[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1144706":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1144706,800,1,"单选题","关于防水混凝土施工做法，表述错误的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","防水混凝土应采用高频机械分层振捣密实",false,{"key":16,"text":17,"correct":14},"B","施工缝宜留置在受剪力较小、便于施工的部位",{"key":19,"text":20,"correct":14},"C","防水混凝土冬期施工时，其入模温度不应低于5℃",{"key":22,"text":23,"correct":24},"D","防水混凝土终凝后应立即进行养护，养护时间不得少于7d",true,"2020教材P139 \u002F 2019教材P138 （2） 防水混凝土应采用高频机械分层振捣密实， （3） 防水混凝土应连续浇筑，少留施工缝。当留设施工缝时，宜留置在受剪力较小、便于施工的部位。墙体水平施工缝应留在高出楼板表面不小于300mm 的墙体上。 （4） 防水混凝土终凝后应立即进行养护，养护时间不得少于14d； （5） 防水混凝土冬期施工时，其入模温度不应低于5°C；",{"id":6,"name":27,"category":28,"favorite":29},"一建建筑工程实务","建筑工程",0]