[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1145697":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1145697,800,2,"多选题","下列混凝土灌注桩桩质量检查项目中，在混凝土浇筑前进行检查的有（ ）。（2014 年真题）",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","孔深",true,{"key":16,"text":17,"correct":14},"B","孔径",{"key":19,"text":20,"correct":21},"C","桩身完整性",false,{"key":23,"text":24,"correct":21},"D","承载力",{"key":26,"text":27,"correct":14},"E","沉渣厚度","ABE","CD是成桩后检查的内容。@##",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]