[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1145359":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1145359,800,2,"多选题","灰土地基、砂和砂石地基在施工过程中应检查的项目有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","总铺设厚度",false,{"key":16,"text":17,"correct":18},"B","分段施工时搭接部分的夯实情况",true,{"key":20,"text":21,"correct":18},"C","加水量",{"key":23,"text":24,"correct":18},"D","压实遍数",{"key":26,"text":27,"correct":18},"E","压实系数","BCDE","2020教材P378 \u002F 2019教材P379 砂和砂石地基：施工前应检查砂，石等原材料质量和配合比及砂，石拌合的均匀性，施工中应检查分层厚度，分段施工时夯实情况，加水量、压实遍数、压实系数。",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]