[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-800-10":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":664},{"id":5,"name":6,"category":7,"favorite":8},800,"一建建筑工程实务","建筑工程",0,10,50,2362,[13,34,46,64,79,93,105,117,129,141,156,171,183,195,210,222,237,252,267,279,293,305,317,332,347,359,371,386,398,413,425,439,451,462,474,488,500,512,524,538,548,562,576,588,598,608,623,634,642,656],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1143836,1,"单选题","某项目施工成本数据如下表， 根据差额计算法， 成本降低率提高对成本降低额的影响程度为（）万元。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","0.6",false,{"key":24,"text":25,"correct":22},"B","0.7",{"key":27,"text":28,"correct":22},"C","1.1",{"key":30,"text":31,"correct":32},"D","1.2",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1143838,"施工成本定性预测方法中， 国内普遍采用的方法是（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"德尔菲法",{"key":24,"text":41,"correct":32},"专家会议法",{"key":27,"text":43,"correct":22},"专家预测法",{"key":30,"text":45,"correct":22},"回归分析法",{"id":47,"libraryId":5,"type":48,"typeLabel":49,"stem":50,"options":51,"answer":63,"analysis":33},1143840,2,"多选题","项目资金预算表包括（）。",[52,54,56,58,60],{"key":20,"text":53,"correct":32},"期初资金结余",{"key":24,"text":55,"correct":32},"现金收入合计",{"key":27,"text":57,"correct":22},"罚款支出",{"key":30,"text":59,"correct":32},"当月净现金流",{"key":61,"text":62,"correct":32},"E","累计净现金流","ABDE",{"id":65,"libraryId":5,"type":48,"typeLabel":49,"stem":66,"options":67,"answer":78,"analysis":33},1143842,"在正常条件下， 关于建设工程各项目法定最低保修期限的说法， 正确的有（）。",[68,70,72,74,76],{"key":20,"text":69,"correct":32},"屋面防水工程为5年",{"key":24,"text":71,"correct":22},"设备安装和装修工程为5年",{"key":27,"text":73,"correct":22},"供热与供冷系统为2年",{"key":30,"text":75,"correct":32},"保温工程为5年",{"key":61,"text":77,"correct":32},"给排水管道为2年","ADE",{"id":80,"libraryId":5,"type":48,"typeLabel":49,"stem":81,"options":82,"answer":78,"analysis":33},1143844,"某工程施工期间发生工程变更， 导致措施项目费用调整， 下列调整措施正确的有（）。",[83,85,87,89,91],{"key":20,"text":84,"correct":32},"安全文明施工费按照实际发生变化的措施项目调整，不得浮动",{"key":24,"text":86,"correct":22},"安全文明施工费按照实际发生变化的措施项目调整，可以浮动",{"key":27,"text":88,"correct":22},"总价计算的措施项目费，按实际发生变化的措施项目调整",{"key":30,"text":90,"correct":32},"工程设计变更引起施工方案改变，并使措施项目发生变化的，承包人提出调整措施项目费的，应事先将拟实施的方案提交发包人确认",{"key":61,"text":92,"correct":32},"承包人未事先将拟实施的方案提交给发包人，视为放弃调整",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":30,"analysis":33},1143846,"按“制造成本法” 进行核算项目成本， 作为期间费用的是（）。",[97,99,101,103],{"key":20,"text":98,"correct":22},"项目管理人员的工资",{"key":24,"text":100,"correct":22},"项目人员的培训费用",{"key":27,"text":102,"correct":22},"场地清理费用",{"key":30,"text":104,"correct":32},"企业总部的管理费",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":20,"analysis":33},1143848,"下列成本分析方法中， 最常用的是（）。",[109,111,113,115],{"key":20,"text":110,"correct":32},"因素分析法",{"key":24,"text":112,"correct":22},"比较法",{"key":27,"text":114,"correct":22},"比率法",{"key":30,"text":116,"correct":22},"分部分项工程成本分析",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":27,"analysis":33},1143850,"某施工项目的商品混凝土目标成本是 420000 元(目标产量 500m3， 目标单价 800 元\u002Fm3， 预计损耗率为 5%)， 实际成本是 511680 元(实际产量 600m3， 实际单价 820 元\u002Fm3， 实际损耗率为 4%)。 若采用因素分析法进行成本分析(因素的排列顺序是： 产量、 单价、 损耗量)， 则由于产量提高增加的成本是（） 元。",[121,123,125,127],{"key":20,"text":122,"correct":22},"4920",{"key":24,"text":124,"correct":22},"12600",{"key":27,"text":126,"correct":32},"84000",{"key":30,"text":128,"correct":22},"91680",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":27,"analysis":33},1143851,"在地水中挖土， 效率最高的挖土机械是（）。",[133,135,137,139],{"key":20,"text":134,"correct":22},"反铲挖掘机",{"key":24,"text":136,"correct":22},"抓铲挖掘机",{"key":27,"text":138,"correct":32},"拉铲挖掘机",{"key":30,"text":140,"correct":22},"正铲挖掘机",{"id":142,"libraryId":5,"type":48,"typeLabel":49,"stem":143,"options":144,"answer":155,"analysis":33},1143852,"项目机械设备的使用管理制度的“三定” 制度， 具体指（），",[145,147,149,151,153],{"key":20,"text":146,"correct":32},"定人",{"key":24,"text":148,"correct":22},"定措施",{"key":27,"text":150,"correct":32},"定机",{"key":30,"text":152,"correct":32},"定岗位责任",{"key":61,"text":154,"correct":22},"定期限","ACD",{"id":157,"libraryId":5,"type":48,"typeLabel":49,"stem":158,"options":159,"answer":170,"analysis":33},1143853,"机械设备的成本费用分为可变费用与固定费用两大类， 下列属于固定费用的有（）。",[160,162,164,166,168],{"key":20,"text":161,"correct":22},"操作人员工资",{"key":24,"text":163,"correct":32},"大修理费",{"key":27,"text":165,"correct":32},"投资应付利息",{"key":30,"text":167,"correct":22},"燃料动力费",{"key":61,"text":169,"correct":32},"机械管理费","BCE",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":24,"analysis":33},1143854,"关于项目机械设备的使用管理制度的说法，错误的是（）。",[175,177,179,181],{"key":20,"text":176,"correct":22},"“三定”制度是指定人、定机、定岗位责任的制度",{"key":24,"text":178,"correct":32},"操作人员做到“三懂四会”",{"key":27,"text":180,"correct":22},"项目机械管理人员要对机械操作人员进行安全技术书面交底，并有机械操作人签字",{"key":30,"text":182,"correct":22},"机械操作人员必须持证上岗且作人员应随身携带操作证",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":27,"analysis":33},1143855,"关于施工现场材料检验的说法，正确的是（）。",[187,189,191,193],{"key":20,"text":188,"correct":22},"建筑材料复试送检的检测试样可以在施工现场外抽取",{"key":24,"text":190,"correct":22},"工程取样送检见证人由监理单位书面确认",{"key":27,"text":192,"correct":32},"施工单位的验证不能代替建设单位所采购物资的质量责任",{"key":30,"text":194,"correct":22},"建设单位的验证可以代替施工单位所采购物资的质量责任",{"id":196,"libraryId":5,"type":48,"typeLabel":49,"stem":197,"options":198,"answer":209,"analysis":33},1143856,"下列属于分包单位劳务员向总包单位备案的是（）。",[199,201,203,205,207],{"key":20,"text":200,"correct":22},"月度考勤表",{"key":24,"text":202,"correct":32},"花名册",{"key":27,"text":204,"correct":32},"身份证",{"key":30,"text":206,"correct":32},"劳动合同文本",{"key":61,"text":208,"correct":32},"岗位技能证书","BCDE",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":27,"analysis":33},1143857,"下列流水施工的基本组织形式中，其专业工作队数大于施工过程数的是（）。",[214,216,218,220],{"key":20,"text":215,"correct":22},"等节奏流水施工",{"key":24,"text":217,"correct":22},"异步距异节奏流水施工",{"key":27,"text":219,"correct":32},"等步距异节奏流水施工",{"key":30,"text":221,"correct":22},"无节奏流水施工",{"id":223,"libraryId":5,"type":48,"typeLabel":49,"stem":224,"options":225,"answer":236,"analysis":33},1143858,"可以起到防止深基坑坑底突涌的措施有（ ）",[226,228,230,232,234],{"key":20,"text":227,"correct":22},"集水明排",{"key":24,"text":229,"correct":32},"钻孔减压",{"key":27,"text":231,"correct":22},"井点降水",{"key":30,"text":233,"correct":22},"井点回灌",{"key":61,"text":235,"correct":32},"水平封底隔渗","BE",{"id":238,"libraryId":5,"type":48,"typeLabel":49,"stem":239,"options":240,"answer":251,"analysis":33},1143859,"关于塔吊安装、 拆除的说法， 正确的有（ ）。",[241,243,245,247,249],{"key":20,"text":242,"correct":32},"塔吊安装、拆除之前，应制定专项施工方案",{"key":24,"text":244,"correct":22},"安装和拆除塔吊的专业队伍可不具备相应资质，但需有类似施工经验",{"key":27,"text":246,"correct":22},"塔吊安装完毕，经试运转试验和验收合格后即可使用",{"key":30,"text":248,"correct":32},"施工现场多塔作业，塔机间应保持安全距离",{"key":61,"text":250,"correct":22},"塔吊在六级大风中作业时，应减缓起吊速度","AD",{"id":253,"libraryId":5,"type":48,"typeLabel":49,"stem":254,"options":255,"answer":266,"analysis":33},1143860,"关于施工现场消防管理的说法， 正确的有（ ）。",[256,258,260,262,264],{"key":20,"text":257,"correct":32},"动火证当日有效",{"key":24,"text":259,"correct":32},"施工现场严禁吸烟",{"key":27,"text":261,"correct":32},"应配备义务消防人员",{"key":30,"text":263,"correct":22},"易燃材料仓库应设在上风方向",{"key":61,"text":265,"correct":22},"油漆料库内应设置调料间","ABC",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":20,"analysis":33},1143861,"高温季节施工， 混凝土入模温度不应高于（ ） ℃， 大体积防水防水混凝土入模温度不应高于（ ） ℃。",[271,273,275,277],{"key":20,"text":272,"correct":32},"35；30",{"key":24,"text":274,"correct":22},"30；35",{"key":27,"text":276,"correct":22},"30；30",{"key":30,"text":278,"correct":22},"35；35",{"id":280,"libraryId":5,"type":48,"typeLabel":49,"stem":281,"options":282,"answer":209,"analysis":33},1143862,"土方开挖过程中， 工程质量检查的内容有（ ）。",[283,285,287,289,291],{"key":20,"text":284,"correct":22},"定位放线",{"key":24,"text":286,"correct":32},"排水和降低地下水位系统",{"key":27,"text":288,"correct":32},"平面布置",{"key":30,"text":290,"correct":32},"水平标高",{"key":61,"text":292,"correct":32},"压实度",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":20,"analysis":33},1143863,"施工现场临时用电设备在 5 台及以上或设备总容量达到（ ） kW 及以上者， 应编制用电组织设计。",[297,299,301,303],{"key":20,"text":298,"correct":32},"50",{"key":24,"text":300,"correct":22},"100",{"key":27,"text":302,"correct":22},"150",{"key":30,"text":304,"correct":22},"200",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":27,"analysis":33},1143864,"下列关于现场宿舍管理说法不正确的是（ ）。",[309,311,313,315],{"key":20,"text":310,"correct":22},"现场宿舍必须设置可开启式窗户，宿舍内的床铺不得超过2层，严禁使用通铺",{"key":24,"text":312,"correct":22},"现场宿舍内应保证有充足的空间，室内净高不得小于2.5m",{"key":27,"text":314,"correct":32},"通道宽度不得小于0.8m",{"key":30,"text":316,"correct":22},"每间宿舍居住人员不得超过16人",{"id":318,"libraryId":5,"type":48,"typeLabel":49,"stem":319,"options":320,"answer":331,"analysis":33},1143865,"关于吊装工程构件堆放时的要求， 下列说法错误的有（ ）。",[321,323,325,327,329],{"key":20,"text":322,"correct":22},"构件堆放处，底部按设计位置设置垫木",{"key":24,"text":324,"correct":32},"构件多层叠放时，梁不超过5层",{"key":27,"text":326,"correct":22},"钢屋架多层叠放时，各层的支承垫木应在同一垂直线上",{"key":30,"text":328,"correct":32},"钢屋架多层叠放时，各堆放构件之间应留不小于0.5m宽的通道",{"key":61,"text":330,"correct":22},"重心较高的屋架堆放时，应在两侧加设支撑","BD",{"id":333,"libraryId":5,"type":48,"typeLabel":49,"stem":334,"options":335,"answer":346,"analysis":33},1143866,"现场计算临时总用水量应包括（ ）。",[336,338,340,342,344],{"key":20,"text":337,"correct":32},"施工用水量",{"key":24,"text":339,"correct":32},"消防用水量",{"key":27,"text":341,"correct":32},"施工机械用水量",{"key":30,"text":343,"correct":22},"商品混凝土拌合用水量",{"key":61,"text":345,"correct":32},"临水管道水量损失量","ABCE",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":30,"analysis":33},1143867,"在正常使用条件下， 保温工程的最低保修期限为（ ） 年。",[351,353,355,357],{"key":20,"text":352,"correct":22},"10",{"key":24,"text":354,"correct":22},"8",{"key":27,"text":356,"correct":22},"6",{"key":30,"text":358,"correct":32},"5",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":24,"analysis":33},1143868,"利用绿化代替场地硬化， 属于绿色工程施工中的（ ）。",[363,365,367,369],{"key":20,"text":364,"correct":22},"节材与材料资源利用",{"key":24,"text":366,"correct":32},"节地与施工用地保护",{"key":27,"text":368,"correct":22},"节能与能源利用",{"key":30,"text":370,"correct":22},"节水与水资源利用",{"id":372,"libraryId":5,"type":48,"typeLabel":49,"stem":373,"options":374,"answer":385,"analysis":33},1143869,"必须参加单位工程竣工验收的单位有（）。",[375,377,379,381,383],{"key":20,"text":376,"correct":32},"建设单位",{"key":24,"text":378,"correct":32},"施工单位",{"key":27,"text":380,"correct":32},"勘察单位",{"key":30,"text":382,"correct":32},"监理单位",{"key":61,"text":384,"correct":22},"材料供应单位","ABCD",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":27,"analysis":33},1143870,"当非竖向洞口短边边长为 500mm～1500mm 时， 应采取的措施是（ ）。",[390,392,394,396],{"key":20,"text":391,"correct":22},"采用密目式安全立网或工具式栏板封闭",{"key":24,"text":393,"correct":22},"采用承载力满足使用要求的盖板覆盖，盖板四周搁置应均衡，且应防止盖板移位",{"key":27,"text":395,"correct":32},"采用盖板覆盖或防护栏杆等措施，并应固定牢固",{"key":30,"text":397,"correct":22},"在洞口作业侧设置高度不小于1.2m的防护栏杆，洞口应采用安全平网封闭",{"id":399,"libraryId":5,"type":48,"typeLabel":49,"stem":400,"options":401,"answer":412,"analysis":33},1143871,"下列关于悬挑式操作平台的说法错误的是（ ）。",[402,404,406,408,410],{"key":20,"text":403,"correct":22},"操作平台的搁置点、拉结点、支撑点应设置在稳定的主体结构上",{"key":24,"text":405,"correct":22},"斜拉式操作平台两侧应设置前后两道斜拉钢丝绳与吊环连接",{"key":27,"text":407,"correct":32},"支承式悬挑式操作平台，钢平台下方至少设置不少于一道斜撑",{"key":30,"text":409,"correct":32},"悬臂梁式的操作平台下部应选用钢管做支承",{"key":61,"text":411,"correct":32},"悬挑式操作平台钢丝绳数量不得少于3个","CDE",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":20,"analysis":33},1143872,"施工现场室外消火栓间距不大于（ ）。",[417,419,421,423],{"key":20,"text":418,"correct":32},"120m",{"key":24,"text":420,"correct":22},"140m",{"key":27,"text":422,"correct":22},"160m",{"key":30,"text":424,"correct":22},"180m",{"id":426,"libraryId":5,"type":48,"typeLabel":49,"stem":427,"options":428,"answer":412,"analysis":33},1143873,"关于装饰装修施工阶段的质量管理， 说法正确的有（ ）。",[429,431,433,435,437],{"key":20,"text":430,"correct":22},"施工主管向施工工长做详尽的图纸、施工方法、质量标准交底",{"key":24,"text":432,"correct":22},"工序开始前工长向班组长做详细的图纸工艺要求、质量要求交底",{"key":27,"text":434,"correct":32},"作业开始前班长向班组成员做具体的操作方法、工具使用、质量要求的详细交底",{"key":30,"text":436,"correct":32},"对于重要的工序或对工程质量有重大影响的工序，在自检、互检的基础上，还要组织专职人员进行工序交接检查",{"key":61,"text":438,"correct":32},"凡是隐蔽工程均应检查认证后方能掩盖",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":30,"analysis":33},1143874,"关于等节奏流水施工的说法，错误的是（）。",[443,445,447,449],{"key":20,"text":444,"correct":22},"各施工过程在各个施工段流水节拍相等",{"key":24,"text":446,"correct":22},"相邻施工过程的流水步距相等",{"key":27,"text":448,"correct":22},"专业工作队数等于施工过程数",{"key":30,"text":450,"correct":32},"各专业工作队在各施工段上不能连续作业",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":20,"analysis":33},1143875,"图书馆、 资料室、 档案室和存放文物的房间， 其顶棚、 墙面应采用（ ） 级装修材料。",[455,456,458,460],{"key":20,"text":20,"correct":32},{"key":24,"text":457,"correct":22},"B1",{"key":27,"text":459,"correct":22},"B2",{"key":30,"text":461,"correct":22},"B3",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":24,"analysis":33},1143876,"下列不属于项目成本核算三同步原则的是（ ）。",[466,468,470,472],{"key":20,"text":467,"correct":22},"形象进度",{"key":24,"text":469,"correct":32},"纠正偏差",{"key":27,"text":471,"correct":22},"产值统计",{"key":30,"text":473,"correct":22},"成本归集",{"id":475,"libraryId":5,"type":48,"typeLabel":49,"stem":476,"options":477,"answer":155,"analysis":33},1143877,"对于民用建筑工程室内环境污染物的控制中， 以下哪几种民用建筑物中不属于 I 类（ ）",[478,480,482,484,486],{"key":20,"text":479,"correct":32},"书店",{"key":24,"text":481,"correct":22},"幼儿园",{"key":27,"text":483,"correct":32},"餐厅",{"key":30,"text":485,"correct":32},"旅馆",{"key":61,"text":487,"correct":22},"医院",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":27,"analysis":33},1143878,"项目质量管理程序的第一步是（ ）。",[492,494,496,498],{"key":20,"text":493,"correct":22},"收集分析质量信息并制定预防措施",{"key":24,"text":495,"correct":22},"编制项目质量计划",{"key":27,"text":497,"correct":32},"明确项目质量目标",{"key":30,"text":499,"correct":22},"实施项目质量计划",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":24,"analysis":33},1143879,"燃烧性能等级为 B1 级的装修材料其燃烧性为（ ）。",[504,506,508,510],{"key":20,"text":505,"correct":22},"不燃",{"key":24,"text":507,"correct":32},"难燃",{"key":27,"text":509,"correct":22},"可燃",{"key":30,"text":511,"correct":22},"易燃",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":24,"analysis":33},1143880,"城市地下管线普查和补测补绘形成的地下管线档案应当在结束后（ ） 内移交档案馆",[516,518,520,522],{"key":20,"text":517,"correct":22},"1个月",{"key":24,"text":519,"correct":32},"3个月",{"key":27,"text":521,"correct":22},"5个月",{"key":30,"text":523,"correct":22},"6个月",{"id":525,"libraryId":5,"type":48,"typeLabel":49,"stem":526,"options":527,"answer":63,"analysis":33},1143881,"受控制的室内环境污染物有（ ）。",[528,530,532,534,536],{"key":20,"text":529,"correct":32},"A.氡",{"key":24,"text":531,"correct":32},"甲醛",{"key":27,"text":533,"correct":22},"乙醇",{"key":30,"text":535,"correct":32},"苯",{"key":61,"text":537,"correct":32},"总挥发性有机化合物（TVO",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":27,"analysis":33},1143883,"建设单位应当在工程竣工验收后（） 内， 向城建档案馆报送一套符合规定的建设工程档案。",[542,544,546,547],{"key":20,"text":543,"correct":22},"30d",{"key":24,"text":545,"correct":22},"60d",{"key":27,"text":519,"correct":32},{"key":30,"text":523,"correct":22},{"id":549,"libraryId":5,"type":48,"typeLabel":49,"stem":550,"options":551,"answer":63,"analysis":33},1143884,"下列关于工程建设安全事故的说法， 错误的有（）。",[552,554,556,558,560],{"key":20,"text":553,"correct":32},"事故发生后，事故现场有关人员应立即向项目负责人报告",{"key":24,"text":555,"correct":32},"单位负责人接到报告后应当于2h内向事故发生地县级以上人民政府安全生产监督管理部门和负有安全生产监督管理职责的有关部门报告",{"key":27,"text":557,"correct":22},"重大安全事故应由省级人民政府负责调查",{"key":30,"text":559,"correct":32},"较大安全事故应逐级上报至国务院安全生产监督管理部门和负有安全生产监督管理职责的有关部门",{"key":61,"text":561,"correct":32},"道路交通事故、火灾事故自发生之日起30d内事故造成的伤亡人数发生变化的，应当及时补报",{"id":563,"libraryId":5,"type":48,"typeLabel":49,"stem":564,"options":565,"answer":331,"analysis":33},1143885,"下列关于危险性较大的分部分项工程安全管理的说法， 正确的有（）。",[566,568,570,572,574],{"key":20,"text":567,"correct":22},"施工总承包单位将深基坑等专业工程实行分包的，应由施工总承包单位组织编制",{"key":24,"text":569,"correct":32},"专项施工方案经审核合格的，由施工单位技术负责人签字",{"key":27,"text":571,"correct":22},"不需要论证的专项方案，经施工单位审核合格后，由专业分包单位报监理单位，由专业监理工程师审核签字",{"key":30,"text":573,"correct":32},"需要论证的专项施工方案，实行施工总承包的，由施工总承包单位组织召开专家论证会",{"key":61,"text":575,"correct":22},"施工单位应根据论证报告修改完善专项方案，并经施工单位技术负责人、项目总经理工程师签字后即可组织实施",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":27,"analysis":33},1143886,"专项方案实施前， 应由（） 向现场管理人员和作业人员进行安全技术交底。",[580,582,584,586],{"key":20,"text":581,"correct":22},"项目专职安全员",{"key":24,"text":583,"correct":22},"质检员",{"key":27,"text":585,"correct":32},"项目技术负责人",{"key":30,"text":587,"correct":22},"项目负责人",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":27,"analysis":33},1143887,"列入城建档案馆接收的工程，（） 组织工程档案预验收。",[592,593,594,596],{"key":20,"text":376,"correct":22},{"key":24,"text":382,"correct":22},{"key":27,"text":595,"correct":32},"城建档案管理机构",{"key":30,"text":597,"correct":22},"城乡规划主管部门",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":30,"analysis":33},1143888,"（） 应当向施工单位提供施工现场和毗邻区域内供水、 供电、 供气、 通信等地下管线资料， 气象和水文观测资料等， 并保证资料的真实、 准确、 完整。",[602,604,606,607],{"key":20,"text":603,"correct":22},"城建档案馆",{"key":24,"text":605,"correct":22},"建设行政主管部门",{"key":27,"text":382,"correct":22},{"key":30,"text":376,"correct":32},{"id":609,"libraryId":5,"type":48,"typeLabel":49,"stem":610,"options":611,"answer":622,"analysis":33},1143889,"下列分部分项工程需要编制专项方案且需专家论证的有（）。",[612,614,616,618,620],{"key":20,"text":613,"correct":32},"开挖深度为5m的基坑支护工程",{"key":24,"text":615,"correct":22},"附着式整体和分片提升脚手架工程",{"key":27,"text":617,"correct":32},"水下作业工程",{"key":30,"text":619,"correct":32},"开挖深度为18m的人工挖孔桩",{"key":61,"text":621,"correct":32},"地下暗挖工程","ACDE",{"id":624,"libraryId":5,"type":15,"typeLabel":16,"stem":625,"options":626,"answer":24,"analysis":33},1143890,"一般情况下， 大修的城市道路竣工后（） 年内不得挖掘。",[627,629,631,633],{"key":20,"text":628,"correct":22},"2",{"key":24,"text":630,"correct":32},"3",{"key":27,"text":632,"correct":22},"4",{"key":30,"text":358,"correct":22},{"id":635,"libraryId":5,"type":15,"typeLabel":16,"stem":636,"options":637,"answer":20,"analysis":33},1143891,"停建、 缓建工程的档案， 应该由（） 保管。",[638,639,640,641],{"key":20,"text":376,"correct":32},{"key":24,"text":378,"correct":22},{"key":27,"text":382,"correct":22},{"key":30,"text":603,"correct":22},{"id":643,"libraryId":5,"type":48,"typeLabel":49,"stem":644,"options":645,"answer":266,"analysis":33},1143892,"应当参加专项施工方案的专家论证会的人员包括（）。",[646,648,650,652,654],{"key":20,"text":647,"correct":32},"建设单位的项目技术负责人",{"key":24,"text":649,"correct":32},"总监理工程师",{"key":27,"text":651,"correct":32},"施工单位技术负责人",{"key":30,"text":653,"correct":22},"设计单位项目负责人",{"key":61,"text":655,"correct":22},"建设单位负责人",{"id":657,"libraryId":5,"type":15,"typeLabel":16,"stem":658,"options":659,"answer":27,"analysis":33},1143893,"地下工程防水等级分为（） 级。",[660,661,662,663],{"key":20,"text":628,"correct":22},{"key":24,"text":630,"correct":22},{"key":27,"text":632,"correct":32},{"key":30,"text":358,"correct":22},[665,668,671,674,677,680],{"id":15,"name":666,"category":7,"favorite":667},"领导干部任职前廉政法规知识测试题",92,{"id":669,"name":670,"category":7,"favorite":15},595,"建筑结构与设备",{"id":672,"name":673,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":675,"name":676,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":678,"name":679,"category":7,"favorite":8},534,"BIM工程师",{"id":681,"name":679,"category":7,"favorite":8},535]