[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1144807":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1144807,800,2,"多选题","以下各项线路布置时，须要短路保护和过载保护的是()。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","架空线路敷设",true,{"key":16,"text":17,"correct":14},"B","电缆线路敷设",{"key":19,"text":20,"correct":14},"C","室内配线敷设",{"key":22,"text":23,"correct":24},"D","室外线路敷设",false,{"key":26,"text":27,"correct":24},"E","照明线路敷设","ABC","2020教材P175 \u002F 2019教材P177 架空线路敷设基本要求5)架空线路必须有过载保护。电缆线路敷设基本要求(5)电缆线路必须有短路保护和过载保护。室内配线要求(3)室内配线必须有短路保护和过载保护。",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]