[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1145229":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1145229,800,2,"多选题","材料采购应按照企业()的要求，依据项目经理部提出的材料计划进行采购。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","质量管理体系",true,{"key":16,"text":17,"correct":18},"B","质量保证体系",false,{"key":20,"text":21,"correct":18},"C","技术管理体系",{"key":23,"text":24,"correct":14},"D","环境管理体系",{"key":26,"text":27,"correct":18},"E","物资管理体系","AD","2020教材P333 \u002F 2019教材P335 (2)材料采购应按照企业质量管理体系和环境管理体系的要求，依据项目经理部提出的材料计划进行采购。",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]