[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1145357":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1145357,800,1,"单选题","土方开挖前应检查的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","定位放线、周围环境和降低地下水位系统",false,{"key":16,"text":17,"correct":14},"B","定位放线、压实度和周围环境",{"key":19,"text":20,"correct":21},"C","定位放线，排水和地下水控制系统，以及对周边影响范围内地下管线和建（构）筑物保护措施的落实",true,{"key":23,"text":24,"correct":14},"D","定位放线、运输路线和排水降水系统","2020教材P380 \u002F 2019教材P381 施工前应检查支护结构质量，定位放线，排水和地下水控制系统，以及对周边影响范围内地下管线和建（构）筑物保护措施的落实，并应合理安排土方运输车车的行走路线及弃土场。",{"id":6,"name":27,"category":28,"favorite":29},"一建建筑工程实务","建筑工程",0]