[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1144647":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1144647,800,2,"多选题","预制柱安装要求正确的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","按照角柱、边柱、中柱顺序进行安装",true,{"key":16,"text":17,"correct":18},"B","按照边柱、角柱、中柱顺序进行安装",false,{"key":20,"text":21,"correct":18},"C","按照中柱、边柱、角柱顺序进行安装",{"key":23,"text":24,"correct":18},"D","与现浇部分连接的柱应后安装",{"key":26,"text":27,"correct":14},"E","与现浇部分连接的柱宜先安装","AE","2020教材P129 \u002F 2019教材P128 2. 预制柱安装要求 （1） 宜按照角柱、边柱、中柱顺序进行安装，与现浇部分连接的柱宜先行安装。答案选AE。",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]