[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1144909":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1144909,800,2,"多选题","关于混凝土施工期间的测温项目与频次的说法，正确的有()。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","室外气温测量最高、最低气温",true,{"key":16,"text":17,"correct":14},"B","环境温度每昼夜不少于4次",{"key":19,"text":20,"correct":21},"C","搅拌机棚温度每一工作班不少于3次",false,{"key":23,"text":24,"correct":21},"D","外加剂溶液温度每一工作班不少于2次",{"key":26,"text":27,"correct":14},"E","混凝土出机、浇筑、入模温度每一工作班不少于4次","ABE","2020教材P197 \u002F 2019教材P199 (6）施工期间的测温项目与频次应符合表1A421062-3规定，正确答案见表格，室外气温：测量最高、最低气温；环境温度：每昼夜不少于4次；搅拌机棚温度：每一工作班不少于4次；水、水泥、矿物掺合料、砂、石及外加剂溶液温度：每一工作班不少于4次；混凝土出机、浇筑、人模温度：每一工作班不少于4次；",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]