[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1144445":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1144445,800,1,"单选题","关于大体积混凝土、设备基础分层浇筑顺序的说法，正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","从低处开始，沿长边方向自一端向另一端浇筑",true,{"key":16,"text":17,"correct":18},"B","从低处开始，沿短边方向自一端向另一端浇筑",false,{"key":20,"text":21,"correct":18},"C","从高处开始，沿长边方向自一端向另一端浇筑",{"key":23,"text":24,"correct":18},"D","从高处开始，沿短边方向自一端向另一端浇筑","2020版教材P101 混凝土浇筑宜从低处开始， 沿长边方向自一端向另一端进行。 当混凝土供应量有保证时， 亦可多点同时浇筑。",{"id":6,"name":27,"category":28,"favorite":29},"一建建筑工程实务","建筑工程",0]