[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1145056":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1145056,800,1,"单选题","填充墙与承重主体结构间的空（缝）隙部位施工，应在填充墙砌筑（ ）后进行。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","3d",false,{"key":16,"text":17,"correct":14},"B","7d",{"key":19,"text":20,"correct":14},"C","10d",{"key":22,"text":23,"correct":24},"D","14d",true,"2020教材P240 \u002F 2019教材P242 2）填充墙粱下口最后3皮砖应在下部墙砌完14d后砌筑，并由中间开始向两边斜砌。",{"id":6,"name":27,"category":28,"favorite":29},"一建建筑工程实务","建筑工程",0]