[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1145151":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1145151,800,1,"单选题","招标文件中，招标方提供的暂估价材料应（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","不能按暂估的单价计入综合单价",false,{"key":16,"text":17,"correct":14},"B","可不按暂估的单价计入综合单价",{"key":19,"text":20,"correct":14},"C","按材料的市场单价计入综合单价",{"key":22,"text":23,"correct":24},"D","按暂估的单价计入综合单价",true,"2020教材P301 \u002F 2019教材P303 材料暂估价应按招标人在其他项目清单中列出的单价计人综合单价；",{"id":6,"name":27,"category":28,"favorite":29},"一建建筑工程实务","建筑工程",0]