[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1145644":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1145644,800,2,"多选题","无粘接预应力施工包含的工序有（ ）。（2016 年真题）",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","预应力筋下料",true,{"key":16,"text":17,"correct":18},"B","预留孔道",false,{"key":20,"text":21,"correct":14},"C","预应力筋张拉",{"key":23,"text":24,"correct":18},"D","孔道灌浆",{"key":26,"text":27,"correct":14},"E","锚头处理","ACE","在无粘结预应力施工中， 主要工作是无粘结预应力筋的铺设、张拉和锚固区的处理。",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]