[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1145021":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1145021,800,2,"多选题","厕浴间、厨房聚氨酯防水涂料施工工艺流程中，保护层、饰面层施工前应进行的工序包括（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","清理基层",true,{"key":16,"text":17,"correct":14},"B","细部附加层施工",{"key":19,"text":20,"correct":14},"C","多遍涂刷聚氨酯防水涂料",{"key":22,"text":23,"correct":14},"D","第一次蓄水试验",{"key":25,"text":26,"correct":27},"E","第二次蓄水试验",false,"ABCD","2020教材P229 \u002F 2019教材P231 厨房、厕浴间防水层完成后，应做24h蓄水试验，确认无渗漏时再做保护层和面层。设备与饰面层施工完后还应在其上继续做第二次24h蓄水试验，达到最终无渗漏和排水畅通为合格，方可进行正式验收。墙面间歇淋水试验应达到30min以上不渗漏。",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]