[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1145184":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1145184,800,2,"多选题","关于建筑安装工程费用项目按照费用构成要素划分，其组成部分有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","人工费",true,{"key":16,"text":17,"correct":14},"B","材料费",{"key":19,"text":20,"correct":14},"C","施工机具使用费",{"key":22,"text":23,"correct":24},"D","措施费",false,{"key":26,"text":27,"correct":24},"E","其他项目费","ABC","2020教材P302 \u002F 2019教材P304 一、按费用构成要素划分建筑安装工程费按照费用构成要素划分：由人工费、材料（包含工程设备，下同）费、施工机具使用费、企业管理费、利润、规费和税金组成。",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]