[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1145358":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1145358,800,1,"单选题","基坑土方开挖的顺序、方法必须与设计要求相一致，并遵循“开槽支撑，（ ），严禁超挖”的原则。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","先撑后挖，整体开挖",false,{"key":16,"text":17,"correct":18},"B","先撑后挖，分层开挖",true,{"key":20,"text":21,"correct":14},"C","先挖后撑，整体开挖",{"key":23,"text":24,"correct":14},"D","先挖后撑，分层开挖","2020教材P380 \u002F 2019教材P381 1）土方开挖的顺序、方法必须与设计工况相一致，并遵循“开槽支撑，先撑后挖，分层开挖，严禁超挖”的原则。",{"id":6,"name":27,"category":28,"favorite":29},"一建建筑工程实务","建筑工程",0]