[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1145591":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1145591,800,2,"多选题","（2019真题）基坑土钉墙施工需遵循的原则有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","同步支护",false,{"key":16,"text":17,"correct":18},"B","分层分段",true,{"key":20,"text":21,"correct":14},"C","多层施作",{"key":23,"text":24,"correct":18},"D","限时封闭",{"key":26,"text":27,"correct":18},"E","严禁超挖","BDE","P85 本题考查的是深基坑支护。土钉墙施工必须遵循“超前支护，分层分段，逐层施作，限时封闭，严禁超挖”的原则要求。",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]