[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1144427":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1144427,800,2,"多选题","浅基坑开挖时，应对（ ）等经常复测检查。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","水准点",true,{"key":16,"text":17,"correct":18},"B","坑底标高",false,{"key":20,"text":21,"correct":14},"C","边坡坡度",{"key":23,"text":24,"correct":14},"D","水平标高",{"key":26,"text":27,"correct":14},"E","基坑平面位置","ACDE","2020\u002F2019版教材P89 （7） 基坑开挖时，应对平面控制桩、水准点、平面位置、水平标高、边坡坡度、排水、降水系统等经常复测检查。",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]