[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1144814":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1144814,800,2,"多选题","施工现场在电缆线路通过时应用套钢管进行保护的部位()。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","电缆过墙部位",true,{"key":16,"text":17,"correct":14},"B","电缆过道部位",{"key":19,"text":20,"correct":21},"C","通过消防箱时",false,{"key":23,"text":24,"correct":21},"D","通过现场配电箱时",{"key":26,"text":27,"correct":14},"E","电缆过临建设施时","ABE","2020教材P175 \u002F 2019教材P177 (4)直接埋地敷设的电缆过墙、过道、过临建设施时，应套钢管保护。",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]