[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1144360":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1144360,800,1,"单选题","关于建筑物开始沉降观测时间的说法，正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","基础完工或地下室砌筑完后",true,{"key":16,"text":17,"correct":18},"B","主体完工或地下室砌筑完后",false,{"key":20,"text":21,"correct":18},"C","基础垫层或基础底部完成后",{"key":23,"text":24,"correct":18},"D","基础垫层完工或地下室砌筑完后","2020\u002F2019版教材P78 普通建筑可在基础完工或地下室砌筑完后开始变形观测。@##",{"id":6,"name":27,"category":28,"favorite":29},"一建建筑工程实务","建筑工程",0]