[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1145116":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1145116,800,2,"多选题","关于脚手架工程检查与验收的说法，正确的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","脚手架基础完工后，架体搭设前应进行检查与验收",true,{"key":16,"text":17,"correct":18},"B","架体每搭设完10m高度后应进行一次检查与验收",false,{"key":20,"text":21,"correct":14},"C","作业层上施加荷载前应进行检查与验收",{"key":23,"text":24,"correct":18},"D","架体停用超过两周后应进行检查与验收",{"key":26,"text":27,"correct":14},"E","架体搭设到原施工组织设计预定高度后应进行检查与验收","ACE","2020教材P266 \u002F 2019教材P268 脚手架在下列阶段应进行检查与验收（1）脚手架基础完工后，架体搭设前；（2）每搭设完6-8m高度后；（3）作业层上施加荷载前；（4）达到设计高度后或遇有六级及以上风或大雨后，冻结地区解冻后；（5）停用超过一个月。",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]