[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1145408":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1145408,800,1,"单选题","国家标准《建筑节能工程施工质量验收规范》GB50411规定：单位工程竣工验收应（ ）进行。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","与建筑节能工程验收同时",false,{"key":16,"text":17,"correct":18},"B","在建筑节能分部工程验收合格后",true,{"key":20,"text":21,"correct":14},"C","在建筑节能分部工程验收前",{"key":23,"text":24,"correct":14},"D","在建筑节能分部工程投入使用满10天后","2020教材P422 \u002F 2019教材P423 （3）单位工程竣工验收应在建筑节能分部工程验收合格后进行。",{"id":6,"name":27,"category":28,"favorite":29},"一建建筑工程实务","建筑工程",0]