[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1145172":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1145172,800,2,"多选题","其他项目清单内容列项是（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","风险费用",false,{"key":16,"text":17,"correct":18},"B","暂列金额",true,{"key":20,"text":21,"correct":18},"C","暂估价",{"key":23,"text":24,"correct":18},"D","总包服务费",{"key":26,"text":27,"correct":18},"E","计日工","BCDE","2020教材P304 \u002F 2019教材P305 其他项目费。内容包括：暂列金额、计日工、总承包服务费、暂估价。",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]