[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1144428":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1144428,800,1,"单选题","关于基坑开挖预留土层的说法，正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","人工挖土不能立即进行下道工序时，保留土层厚度为10～15cm",false,{"key":16,"text":17,"correct":18},"B","机械开挖在基底标高以上预留一层结合人工挖掘修整",true,{"key":20,"text":21,"correct":14},"C","使用铲运机、推土机时，保留土层厚度为15～30cm",{"key":23,"text":24,"correct":14},"D","使用正铲、反铲或拉铲挖土时，保留土层厚度为30～40cm","2020\u002F2019版教材P89 基坑开挖应尽量防止对地基土的扰动。 当用人工挖土，基坑挖好后不能立即进行下道工序时，应预留 150 ~ 300mm —层土不挖，待下道工序开始再挖至设计标高。采用机械开挖基坑时，为避免破坏基底土，应在基底标高以上预留 200 ~ 300mm 厚土层人工挖除。",{"id":6,"name":27,"category":28,"favorite":29},"一建建筑工程实务","建筑工程",0]