[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1145366":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1145366,800,2,"多选题","钢结构涂装工程中，防腐涂料的涂料、涂装遍数、涂层厚度应符合设计要求，当设计对涂层厚度无要求时，涂层干漆膜应满足（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","总厚度室外应为150μm",true,{"key":16,"text":17,"correct":18},"B","总厚度室外可为125μm",false,{"key":20,"text":21,"correct":14},"C","总厚度室内应为125μm",{"key":23,"text":24,"correct":18},"D","每遍厚度允许偏差为-5μm",{"key":26,"text":27,"correct":18},"E","每遍厚度允许偏差为±5μm","AC","2020教材P407 \u002F 2019教材P408 防腐涂料涂装主控项目：涂料、涂装遍数、涂层厚度均应符合设计要求。当设计对涂层厚度无要求时，涂层干漆膜总厚度：室外应为150μm，室内应为125μm，其允许偏差为-25μm。每遍涂层干漆膜厚度的允许偏差为-5μm。@##",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]