[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1145749":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1145749,800,1,"单选题","建设工程的保修期自（ ）之日起计算。（2016 年真题）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工完成",false,{"key":16,"text":17,"correct":18},"B","竣工验收合格",true,{"key":20,"text":21,"correct":14},"C","竣工验收备案",{"key":23,"text":24,"correct":14},"D","工程移交","建设工程的保修期自竣工验收合格之日起计算。",{"id":6,"name":27,"category":28,"favorite":29},"一建建筑工程实务","建筑工程",0]