[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1145775":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1145775,800,2,"多选题","关于地面工程基层铺设的做法，正确的有（ ） 2011年",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","灰土垫层采用熟化石灰与黏土(或粉质黏土、粉土)的拌和料铺设",true,{"key":16,"text":17,"correct":18},"B","三合土垫层采用石灰、碎石土与碎砖的拌和料铺设",false,{"key":20,"text":21,"correct":14},"C","四合土垫层采用水泥、石灰、砂土与碎砖的拌和料铺设",{"key":23,"text":24,"correct":14},"D","炉渣垫层采用炉渣或水泥、石灰与炉渣的拌和料铺设",{"key":26,"text":27,"correct":14},"E","水泥混凝土垫层铺设，当气温长期处于0℃以下，设计无要求时，垫层应设置伸缩缝","ACDE","换填垫层法",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]