[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1145350":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1145350,800,1,"单选题","关于砂石桩施工顺序，说法正确的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","对于砂土地基宜从中间向两侧进行",false,{"key":16,"text":17,"correct":14},"B","对黏性土地基宜从外围向中间进行",{"key":19,"text":20,"correct":21},"C","对黏性土地基宜从中间向外围或隔排施工",true,{"key":23,"text":24,"correct":14},"D","与既有建筑邻近施工时应采用隔排施工","2020教材P389 \u002F 2019教材P390 六、砂石桩法（3）砂石桩的施工顺序，对砂土地基宜从外围或两侧向中间进行，对黏性土地基宜从中间向外围或隔排施工；在既有建（构）筑物邻近施工时，应背离建（构）筑物方向进行",{"id":6,"name":27,"category":28,"favorite":29},"一建建筑工程实务","建筑工程",0]