[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1145369":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1145369,800,1,"单选题","关于多层及高层钢结构安装工程的说法，正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","所有构件的中心线及标高基准点等标记必须齐全",false,{"key":16,"text":17,"correct":18},"B","结构楼层标高可以按相对标高进行控制",true,{"key":20,"text":21,"correct":14},"C","上层柱的定位轴线可从下层柱的轴线引上",{"key":23,"text":24,"correct":14},"D","柱、梁、支撑等构件的长度尺寸应等于构件的设计长度尺寸，偏差控制在允许范围之内","2020教材P406\u002F 2019教材P407 七、多层及高层钢结构安装工程（一）一般规定（1）柱、梁、支撑等构件的长度尺寸应包括焊接收缩余量等变形值。（2）安装柱时，每节柱的定位轴线应从地面控制轴线直接引上，不得从下层柱的轴线引上。（3）结构的楼层标高可按相对标高或设计标高进行控制。",{"id":6,"name":27,"category":28,"favorite":29},"一建建筑工程实务","建筑工程",0]