[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1144925":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1144925,800,2,"多选题","当下列情况发生时，应调整施工检测试验计划的有()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","设计变更",true,{"key":16,"text":17,"correct":18},"B","检测单位改变",false,{"key":20,"text":21,"correct":18},"C","见证人变更",{"key":23,"text":24,"correct":14},"D","施工进度调整",{"key":26,"text":27,"correct":14},"E","材料型号变更","ADE","2020教材P193 \u002F 2019教材P195 施工检测试验计划中的计划检测试验时间，应根据工程施工进度计划确定。当设计变更，施工工艺改变，施工进度调整，材料和设备的规格、型号或数量变化时，应及时调整施工检测试验计划。",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]