[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1145437":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1145437,800,1,"单选题","当屋面坡度达到（ ）时，卷材必须采取满粘和钉压固定措施。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","3%",false,{"key":16,"text":17,"correct":14},"B","10%",{"key":19,"text":20,"correct":14},"C","15%",{"key":22,"text":23,"correct":24},"D","25%",true,"2020教材P411 \u002F 2019教材P412 （1）屋面坡度大于25%时，卷材应采取满粘和钉压固定措施。",{"id":6,"name":27,"category":28,"favorite":29},"一建建筑工程实务","建筑工程",0]