[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1144345":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1144345,800,2,"多选题","施工测量现场主要测设工作有（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","长度",true,{"key":16,"text":17,"correct":14},"B","角度",{"key":19,"text":20,"correct":14},"C","平面位置",{"key":22,"text":23,"correct":14},"D","高程位置",{"key":25,"text":26,"correct":27},"E","城市水准点",false,"ABCD","2020\u002F2019版教材P75 施工测量现场主要工作有长度的测设、角度的测设、建筑物细部点的平面位置的测设、建筑物细部点高程位置的测设及倾斜线的测设等。测角 、测距和测高差是测量的基本工作。",{"id":6,"name":31,"category":32,"favorite":33},"一建建筑工程实务","建筑工程",0]