[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1144883":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1144883,800,2,"多选题","施工BIM模型应包括()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","深化设计模型",true,{"key":16,"text":17,"correct":18},"B","仿真计算模型",false,{"key":20,"text":21,"correct":18},"C","实验模型",{"key":23,"text":24,"correct":14},"D","施工过程模型",{"key":26,"text":27,"correct":14},"E","竣工验收模型","ADE","2020教材P207 \u002F 2019教材P209 施工BIM应用宜包括工程项目深化设计、施工实施、竣工验收等的施工全过程，也可根据工程项目实际需要应用于某些环节或任务。",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]