[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1144921":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1144921,800,2,"多选题","关于冬期桩基施工的说法，正确的有()。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","当冻土层厚度超过500mm，冻土层宜采用钻孔机引孔",true,{"key":16,"text":17,"correct":14},"B","采用钻孔机引孔，引孔直径不宜大于桩径20mm",{"key":19,"text":20,"correct":14},"C","振动沉管成孔施工有间歇时，宜将桩管埋人桩孔中进行保温",{"key":22,"text":23,"correct":24},"D","桩基静荷载试验前，应对试桩周围地表土和锚桩横梁支座进行保温",false,{"key":26,"text":27,"correct":24},"E","试验期间，应将试桩周围的冻土融化或挖除","ABC","2020教材P195 \u002F 2019教材P197 (4)桩基施工时。当冻土层厚度超过500mm.冻土层宜采用钻孔机引孔，引孔直径不宜大于粧径20mm.振动沉管成孔施工有间歇时，宜将桩管埋入桩孔中进行保温。(5)预制桩沉桩应连续进行，施工完成后应采用保温材料覆盖桩头上进行保温。(6)桩基静荷载试验前，应将试桩周围的冻土融化或挖除。试验期间，应对试桩周围地表土和锚粧横梁支座进行保温.",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]