[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1145193":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1145193,800,2,"多选题","工程备料款数额的计算公式：工程备料款数额=（合同造价×材料比重）／年度施工天数×材料储备天数，公式中的材料储备天数应该由以下（ ）等因素决定。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","当地材料供应的在途天数",true,{"key":16,"text":17,"correct":14},"B","材料的整理天数",{"key":19,"text":20,"correct":21},"C","材料订购办理手续的天数",false,{"key":23,"text":24,"correct":14},"D","加工天数",{"key":26,"text":27,"correct":14},"E","保险天数","ABDE","2020教材P313 \u002F 2019教材P315 公式中：年度施工天数按365天日历天计算；材料储备天数由当地材料供应的在途天数、加工天数、整理天数、供应间隔天数、保险天数等因素决定。",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]