[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1145157":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1145157,800,1,"单选题","措施项目可计量部分应按分部分项工程量清单的方式采用综合单价计价；其余的措施项目部分可以“项”为单位的方式计价，应包括除（ ）外的全部费用。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","税金",false,{"key":16,"text":17,"correct":14},"B","规费",{"key":19,"text":20,"correct":14},"C","利润",{"key":22,"text":23,"correct":24},"D","规费和税金",true,"2020教材P299 \u002F 2019教材P301 工程量清单是指建设工程的分部分项工程项目、措施项目、其他项目、规费项目和税金项目的名称和相应数量等的明细清单，是招标文件的组成部分，",{"id":6,"name":27,"category":28,"favorite":29},"一建建筑工程实务","建筑工程",0]