[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-800-21":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":649},{"id":5,"name":6,"category":7,"favorite":8},800,"一建建筑工程实务","建筑工程",0,21,50,2362,[13,34,46,58,76,88,103,115,125,140,149,164,178,189,201,213,222,234,249,261,271,283,295,309,321,333,346,354,366,374,386,398,410,425,440,454,468,480,492,504,516,528,543,555,567,579,594,606,620,634],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1144402,1,"单选题","对基坑侧壁安全等级为一级的深基坑工程，宜采取的支护形式为（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","水泥土墙",false,{"key":24,"text":25,"correct":26},"B","地下连续墙",true,{"key":28,"text":29,"correct":22},"C","土钉墙",{"key":31,"text":32,"correct":22},"D","逆作拱墙","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1144403,"适用于一般黏性土、面积大、开挖深度应在5m以内的浅基坑支护是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"斜柱支撑",{"key":24,"text":41,"correct":22},"型钢桩横挡板支撑",{"key":28,"text":43,"correct":22},"临时挡土墙支撑",{"key":31,"text":45,"correct":26},"叠袋式挡墙支护",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1144405,"当基坑底为隔水层且层底作用有承压水时，应进行（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"基坑边坡加固",{"key":24,"text":53,"correct":22},"地基处理",{"key":28,"text":55,"correct":26},"坑底突涌验算",{"key":31,"text":57,"correct":22},"边坡失稳验算",{"id":59,"libraryId":5,"type":60,"typeLabel":61,"stem":62,"options":63,"answer":75,"analysis":33},1144406,2,"多选题","下列各项中，属轻型井点降水方法优点的有（ ）。",[64,66,68,70,72],{"key":20,"text":65,"correct":26},"机具简单、使用灵活",{"key":24,"text":67,"correct":26},"可防止流沙",{"key":28,"text":69,"correct":26},"提高边坡稳定",{"key":31,"text":71,"correct":22},"排水深度大",{"key":73,"text":74,"correct":26},"E","费用较低","ABCE",{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":20,"analysis":33},1144407,"具有机具简单、使用灵活、装拆方便、降水效果好、可防止流沙现象发生、提高边坡稳定、费用较低等优点的井点排水方法是（ ）。",[80,82,84,86],{"key":20,"text":81,"correct":26},"轻型井点",{"key":24,"text":83,"correct":22},"喷射井点",{"key":28,"text":85,"correct":22},"沉井井点",{"key":31,"text":87,"correct":22},"管井井点",{"id":89,"libraryId":5,"type":60,"typeLabel":61,"stem":90,"options":91,"answer":102,"analysis":33},1144408,"下列有关基础工程施工的说法中，正确的是（ ）。",[92,94,96,98,100],{"key":20,"text":93,"correct":26},"施工中地下水位应保持在基坑底面以下0.5~1.5m",{"key":24,"text":95,"correct":22},"对于密集沉桩桩群，应从四周开始往中间施工",{"key":28,"text":97,"correct":26},"垫层混凝土应在基础验槽后立即浇筑，混凝土强度达到70%后方可进行后续施工",{"key":31,"text":99,"correct":26},"验槽时，对于基底以下的土层不可见部位，要先辅以钎探配合共同完成",{"key":73,"text":101,"correct":26},"当基础下的持力层较软弱，常采用换土垫层法来处理","ACDE",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":28,"analysis":33},1144409,"在软土地区基坑开挖深度超过（ ）m，一般就要用井点降水。",[107,109,111,113],{"key":20,"text":108,"correct":22},"1",{"key":24,"text":110,"correct":22},"2",{"key":28,"text":112,"correct":26},"3",{"key":31,"text":114,"correct":22},"4",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":24,"analysis":33},1144410,"一较深基坑，基坑所处地区地下水位高于基坑底标高9m，渗透系数为1*10-7～2*10-4cm\u002Fs?，此基坑宜选用降水方案为（ ）。",[119,121,122,123],{"key":20,"text":120,"correct":22},"真空轻型井点",{"key":24,"text":83,"correct":26},{"key":28,"text":87,"correct":22},{"key":31,"text":124,"correct":22},"截水",{"id":126,"libraryId":5,"type":60,"typeLabel":61,"stem":127,"options":128,"answer":139,"analysis":33},1144411,"截水帷幕目前常用的形式有（ ）。",[129,131,133,135,137],{"key":20,"text":130,"correct":26},"高压喷射注浆法",{"key":24,"text":132,"correct":22},"压实法",{"key":28,"text":134,"correct":22},"井点降水法",{"key":31,"text":136,"correct":26},"小齿口钢板桩",{"key":73,"text":138,"correct":26},"深层水泥土搅拌桩","ADE",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":20,"analysis":33},1144412,"具有较为简单，排水量大，降水较深等优点的井点排水方法是（ ）。",[144,146,147,148],{"key":20,"text":145,"correct":26},"真空井点",{"key":24,"text":83,"correct":22},{"key":28,"text":85,"correct":22},{"key":31,"text":87,"correct":22},{"id":150,"libraryId":5,"type":60,"typeLabel":61,"stem":151,"options":152,"answer":163,"analysis":33},1144413,"基坑较深时，较适宜采用管井降水方法的情况有（ ）。",[153,155,157,159,161],{"key":20,"text":154,"correct":22},"上层滞水",{"key":24,"text":156,"correct":26},"含水丰富的潜水",{"key":28,"text":158,"correct":26},"承压水",{"key":31,"text":160,"correct":22},"含水量不大的潜水",{"key":73,"text":162,"correct":26},"裂隙水","BCE",{"id":165,"libraryId":5,"type":60,"typeLabel":61,"stem":166,"options":167,"answer":177,"analysis":33},1144415,"排降水危及基坑及周边环境安全时，应采用的措施有（ ）。",[168,169,171,173,175],{"key":20,"text":124,"correct":26},{"key":24,"text":170,"correct":26},"回灌",{"key":28,"text":172,"correct":22},"抽水",{"key":31,"text":174,"correct":22},"排水",{"key":73,"text":176,"correct":22},"降水","AB",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},1144416,"下列各项中，属透水挡土结构的是（ ）。",[182,184,186,187],{"key":20,"text":183,"correct":22},"深层搅拌水泥土墙",{"key":24,"text":185,"correct":22},"密排桩间加高层喷射水泥注浆桩",{"key":28,"text":25,"correct":22},{"key":31,"text":188,"correct":26},"H型钢桩加横插挡土板",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":20,"analysis":33},1144417,"某基坑降水可能引起邻近建（构）筑物、管线的不均匀沉降或开裂，此基坑宜选用的降水方案是（ ）。",[193,195,197,199],{"key":20,"text":194,"correct":26},"井点回灌",{"key":24,"text":196,"correct":22},"板柱隔离",{"key":28,"text":198,"correct":22},"土体注浆",{"key":31,"text":200,"correct":22},"开挖沟槽",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":31,"analysis":33},1144418,"工程基坑开挖采用井点回灌技术的主要目的是（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":22},"避免坑底土体回弹",{"key":24,"text":208,"correct":22},"避免坑底出现管涌",{"key":28,"text":210,"correct":22},"减少排水设施，降低施工成本",{"key":31,"text":212,"correct":26},"防止降水井点对井点周围建（构）筑物、地下管线的影响",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":28,"analysis":33},1144419,"对渗透系数为0.0001cm\u002Fs的黏性土层，若降水深度要求达到15m，单级降水一般应考虑采用（ ）降水方法。",[217,219,220,221],{"key":20,"text":218,"correct":22},"集水明排",{"key":24,"text":145,"correct":22},{"key":28,"text":83,"correct":26},{"key":31,"text":87,"correct":22},{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":20,"analysis":33},1144420,"关于土方开挖的顺序、方法的说法，正确的是（ ）。",[226,228,230,232],{"key":20,"text":227,"correct":26},"开槽支撑，先撑后挖，分层开挖",{"key":24,"text":229,"correct":22},"支撑开槽，先撑后挖，分层开挖",{"key":28,"text":231,"correct":22},"开槽支撑，后挖先撑，分层开挖",{"key":31,"text":233,"correct":22},"支撑开槽，后挖先撑，分层开挖",{"id":235,"libraryId":5,"type":60,"typeLabel":61,"stem":236,"options":237,"answer":248,"analysis":33},1144421,"关于土方开挖的说法，正确的有（ ）。",[238,240,242,244,246],{"key":20,"text":239,"correct":22},"基坑开挖可采用机械直接开挖至基底标高",{"key":24,"text":241,"correct":26},"基坑开挖方案应根据支护结构设计、降排水要求确定",{"key":28,"text":243,"correct":26},"土方开挖前应先进行测量定位，设置好控制点",{"key":31,"text":245,"correct":26},"软土基坑必须分层均衡开挖",{"key":73,"text":247,"correct":26},"基坑开挖完成后应及时验槽，减少暴露时间","BCDE",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":20,"analysis":33},1144422,"基坑开挖宽度较大且局部地段无法放坡时，应采取加固措施的部位是（ ）。",[253,255,257,259],{"key":20,"text":254,"correct":26},"下部坡脚",{"key":24,"text":256,"correct":22},"上部坡顶",{"key":28,"text":258,"correct":22},"中部坡面",{"key":31,"text":260,"correct":22},"坑顶四周",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":31,"analysis":33},1144423,"（ ）设备较为简单，排水量大，降水较深",[265,266,267,269],{"key":20,"text":81,"correct":22},{"key":24,"text":83,"correct":22},{"key":28,"text":268,"correct":22},"回灌井点",{"key":31,"text":270,"correct":26},"真空降水管井",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":31,"analysis":33},1144425,"土方开挖必须做好基坑排水、截水和降水措施，地下水位应保持低于设计槽底至少（ ）mm。",[275,277,279,281],{"key":20,"text":276,"correct":22},"200",{"key":24,"text":278,"correct":22},"300",{"key":28,"text":280,"correct":22},"400",{"key":31,"text":282,"correct":26},"500",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":24,"analysis":33},1144426,"在地下水位以下挖土施工时，应将水位降低至基底以下至少（ ）。",[287,289,291,293],{"key":20,"text":288,"correct":22},"30cm",{"key":24,"text":290,"correct":26},"50cm",{"key":28,"text":292,"correct":22},"80cm",{"key":31,"text":294,"correct":22},"120cm",{"id":296,"libraryId":5,"type":60,"typeLabel":61,"stem":297,"options":298,"answer":102,"analysis":33},1144427,"浅基坑开挖时，应对（ ）等经常复测检查。",[299,301,303,305,307],{"key":20,"text":300,"correct":26},"水准点",{"key":24,"text":302,"correct":22},"坑底标高",{"key":28,"text":304,"correct":26},"边坡坡度",{"key":31,"text":306,"correct":26},"水平标高",{"key":73,"text":308,"correct":26},"基坑平面位置",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":24,"analysis":33},1144428,"关于基坑开挖预留土层的说法，正确的是（ ）。",[313,315,317,319],{"key":20,"text":314,"correct":22},"人工挖土不能立即进行下道工序时，保留土层厚度为10～15cm",{"key":24,"text":316,"correct":26},"机械开挖在基底标高以上预留一层结合人工挖掘修整",{"key":28,"text":318,"correct":22},"使用铲运机、推土机时，保留土层厚度为15～30cm",{"key":31,"text":320,"correct":22},"使用正铲、反铲或拉铲挖土时，保留土层厚度为30～40cm",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":28,"analysis":33},1144429,"下列深基坑工程挖土方案中，属于无支护结构挖土的是（ ）。",[325,327,329,331],{"key":20,"text":326,"correct":22},"墩式挖土",{"key":24,"text":328,"correct":22},"盆式挖土",{"key":28,"text":330,"correct":26},"放坡挖土",{"key":31,"text":332,"correct":22},"逆作挖土",{"id":334,"libraryId":5,"type":60,"typeLabel":61,"stem":335,"options":336,"answer":345,"analysis":33},1144430,"深基坑工程有支护结构的挖土方案有（ ）。",[337,338,340,341,343],{"key":20,"text":330,"correct":22},{"key":24,"text":339,"correct":26},"中心岛式挖土",{"key":28,"text":328,"correct":26},{"key":31,"text":342,"correct":26},"逆作法挖土",{"key":73,"text":344,"correct":22},"大开挖","BCD",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":20,"analysis":33},1144431,"深基坑工程的挖土方案中，无支护结构的是（ ）。",[350,351,352,353],{"key":20,"text":330,"correct":26},{"key":24,"text":339,"correct":22},{"key":28,"text":328,"correct":22},{"key":31,"text":342,"correct":22},{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":20,"analysis":33},1144432,"关于相邻基坑开挖施工程序的说法，正确的是（ ）。",[358,360,362,364],{"key":20,"text":359,"correct":26},"自上而下，水平分段，一次修坡",{"key":24,"text":361,"correct":22},"自上而下，竖向分段，一次修坡",{"key":28,"text":363,"correct":22},"自上而下，水平分段，分层修坡",{"key":31,"text":365,"correct":22},"自上而下，竖向分段，分层修坡",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":20,"analysis":33},1144433,"关于浅基坑相邻基坑开挖施工程序的说法，正确的是（ ）。",[370,371,372,373],{"key":20,"text":359,"correct":26},{"key":24,"text":361,"correct":22},{"key":28,"text":363,"correct":22},{"key":31,"text":365,"correct":22},{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":24,"analysis":33},1144434,"设计无要求时，降水工作应持续到（ ）施工完成。",[378,380,382,384],{"key":20,"text":379,"correct":22},"底板",{"key":24,"text":381,"correct":26},"基础",{"key":28,"text":383,"correct":22},"装饰装修",{"key":31,"text":385,"correct":22},"主体结构",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":31,"analysis":33},1144435,"可以用作填方土料的土料是（ ）。",[390,392,394,396],{"key":20,"text":391,"correct":22},"淤泥",{"key":24,"text":393,"correct":22},"淤泥质土",{"key":28,"text":395,"correct":22},"有机质大于5%的土",{"key":31,"text":397,"correct":26},"黏性土",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":24,"analysis":33},1144436,"基坑土方填筑应（ ）进行回填和夯实。",[402,404,406,408],{"key":20,"text":403,"correct":22},"从一侧向另一侧平推",{"key":24,"text":405,"correct":26},"在相对两侧或周围同时",{"key":28,"text":407,"correct":22},"由近到远",{"key":31,"text":409,"correct":22},"在基坑卸土方便处",{"id":411,"libraryId":5,"type":60,"typeLabel":61,"stem":412,"options":413,"answer":424,"analysis":33},1144437,"关于土方填筑与压实的说法，正确的有（ ）。",[414,416,418,420,422],{"key":20,"text":415,"correct":22},"直接将基底充分夯实和碾压密实",{"key":24,"text":417,"correct":26},"填土应从场地最低处开始，由下而上分层铺填",{"key":28,"text":419,"correct":22},"填土应在宽度上分幅分层进行铺填",{"key":31,"text":421,"correct":26},"填方应在相对两侧或周围同时进行回填和夯实",{"key":73,"text":423,"correct":22},"填土只能采用同类土填筑","BD",{"id":426,"libraryId":5,"type":60,"typeLabel":61,"stem":427,"options":428,"answer":439,"analysis":33},1144438,"验槽时必须具备的资料和条件有（ ）。",[429,431,433,435,437],{"key":20,"text":430,"correct":26},"勘察、设计、建设、监理、施工等单位技术人员到场",{"key":24,"text":432,"correct":26},"基础施工图和结构总说明",{"key":28,"text":434,"correct":26},"轻型岩土触探记录（可不进行时除外）",{"key":31,"text":436,"correct":26},"地基处理或深基础施工质量检测报告",{"key":73,"text":438,"correct":22},"槽底未有明显的机械车辙痕迹，底土未扰动等条件良好的基槽","ABCD",{"id":441,"libraryId":5,"type":60,"typeLabel":61,"stem":442,"options":443,"answer":102,"analysis":33},1144439,"关于观察法验槽内容的说法，正确的有（ ）。",[444,446,448,450,452],{"key":20,"text":445,"correct":26},"对于基底以下的土层不可见部位，要辅以钎探法配合完成",{"key":24,"text":447,"correct":22},"观察槽壁、槽底的土质情况后，不需要验证基槽的开挖深度",{"key":28,"text":449,"correct":26},"观察基槽边坡是否稳定，是否有影响边坡稳定的因素存在",{"key":31,"text":451,"correct":26},"观察基槽内有无旧的房基、洞穴、古井、掩埋的管道和人防设施",{"key":73,"text":453,"correct":26},"在进行直接观察时，可用袖珍式贯入仪作为辅助手段",{"id":455,"libraryId":5,"type":60,"typeLabel":61,"stem":456,"options":457,"answer":102,"analysis":33},1144440,"关于天然地基验槽主要内容的说法，正确的有（ ）。",[458,460,462,464,466],{"key":20,"text":459,"correct":26},"检查基底土质的扰动情况及扰动的范围和程度",{"key":24,"text":461,"correct":22},"核对基坑土质及地下水情况是否与基础施工图相符",{"key":28,"text":463,"correct":26},"检查空穴，古井，古墓，暗沟，地下埋设物及防空掩体等情况，并应查明其位置",{"key":31,"text":465,"correct":26},"根据勘察报告核对坑底，坑边岩土体及地下水情况",{"key":73,"text":467,"correct":26},"根据勘察、设计设计图纸检查基坑的平面位置、尺寸、坑底标高",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":24,"analysis":33},1144441,"在基坑验槽时，对于基底以下不可见部位的土层，要先辅以配合观察的方法是（ ）。",[472,474,476,478],{"key":20,"text":473,"correct":22},"局部开挖",{"key":24,"text":475,"correct":26},"钎探",{"key":28,"text":477,"correct":22},"钻孔",{"key":31,"text":479,"correct":22},"超声波检测",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":20,"analysis":33},1144442,"基坑验槽方法通常主要采用（ ）为主。",[484,486,488,490],{"key":20,"text":485,"correct":26},"观察法",{"key":24,"text":487,"correct":22},"轻型动力触探",{"key":28,"text":489,"correct":22},"钎探法",{"key":31,"text":491,"correct":22},"经验法",{"id":493,"libraryId":5,"type":60,"typeLabel":61,"stem":494,"options":495,"answer":439,"analysis":33},1144443,"关于验槽时必须具备的资料和条件的说法，正确的有（ ）。",[496,498,500,502,503],{"key":20,"text":497,"correct":26},"勘察、设计、建设（或监理）、施工等单位有关负责人及技术人员到场",{"key":24,"text":499,"correct":26},"地基基础设计文件",{"key":28,"text":501,"correct":26},"岩土工程勘察报告",{"key":31,"text":436,"correct":26},{"key":73,"text":438,"correct":22},{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":24,"analysis":33},1144444,"关于大体积混凝土浇筑的说法，正确的是（）。2018真题",[508,510,512,514],{"key":20,"text":509,"correct":22},"宜沿短边方向进行",{"key":24,"text":511,"correct":26},"可多点同时浇筑",{"key":28,"text":513,"correct":22},"宜从高处开始",{"key":31,"text":515,"correct":22},"应采用平板振捣器振捣",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":20,"analysis":33},1144445,"关于大体积混凝土、设备基础分层浇筑顺序的说法，正确的是（ ）。",[520,522,524,526],{"key":20,"text":521,"correct":26},"从低处开始，沿长边方向自一端向另一端浇筑",{"key":24,"text":523,"correct":22},"从低处开始，沿短边方向自一端向另一端浇筑",{"key":28,"text":525,"correct":22},"从高处开始，沿长边方向自一端向另一端浇筑",{"key":31,"text":527,"correct":22},"从高处开始，沿短边方向自一端向另一端浇筑",{"id":529,"libraryId":5,"type":60,"typeLabel":61,"stem":530,"options":531,"answer":542,"analysis":33},1144446,"关于砌体基础施工技术的说法，正确的是（ ）。",[532,534,536,538,540],{"key":20,"text":533,"correct":26},"防潮层宜设置在室外散水顶面以上和室内地面以下的砌体内",{"key":24,"text":535,"correct":22},"地基为新近填土时宜增设混凝土基础圈梁，可不配筋",{"key":28,"text":537,"correct":26},"多孔砖砌体水平、竖向灰缝宽度可为10mm，正负偏差2mm",{"key":31,"text":539,"correct":26},"卫生间的空心小砌块墙下应灌实一皮砖，或设置高200mm混凝土带",{"key":73,"text":541,"correct":22},"底层室内地面以上300mm线以下砌块砌体，应用C20混凝土灌实砌体孔洞","ACD",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":24,"analysis":33},1144447,"关于砌体基础施工技术的说法，正确的是（ ），",[547,549,551,553],{"key":20,"text":548,"correct":22},"构造柱可不单独设置基础，但应伸入室外地面下400mm",{"key":24,"text":550,"correct":26},"地基有软弱黏性,设计无要求时，基础圈梁截面高度不应小于180mm",{"key":28,"text":552,"correct":22},"多孔砖砌体采用铺浆法砌筑时，铺浆长度不得超过600mm",{"key":31,"text":554,"correct":22},"有防水要求的空心小砌块墙下应灌实一皮砖或设置高100mm的混凝土带",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":31,"analysis":33},1144448,"大体积混凝土养护期间必须控制混凝土内外温差，当设计无要求时，应控制在（ ）以内。",[559,561,563,565],{"key":20,"text":560,"correct":22},"10℃",{"key":24,"text":562,"correct":22},"15℃",{"key":28,"text":564,"correct":22},"20℃",{"key":31,"text":566,"correct":26},"25℃",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":31,"analysis":33},1144449,"大体积混凝土不宜使用的水泥是（ ）。",[571,573,575,577],{"key":20,"text":572,"correct":22},"普通水泥",{"key":24,"text":574,"correct":22},"矿渣水泥",{"key":28,"text":576,"correct":22},"粉煤灰水泥",{"key":31,"text":578,"correct":26},"硅酸盐水泥",{"id":580,"libraryId":5,"type":60,"typeLabel":61,"stem":581,"options":582,"answer":593,"analysis":33},1144450,"大体积混凝土的浇筑方案主要有（ ）等方式。",[583,585,587,589,591],{"key":20,"text":584,"correct":26},"全面分层",{"key":24,"text":586,"correct":26},"分段分层",{"key":28,"text":588,"correct":26},"斜面分层",{"key":31,"text":590,"correct":22},"竖直分层",{"key":73,"text":592,"correct":22},"交错分层","ABC",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":24,"analysis":33},1144451,"关于大体积混凝土保湿养护持续时间最小值的说法，正确的是（ ）d。",[598,600,602,604],{"key":20,"text":599,"correct":22},"10",{"key":24,"text":601,"correct":26},"14",{"key":28,"text":603,"correct":22},"21",{"key":31,"text":605,"correct":22},"28",{"id":607,"libraryId":5,"type":60,"typeLabel":61,"stem":608,"options":609,"answer":139,"analysis":33},1144452,"下列施工措施中，有利于大体积混凝土裂缝控制的是（ ）。",[610,612,614,616,618],{"key":20,"text":611,"correct":26},"选用低水化热的水泥",{"key":24,"text":613,"correct":22},"提高水灰比",{"key":28,"text":615,"correct":22},"提高混凝土的入模温度",{"key":31,"text":617,"correct":26},"及时对混凝土进行保温、保湿养护",{"key":73,"text":619,"correct":26},"采用二次抹面工艺",{"id":621,"libraryId":5,"type":60,"typeLabel":61,"stem":622,"options":623,"answer":439,"analysis":33},1144453,"关于基础工程大体积混凝土浇筑施工技术的说法，正确的有（ ）。",[624,626,628,630,632],{"key":20,"text":625,"correct":26},"浇筑方案可以选择整体分层连续浇筑施工",{"key":24,"text":627,"correct":26},"浇筑方案可以选择推移式连续浇筑施工方式",{"key":28,"text":629,"correct":26},"混凝土浇筑宜从低处开始，沿长边方向自一端向另一端进行",{"key":31,"text":631,"correct":26},"当混凝土供应量有保证时，亦可多点同时浇筑",{"key":73,"text":633,"correct":22},"保湿养护的持续时间不得少于7d",{"id":635,"libraryId":5,"type":60,"typeLabel":61,"stem":636,"options":637,"answer":648,"analysis":33},1144454,"关于大体积混凝土施工所采取的措施，合理的有（ ）。",[638,640,642,644,646],{"key":20,"text":639,"correct":26},"掺入一定量的缓凝减水剂",{"key":24,"text":641,"correct":26},"掺入适量微膨胀剂",{"key":28,"text":643,"correct":22},"尽量增加水泥用量",{"key":31,"text":645,"correct":22},"选用硅酸盐水泥",{"key":73,"text":647,"correct":26},"混凝土内部采取人工降温措施","ABE",[650,653,656,659,662,665],{"id":15,"name":651,"category":7,"favorite":652},"领导干部任职前廉政法规知识测试题",92,{"id":654,"name":655,"category":7,"favorite":15},595,"建筑结构与设备",{"id":657,"name":658,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":660,"name":661,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":663,"name":664,"category":7,"favorite":8},534,"BIM工程师",{"id":666,"name":664,"category":7,"favorite":8},535]