[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1145255":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1145255,800,1,"单选题","关于建设单位提请城建档案管理机构对地下管线工程档案进行专项预验收时机的说法，正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","竣工验收前",true,{"key":16,"text":17,"correct":18},"B","覆土前",false,{"key":20,"text":21,"correct":18},"C","竣工验收备案前",{"key":23,"text":24,"correct":18},"D","工程移交使用前","2020教材P356 \u002F 2019教材P357 列入城建档案馆档案接受的工程，建设单位在组织施工在组织竣工前，应当提请城建档案管理机构对工程档案进行预验收。",{"id":6,"name":27,"category":28,"favorite":29},"一建建筑工程实务","建筑工程",0]