":26},"朝上",{"key":24,"text":327,"correct":22},"朝下",{"key":28,"text":329,"correct":26},"朝向一侧",{"key":31,"text":331,"correct":26},"随意放置",{"id":333,"libraryId":5,"type":40,"typeLabel":41,"stem":334,"options":335,"answer":20,"analysis":37},1144481,"关于钢筋工程施工工艺的说法，正确的是（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":22},"钢筋放样→钢筋制作→钢筋半成品运输→基础垫层→弹钢筋定位线→钢筋绑扎→钢筋验收、隐蔽",{"key":24,"text":339,"correct":26},"钢筋制作→钢筋放样→钢筋半成品运输→基础垫层→弹钢筋定位线→钢筋绑扎→钢筋验收、隐蔽",{"key":28,"text":341,"correct":26},"钢筋放样→钢筋半成品运输→钢筋制作→基础垫层→弹钢筋定位线→钢筋绑扎→钢筋验收、隐蔽",{"key":31,"text":343,"correct":26},"钢筋半成品运输→钢筋放样→钢筋制作→基础垫层→弹钢筋定位线→钢筋绑扎→钢筋验收、隐蔽",{"id":345,"libraryId":5,"type":40,"typeLabel":41,"stem":346,"options":347,"answer":20,"analysis":37},1144482,"同一纵向受力钢筋不宜设置两个或两个以上接头，接头末端至钢筋弯起点的距离不应小于钢筋直径的（ ）倍。",[348,350,352,354],{"key":20,"text":349,"correct":22},"10倍",{"key":24,"text":351,"correct":26},"13倍",{"key":28,"text":353,"correct":26},"14倍",{"key":31,"text":355,"correct":26},"15倍",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":117,"analysis":37},1144483,"砖砌体“三一”砌筑法的具体含义是指（ ）。",[360,362,364,366,368],{"key":20,"text":361,"correct":26},"一个人",{"key":24,"text":363,"correct":22},"一铲灰",{"key":28,"text":365,"correct":22},"一块砖",{"key":31,"text":367,"correct":22},"一挤揉",{"key":34,"text":369,"correct":26},"一勾缝",{"id":371,"libraryId":5,"type":40,"typeLabel":41,"stem":372,"options":373,"answer":24,"analysis":37},1144484,"大体积混凝土保湿养护的持续时间不得少于（ ）d，应经常检查塑料薄膜或养护剂涂层的完整情况，保持混凝土表面湿润。",[374,376,378,380],{"key":20,"text":375,"correct":26},"7",{"key":24,"text":377,"correct":22},"14",{"key":28,"text":379,"correct":26},"21",{"key":31,"text":381,"correct":26},"28",{"id":383,"libraryId":5,"type":40,"typeLabel":41,"stem":384,"options":385,"answer":28,"analysis":37},1144486,"下列属于产生焊缝固体夹渣缺陷主要原因的是（）。2018真题",[386,388,390,392],{"key":20,"text":387,"correct":26},"焊缝布置不当",{"key":24,"text":389,"correct":26},"焊前未预热",{"key":28,"text":391,"correct":22},"焊接电流太小",{"key":31,"text":393,"correct":26},"焊条未烘烤",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":132,"analysis":37},1144487,"关于现浇混凝土结构特点的说法，正确的有（ ）。",[398,400,402,404,406],{"key":20,"text":399,"correct":22},"强度较高",{"key":24,"text":401,"correct":22},"可模性好",{"key":28,"text":403,"correct":22},"延性好",{"key":31,"text":405,"correct":22},"抗裂性差",{"key":34,"text":407,"correct":26},"耐久性差",{"id":409,"libraryId":5,"type":40,"typeLabel":41,"stem":410,"options":411,"answer":24,"analysis":37},1144488,"具有模板整体性好、抗震性强、无拼缝等优点的模板是（ ）。",[412,414,416,418],{"key":20,"text":413,"correct":26},"木模板",{"key":24,"text":415,"correct":22},"大模板",{"key":28,"text":417,"correct":26},"组合钢模板",{"key":31,"text":419,"correct":26},"压型钢板模板",{"id":421,"libraryId":5,"type":40,"typeLabel":41,"stem":422,"options":423,"answer":24,"analysis":37},1144489,"常见工具式现浇墙、壁结构施工模板是（ ）。",[424,425,426,427],{"key":20,"text":413,"correct":26},{"key":24,"text":415,"correct":22},{"key":28,"text":417,"correct":26},{"key":31,"text":419,"correct":26},{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":438,"analysis":37},1144490,"关于混凝土结构优点的说法，正确的有（ ）。",[432,433,434,436,437],{"key":20,"text":399,"correct":22},{"key":24,"text":401,"correct":22},{"key":28,"text":435,"correct":26},"延性差",{"key":31,"text":405,"correct":26},{"key":34,"text":407,"correct":26},"AB",{"id":440,"libraryId":5,"type":40,"typeLabel":41,"stem":441,"options":442,"answer":20,"analysis":37},1144491,"关于模板工程设计主要原则的说法，正确的是（ ）。",[443,445,447,449],{"key":20,"text":444,"correct":22},"实用性、安全性、经济性",{"key":24,"text":446,"correct":26},"适用性、安全性、经济性",{"key":28,"text":448,"correct":26},"耐久性、安全性、经济性",{"key":31,"text":450,"correct":26},"实用性、安全性、耐久性",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":132,"analysis":37},1144492,"在基础混凝土浇灌前应先进行（ ）工作。",[455,457,459,461,463],{"key":20,"text":456,"correct":22},"木模板应浇水润湿，但模板内不应有积水",{"key":24,"text":458,"correct":22},"清理模板",{"key":28,"text":460,"correct":22},"进行模板验收",{"key":31,"text":462,"correct":22},"钢筋的隐蔽工程验收",{"key":34,"text":464,"correct":26},"铺干水泥",{"id":466,"libraryId":5,"type":40,"typeLabel":41,"stem":467,"options":468,"answer":31,"analysis":37},1144493,"某悬挑长度为1.2m，混凝土强度为C30的现浇阳台板，拆除底模时混凝土强度至少应达到（ ）。",[469,471,473,475],{"key":20,"text":470,"correct":26},"15N\u002Fmm2",{"key":24,"text":472,"correct":26},"21N\u002Fmm2",{"key":28,"text":474,"correct":26},"22.5N\u002Fmm2",{"key":31,"text":476,"correct":22},"30N\u002Fmm2",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":117,"analysis":37},1144495,"关于模板工程，下列说法正确的有（ ）。",[481,483,485,487,489],{"key":20,"text":482,"correct":26},"对于跨度不小于8m的现浇钢筋混凝土梁，其模板应按设计要求起拱；当设计无具体要求时，起拱高度应为跨度的1\u002F1000～3\u002F1000",{"key":24,"text":484,"correct":22},"跨度不大于8m的拱壳底模及支架拆除时，其混凝土强度应达到设计的混凝土立方体抗压强度标准值的75%以上",{"key":28,"text":486,"correct":22},"不承重的梁、柱、墙侧模板，只要混凝土强度保证其表面、棱角不因拆模而受损，即可拆除",{"key":31,"text":488,"correct":22},"一般墙体大模板在常温条件下混凝土强度达到1N／mm2即可拆除",{"key":34,"text":490,"correct":26},"模板拆除时，一般按后支先拆、先支后拆，先拆承重部分，再拆非承重部分",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":505,"analysis":37},1144496,"关于模板工程安装要点的说法，正确的有（ ）。",[495,497,499,501,503],{"key":20,"text":496,"correct":22},"支架必须有足够的支承面积，底座必须有足够的承载力",{"key":24,"text":498,"correct":22},"在浇筑混凝土前，木模板应浇水润湿，但模板内不应有积水",{"key":28,"text":500,"correct":22},"模板的接缝不应漏浆",{"key":31,"text":502,"correct":26},"跨度不小于3m的现浇钢筋混凝土梁、板，其模板应按设计要求起拱",{"key":34,"text":504,"correct":22},"设计无要求时，6m的现浇钢筋混凝土梁起拱高度应为跨度的1\u002F1000～3\u002F1000","ABCE",{"id":507,"libraryId":5,"type":40,"typeLabel":41,"stem":508,"options":509,"answer":24,"analysis":37},1144497,"一般墙体大模板在常温条件下，混凝土强度最少要达到（ ）时即可拆模。",[510,512,514,516],{"key":20,"text":511,"correct":26},"0.5N\u002Fm㎡",{"key":24,"text":513,"correct":22},"1.0N\u002Fm㎡",{"key":28,"text":515,"correct":26},"1.5N\u002Fm㎡",{"key":31,"text":517,"correct":26},"2.0N\u002Fm㎡",{"id":519,"libraryId":5,"type":40,"typeLabel":41,"stem":520,"options":521,"answer":24,"analysis":37},1144498,"在常温条件下一般墙体大模板，拆除时混凝土强度最少要达到（ ）。",[522,524,526,528],{"key":20,"text":523,"correct":26},"0.5N\u002Fmm2",{"key":24,"text":525,"correct":22},"1.ON\u002Fmm2",{"key":28,"text":527,"correct":26},"1.5N\u002Fmm2",{"key":31,"text":529,"correct":26},"2.ON\u002Fmm2",{"id":531,"libraryId":5,"type":40,"typeLabel":41,"stem":532,"options":533,"answer":31,"analysis":37},1144499,"某现浇混凝土檐廊，挑出长度为1.5m，设计混凝土强度等级C30，拆模时混凝土强度最低限值是（ ）。",[534,536,537,539],{"key":20,"text":535,"correct":26},"15.0N\u002Fmm2",{"key":24,"text":474,"correct":26},{"key":28,"text":538,"correct":26},"27.0N\u002Fmm2",{"key":31,"text":540,"correct":22},"30.0N\u002Fmm2",{"id":542,"libraryId":5,"type":40,"typeLabel":41,"stem":543,"options":544,"answer":24,"analysis":37},1144500,"某现浇钢筋混凝土板跨度6m，设计无具体要求，底模及支架拆除时要求混凝土强度达到设计混凝土立方体抗压强度标准值的百分率（％）最小值是（ ）。",[545,546,548,550],{"key":20,"text":75,"correct":26},{"key":24,"text":547,"correct":22},"75",{"key":28,"text":549,"correct":26},"80",{"key":31,"text":551,"correct":26},"100",{"id":553,"libraryId":5,"type":40,"typeLabel":41,"stem":554,"options":555,"answer":28,"analysis":37},1144501,"某现浇钢筋混凝土梁板跨度为8m，其模板设计时，起拱高度宜为（ ）。",[556,558,560,562],{"key":20,"text":557,"correct":26},"4mm",{"key":24,"text":559,"correct":26},"6mm",{"key":28,"text":561,"correct":22},"16mm",{"key":31,"text":563,"correct":26},"25mm",{"id":565,"libraryId":5,"type":40,"typeLabel":41,"stem":566,"options":567,"answer":20,"analysis":37},1144502,"对跨度不小于4m的现浇钢筋混凝土梁、板，其模板应按设计要求起拱；当设计无具体要求时，起拱高度应为跨度的（ ）。",[568,570,572,574],{"key":20,"text":569,"correct":22},"1\u002F1000～3\u002F1000",{"key":24,"text":571,"correct":26},"1\u002F100～3\u002F100",{"key":28,"text":573,"correct":26},"3\u002F1000～5\u002F1000",{"key":31,"text":575,"correct":26},"3\u002F100～5\u002F100",{"id":577,"libraryId":5,"type":40,"typeLabel":41,"stem":578,"options":579,"answer":31,"analysis":37},1144503,"某混凝土梁的跨度为6.3m，采用木模板.钢支柱支模时，其跨中起拱高度可为（ ）。",[580,582,584,586],{"key":20,"text":581,"correct":26},"1mm",{"key":24,"text":583,"correct":26},"2mm",{"key":28,"text":585,"correct":26},"5mm",{"key":31,"text":587,"correct":22},"12mm",{"id":589,"libraryId":5,"type":40,"typeLabel":41,"stem":590,"options":591,"answer":24,"analysis":37},1144504,"某跨度为2m的板，设计混凝土强度等级为C20，其同条件养护的标准立方体试块的抗压强度标准值达到（ ）时即可拆除底模。",[592,594,596,598],{"key":20,"text":593,"correct":26},"5N\u002Fmm22",{"key":24,"text":595,"correct":22},"10N\u002Fmm2",{"key":28,"text":597,"correct":26},"15N\u002Fmm22",{"key":31,"text":599,"correct":26},"20N\u002Fmm2",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":614,"analysis":37},1144505,"混凝土强度必须达到设计的混凝土立方体抗压强度标准值的100%才能拆除底模及支架的混凝土构件有（ ）。",[604,606,608,610,612],{"key":20,"text":605,"correct":22},"悬臂构件",{"key":24,"text":607,"correct":26},"跨度小于等于8m板",{"key":28,"text":609,"correct":22},"跨度大于8m拱",{"key":31,"text":611,"correct":22},"跨度大于8m梁",{"key":34,"text":613,"correct":26},"跨度小于等于8m梁","ACD",{"id":616,"libraryId":5,"type":15,"typeLabel":16,"stem":617,"options":618,"answer":438,"analysis":37},1144506,"关于混凝土结构优点的说法，正确的有()。",[619,620,621,622,623],{"key":20,"text":399,"correct":22},{"key":24,"text":401,"correct":22},{"key":28,"text":435,"correct":26},{"key":31,"text":405,"correct":26},{"key":34,"text":407,"correct":26},{"id":625,"libraryId":5,"type":15,"typeLabel":16,"stem":626,"options":627,"answer":638,"analysis":37},1144507,"钢筋代换可采用等面积代换原则的情况有（ ）。",[628,630,632,634,636],{"key":20,"text":629,"correct":26},"构件配筋受强度控制时",{"key":24,"text":631,"correct":22},"构件按最小配筋率配筋的",{"key":28,"text":633,"correct":22},"同钢号钢筋之间代换的",{"key":31,"text":635,"correct":26},"构件受裂缝宽度控制的",{"key":34,"text":637,"correct":26},"构件配筋受材质限制的","BC",{"id":640,"libraryId":5,"type":15,"typeLabel":16,"stem":641,"options":642,"answer":132,"analysis":37},1144508,"关于钢筋代换的说法，正确的有（ ）。",[643,645,647,649,651],{"key":20,"text":644,"correct":22},"当构件配筋受强度控制时，按钢筋代换前后强度相等的原则代换",{"key":24,"text":646,"correct":22},"当构件按最小配筋率配筋时，按钢筋代换前后截面积相等的原则代换",{"key":28,"text":648,"correct":22},"钢筋代换时应征得设计单位的同意",{"key":31,"text":650,"correct":22},"当构件受裂缝宽度控制时，代换前后应进行裂缝宽度和挠度验算",{"key":34,"text":652,"correct":26},"同钢号之间的代换，按钢筋代换前后用钢量相等的原则代换",[654,657,660,663,666,669],{"id":40,"name":655,"category":7,"favorite":656},"领导干部任职前廉政法规知识测试题",92,{"id":658,"name":659,"category":7,"favorite":40},595,"建筑结构与设备",{"id":661,"name":662,"category":7,"favorite":40},715,"招标采购专业知识与法律法规",{"id":664,"name":665,"category":7,"favorite":40},848,"市政方向-通用基础",{"id":667,"name":668,"category":7,"favorite":8},534,"BIM工程师",{"id":670,"name":668,"category":7,"favorite":8},535]