[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1145263":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1145263,800,1,"单选题","向当地城建档案管理部门移交工程竣工档案的责任单位是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","建设单位",true,{"key":16,"text":17,"correct":18},"B","监理单位",false,{"key":20,"text":21,"correct":18},"C","施工单位",{"key":23,"text":24,"correct":18},"D","分包单位","2020教材P356 \u002F 2019教材P357 建设单位应当在工程竣工验收后3个月内，向城建档案馆报送一套符合规定的建设工程档案。",{"id":6,"name":27,"category":28,"favorite":29},"一建建筑工程实务","建筑工程",0]