[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1144915":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1144915,800,2,"多选题","冬期施工混凝土配合比确定依据有()。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","环境气温",true,{"key":16,"text":17,"correct":14},"B","原材料",{"key":19,"text":20,"correct":21},"C","初凝时间",false,{"key":23,"text":24,"correct":14},"D","混凝土性能要求",{"key":26,"text":27,"correct":14},"E","养护方法","ABDE","2020教材P196 \u002F 2019教材P198 4.混凝土工程(2)冬期施工混凝土配合比应根据施工期间环境气温、原材料、养护方法、混凝土性能要求等经试验确定，并宜选择较小的水胶比和坍落度。",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]