[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1145037":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1145037,800,2,"多选题","重锤夯实或强夯地基工程施工过程中，工程质量查验的项目有（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","落距",true,{"key":16,"text":17,"correct":14},"B","夯击遍数",{"key":19,"text":20,"correct":14},"C","夯点位置",{"key":22,"text":23,"correct":14},"D","夯击范围",{"key":25,"text":26,"correct":27},"E","地基的承载力",false,"ABCD","2020教材P226 \u002F 2019教材P228 三、强夯地基工程施工前应检查夯锤质量、尺寸、落距控制手段、排水设施及被夯地基的土质。施工中应检查落距、夯击遍数、夯点位置、夯击范围。施工结束后，检查被夯地基的强度并进行承载力检验。",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]